Skip to content

Texas gas well · RRC district 01 · Lease 166706

Producing

MEADOWS

Meadows is a gas well in Val Verde County, Texas, operated by Wolfcamp Energy, LLC in the Simpson-Mann (Canyon) field. The Railroad Commission shows 1,633 mcf of gas in the 12 months through Jul 2026.

Gas well dossier · 1 well

1,633mcf gas, last 12 months+733% vs prior year
RRC lease
01-166706

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Val Verde CountyVal VerdeSuttonVal Verde County
Val Verde County · RRC district 01Open Val Verde County →
Gas in Jul 2026
333 mcf
Reporting to the state
since Jan 2020
Wells
1
Data through
Jul 2026

Production

Month by month, from the state record

What the Railroad Commission says this gas well produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Gas output rose 733% over the last 12 months

1,633 mcf in the 12 months through Jul 2026, against 196 mcf in the 12 months before.

  • Gas (bars, left axis)
  • Oil (line, right axis)
  • Last 12 months
Gas output rose 733% over the last 12 monthsMonthly gas production and oil for MEADOWS, Aug 2023 to Jul 2026. Gas output rose 733% over the last 12 months. 1,633 mcf in the 12 months through Jul 2026, against 196 mcf in the 12 months before.Last 12 months: 1,633 mcfmcf per monthbbl per month002001400160028002Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Gas output rose 733% over the last 12 monthsMonthly gas production and oil for MEADOWS, Aug 2023 to Jul 2026. Gas output rose 733% over the last 12 months. 1,633 mcf in the 12 months through Jul 2026, against 196 mcf in the 12 months before.Last 12 monthsmcf per monthbbl per month002001400160028002Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas well 166706, district 01. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

Since Mar 2026 the lease's gas goes to a transmission line instead of lease fuel

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

  • Transmission line (2)
  • Lease fuel (1)
Since Mar 2026 the lease's gas goes to a transmission line instead of lease fuelShare of MEADOWS gas by disposition code each month, Aug 2023 to Jul 2026. Since Mar 2026 the lease's gas goes to a transmission line instead of lease fuel. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of the lease’s gas by disposition code, per month0%50%100%Mar 2026: fuel to lineOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Mar 2026 the lease's gas goes to a transmission line instead of lease fuelShare of MEADOWS gas by disposition code each month, Aug 2023 to Jul 2026. Since Mar 2026 the lease's gas goes to a transmission line instead of lease fuel. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of gas by disposition code0%50%100%Mar 26: fuel to lineJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 166706, district 01. Reported through Jul 2026.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

Lease fuel (1)

Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed once, most recently in Nov 2025

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeHexp Operating, LLC, Jan 2020 to Oct 2025; Wolfcamp Energy, LLC, Nov 2025 to Jul 20262020202120222023202420252026Changed Nov 2025Hexp Operating, LLCJan 2020 to Oct 2025Wolfcamp Energy, LLCNov 2025 to now
Operators of this lease over timeHexp Operating, LLC, Jan 2020 to Oct 2025; Wolfcamp Energy, LLC, Nov 2025 to Jul 20262020202120222023202420252026Changed Nov 2025Hexp Operating, LLCJan 2020 to Oct 2025Wolfcamp Energy, LLCNov 2025 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to gas well 166706 in district 01. The API number is the state’s ID for a well.
Wells on MEADOWS
API numberWell no.Status
42-465-305691172Shut-in

SourceTexas Railroad Commission Wellbore Query, district 01, lease 166706.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Gas from gas wells

    Enterprise Hydrocarbons, L.p. buys it; Gateway Gathering & Mktg. Co. gathers it.

    Enterprise Hydrocarbons, L.p. buys it: 100% of it, on the list since Mar 1, 2005 · Gateway Gathering & Mktg. Co. gathers it: 100% of it, on the list since Mar 1, 2000

Companies that used to be listed: Axis Marketing, LLC (gathers it, until Nov 1, 2025); Shell Trading (Us) Company (gathers it, until Apr 1, 2021).

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

2,590 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
0
First completion
Jan 12, 1998
Latest permit
Dec 3, 1997
Wells and acres on the permits for Meadows
API numberWell no.Acreson the permit
42-465-3056911722,590

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says MEADOWS sold each month.

For example 0.00097656, or a fraction like 1/1024.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Gas sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for MEADOWS
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Wolfcamp Energy,003332510$80.46$2.89
Jun 2026Wolfcamp Energy,00000$84.81$3.15
May 2026Wolfcamp Energy,00220$102.13$2.94
Apr 2026Wolfcamp Energy,00000$100.32$2.77
Mar 2026Wolfcamp Energy,0053440$91.38$3.04
Feb 2026Wolfcamp Energy,002401140$64.51$3.62
Jan 2026Wolfcamp Energy,002901110$60.04$7.72
Dec 2025Wolfcamp Energy,00135880$57.97$4.26
Nov 2025Wolfcamp Energy,002411600$60.06$3.79
Oct 2025Hexp Operating,00100470$60.89$3.19
Sep 2025Hexp Operating,002391850$63.96$2.97
Aug 2025Hexp Operating,00000$64.86$2.91
Jul 2025Hexp Operating,00000$68.39$3.20
Jun 2025Hexp Operating,0043360$68.17$3.02
May 2025Hexp Operating,00000$62.17$3.12
Apr 2025Hexp Operating,00000$63.54$3.42
Mar 2025Hexp Operating,00000$68.24$4.12
Feb 2025Hexp Operating,00000$71.53$4.19
Jan 2025Hexp Operating,00000$75.74$4.13
Dec 2024Hexp Operating,00000$70.12$3.01
Nov 2024Hexp Operating,0060470$69.95$2.12
Oct 2024Hexp Operating,0093730$71.99$2.20
Sep 2024Hexp Operating,00000$70.24$2.28
Aug 2024Hexp Operating,00000$76.68$1.99
Jul 2024Hexp Operating,00000$81.80$2.07
Jun 2024Hexp Operating,00000$79.77$2.54
May 2024Hexp Operating,00000$80.02$2.12
Apr 2024Hexp Operating,00000$85.35$1.60
Mar 2024Hexp Operating,00000$81.28$1.49
Feb 2024Hexp Operating,00000$77.25$1.72
Jan 2024Hexp Operating,00000$74.15$3.18
Dec 2023Hexp Operating,00000$71.90$2.52
Nov 2023Hexp Operating,1153270$77.69$2.71
Oct 2023Hexp Operating,004303520$85.64$2.98
Sep 2023Hexp Operating,224513700$89.43$2.64
Aug 2023Hexp Operating,005344090$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for MEADOWS. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Wolfcamp Energy, LLC.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Wolfcamp Energy, LLC in Val Verde County

All Wolfcamp Energy, LLC leases →

Simpson-Mann (Canyon) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

  • MEADOWS

    2,049 mcf last 12 months · 0.5 km away

  • TENNECO FEE

    6,404 mcf last 12 months · 0.7 km away

  • MEADOWS

    2,728 mcf last 12 months · 0.7 km away

  • MEADOWS

    2,730 mcf last 12 months · 0.8 km away

  • MEADOWS

    3,049 mcf last 12 months · 0.9 km away

New drilling permits in Val Verde County

We do not have coordinates for this lease, so these are the newest permits in its county.

No recent drilling permits found for this area.

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Gas sold” volume for the month the check covers and multiply it by your decimal. The answer should match the mcf on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, gas well 166706, district 01, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.