Skip to content
Royalty Clerk

Texas oil lease

Producing

MISTER ED 48-18-7 2B2

Mister Ed 48-18-7 2B2 is an oil lease in Pecos County, Texas, operated by XTO Energy Inc. in the Hoefs T-K (Wolfcamp) field.

1 well

42,793bbl oil, last 12 months+2% vs prior year
RRC lease
08-60378

Is your check right?

Check my statement

Where it sits

This county

Pecos CountyPecosUptonCranePecos County
Pecos County
Gas, last 12 months
102,581 mcf
Oil in Jul 2026
782 bbl

Production by month

Oil output held steady over the last 12 months

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output held steady over the last 12 monthsMonthly oil production and gas for MISTER ED 48-18-7 2B2, Aug 2023 to Jul 2026. Oil output held steady over the last 12 months. 42,793 bbl in the 12 months through Jul 2026, against 41,912 bbl in the 12 months before.Last 12 months: 42,793 bblbbl per monthmcf per month005,0005,00010k10k15k15k20k20k25k25kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output held steady over the last 12 monthsMonthly oil production and gas for MISTER ED 48-18-7 2B2, Aug 2023 to Jul 2026. Oil output held steady over the last 12 months. 42,793 bbl in the 12 months through Jul 2026, against 41,912 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month005,0005,00010k10k15k15k20k20k25k25kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

96% of the gas went to a processing plant in the last 12 months

Flaring peaked at 31.6% of the gas in Jan 2024.

  • Processing plant (3)
  • Lease fuel (1)
  • Flared (4)
96% of the gas went to a processing plant in the last 12 monthsShare of MISTER ED 48-18-7 2B2 gas by disposition code each month, Aug 2023 to Jul 2026. 96% of the gas went to a processing plant in the last 12 months. Flaring peaked at 31.6% of the gas in Jan 2024.Share of the lease’s gas by disposition code, per month0%50%100%Flared 31.6%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
96% of the gas went to a processing plant in the last 12 monthsShare of MISTER ED 48-18-7 2B2 gas by disposition code each month, Aug 2023 to Jul 2026. 96% of the gas went to a processing plant in the last 12 months. Flaring peaked at 31.6% of the gas in Jan 2024.Share of gas by disposition code0%50%100%Flared 31.6%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Processing plant (3)

    96% · 98,607 mcf

  • Lease fuel (1)

    2.7% · 2,752 mcf

  • Flared (4)

    1.2% · 1,222 mcf

1.2% of the gas flared in the last 12 months. 9 months above 3%.

1 well on this lease

Wells on MISTER ED 48-18-7 2B2
API numberWell no.Status
42-371-40413302HActive

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%From
Xto Energy Inc.OilGathers100May 28, 2023
Brazos Midstream Operating, LLCCasinghead gasBuys100May 28, 2023
Brazos Midstream Operating, LLCCasinghead gasGathers100May 28, 2023

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

1,285 acres on the newest permit

  • Worth asking

    An allocation well is on this lease

    A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.

  • Worth asking

    A Rule 37 case is listed

    The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.

Check your decimal on this lease
Permits for Mister Ed 48-18-7 2B2
API numberWell no.Acreson the permit
42-371-40413302H1,285

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for MISTER ED 48-18-7 2B2
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 20267828138348005$80.46$2.89
Jun 20263,1543,15413,94912,922244$84.81$3.15
May 20263,5443,53016,30015,380135$102.13$2.94
Apr 20263,5773,5818,7588,43429$100.32$2.77
Mar 20263,3113,3173,5563,288100$91.38$3.04
Feb 20263,5473,5392,0492,01216$64.51$3.62
Jan 20263,8753,8917,1276,97059$60.04$7.72
Dec 20254,3384,3345,6065,46594$57.97$4.26
Nov 20253,3403,3394,3154,16191$60.06$3.79
Oct 20253,7973,81416,20615,591405$60.89$3.19
Sep 20255,6715,64622,78822,53940$63.96$2.97
Aug 20253,8573,8821,0931,0454$64.86$2.91
Jul 20253,2573,2504,7514,54122$68.39$3.20
Jun 20253,7283,7207,5947,39042$68.17$3.02
May 20253,9583,9502,2192,08461$62.17$3.12
Apr 20254,3784,39121,28820,268375$63.54$3.42
Mar 20253,1253,1259,0938,325212$68.24$4.12
Feb 20252,7482,7462,0001,93725$71.53$4.19
Jan 20253,3223,33412,44111,109845$75.74$4.13
Dec 20244,7164,6682,8222,7220$70.12$3.01
Nov 20241,2951,3013,2803,13918$69.95$2.12
Oct 20242,0382,0553,0703,00720$71.99$2.20
Sep 20244,2064,2343,5053,32866$70.24$2.28
Aug 20245,1415,1405,1894,97272$76.68$1.99
Jul 20245,2655,2475,4725,32530$81.80$2.07
Jun 20244,7894,8046,4046,015269$79.77$2.54
May 20246,5426,5356,0715,670201$80.02$2.12
Apr 20245,7915,8076,6426,114291$85.35$1.60
Mar 20245,5735,5685,9755,476193$81.28$1.49
Feb 20247,6437,6506,7496,51020$77.25$1.72
Jan 20247,0427,0265,3513,4801,691$74.15$3.18
Dec 20237,5107,5305,8525,66437$71.90$2.52
Nov 20237,7807,7806,3866,025232$77.69$2.71
Oct 202313,43413,3728,2516,9381,190$85.64$2.98
Sep 20231,0101,065826688121$89.43$2.64
Aug 20237,1707,1505,9125,74284$81.39$2.58

Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Leases within 10 km

Drilling permits within 10 km