Skip to content

Texas gas well · RRC district 7B · Lease 070902

Producing

MCDANIEL

McDaniel is a gas well in Parker County, Texas, operated by Somerset Operating, LLC in the Meeker (Conglomerate 4400) field. The Railroad Commission shows 3,522 mcf of gas in the 12 months through Jun 2026.

Gas well dossier · 1 well

3,522mcf gas, last 12 months−16% vs prior year
RRC lease
7B-070902

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Parker CountyParkerWiseJackHoodPalo PintoTarrantJohnsonDentonParker County
Parker County · RRC district 7BOpen Parker County →
Gas in Jun 2026
264 mcf
Reporting to the state
since Jan 2020
Wells
1
Data through
Jun 2026

Production

Month by month, from the state record

What the Railroad Commission says this gas well produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Gas output fell 16% over the last 12 months

3,207 mcf in the 12 months through Jul 2026, against 3,796 mcf in the 12 months before. Jul 2026 was not reported. A red cross marks each one.

  • Gas (bars, left axis)
  • Last 12 months
Gas output fell 16% over the last 12 monthsMonthly gas production for MCDANIEL, Aug 2023 to Jul 2026. Gas output fell 16% over the last 12 months. 3,207 mcf in the 12 months through Jul 2026, against 3,796 mcf in the 12 months before.Last 12 months: 3,207 mcfmcf per month0100200300400500Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Gas output fell 16% over the last 12 monthsMonthly gas production for MCDANIEL, Aug 2023 to Jul 2026. Gas output fell 16% over the last 12 months. 3,207 mcf in the 12 months through Jul 2026, against 3,796 mcf in the 12 months before.Last 12 monthsmcf per month0100200300400500Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas well 070902, district 7B. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

All of the gas went to a transmission line in the last 12 months

Each bar is one month. Colors are the disposition codes the operator reported.

All of the gas went to a transmission line in the last 12 monthsShare of MCDANIEL gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a transmission line in the last 12 months. Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
All of the gas went to a transmission line in the last 12 monthsShare of MCDANIEL gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a transmission line in the last 12 months. Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 070902, district 7B. Reported through Jul 2026.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed once, most recently in Sep 2023

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeOxxn, Jan 2020 to Aug 2023; Somerset Operating, LLC, Sep 2023 to Jun 20262020202120222023202420252026Changed Sep 2023OxxnJan 2020 to Aug 2023Somerset Operating, LLCSep 2023 to now
Operators of this lease over timeOxxn, Jan 2020 to Aug 2023; Somerset Operating, LLC, Sep 2023 to Jun 20262020202120222023202420252026Changed Sep 2023OxxnJan 2020 to Aug 2023Somerset Operating, LLCSep 2023 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to gas well 070902 in district 7B. The API number is the state’s ID for a well.
Wells on MCDANIEL
API numberWell no.Status
42-367-303721Shut-in

SourceTexas Railroad Commission Wellbore Query, district 7B, lease 070902.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says MCDANIEL sold each month.

For example 0.00097656, or a fraction like 1/1024.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Gas sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for MCDANIEL
MonthGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026No report–––$80.46$2.89
Jun 2026Somerset Operating,2642640$84.81$3.15
May 2026Somerset Operating,2762760$102.13$2.94
Apr 2026Somerset Operating,2762760$100.32$2.77
Mar 2026Somerset Operating,2762760$91.38$3.04
Feb 2026Somerset Operating,3173170$64.51$3.62
Jan 2026Somerset Operating,3123120$60.04$7.72
Dec 2025Somerset Operating,3173170$57.97$4.26
Nov 2025Somerset Operating,2182180$60.06$3.79
Oct 2025Somerset Operating,3173170$60.89$3.19
Sep 2025Somerset Operating,3173170$63.96$2.97
Aug 2025Somerset Operating,3173170$64.86$2.91
Jul 2025Somerset Operating,3153150$68.39$3.20
Jun 2025Somerset Operating,3003000$68.17$3.02
May 2025Somerset Operating,3173170$62.17$3.12
Apr 2025Somerset Operating,3173170$63.54$3.42
Mar 2025Somerset Operating,3173170$68.24$4.12
Feb 2025Somerset Operating,3143140$71.53$4.19
Jan 2025Somerset Operating,3243240$75.74$4.13
Dec 2024Somerset Operating,3153150$70.12$3.01
Nov 2024Somerset Operating,3173170$69.95$2.12
Oct 2024Somerset Operating,3173170$71.99$2.20
Sep 2024Somerset Operating,3283280$70.24$2.28
Aug 2024Somerset Operating,3153150$76.68$1.99
Jul 2024Somerset Operating,3173170$81.80$2.07
Jun 2024Somerset Operating,3173170$79.77$2.54
May 2024Somerset Operating,3173170$80.02$2.12
Apr 2024Somerset Operating,000$85.35$1.60
Mar 2024Somerset Operating,3173170$81.28$1.49
Feb 2024Somerset Operating,3173170$77.25$1.72
Jan 2024Somerset Operating,3173170$74.15$3.18
Dec 2023Somerset Operating,4724720$71.90$2.52
Nov 2023Somerset Operating,4724720$77.69$2.71
Oct 2023Somerset Operating,4724720$85.64$2.98
Sep 2023Somerset Operating,4724720$89.43$2.64
Aug 2023Oxxn2842840$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for MCDANIEL. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Somerset Operating, LLC.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Somerset Operating, LLC in Parker County

All Somerset Operating, LLC leases →

Meeker (Conglomerate 4400) field

All leases in this field →

New drilling permits in Parker County

We do not have coordinates for this lease, so these are the newest permits in its county.

No recent drilling permits found for this area.

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Gas sold” volume for the month the check covers and multiply it by your decimal. The answer should match the mcf on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jun 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, gas well 070902, district 7B, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.