Skip to content
Royalty Clerk

Texas oil lease

Producing

MISTER-ED 48-18-7 2B3

Mister-Ed 48-18-7 2B3 is an oil lease in Pecos County, Texas, operated by XTO Energy Inc. in the Hoefs T-K (Wolfcamp) field.

1 well

67,802bbl oil, last 12 months+57% vs prior year
RRC lease
08-60165

Is your check right?

Check my statement

Where it sits

This county

Pecos CountyPecosUptonCranePecos County
Pecos County
Gas, last 12 months
127,145 mcf
Oil in Jul 2026
4,439 bbl

Production by month

Oil output rose 57% over the last 12 months

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output rose 57% over the last 12 monthsMonthly oil production and gas for MISTER-ED 48-18-7 2B3, Aug 2023 to Jul 2026. Oil output rose 57% over the last 12 months. 67,802 bbl in the 12 months through Jul 2026, against 43,275 bbl in the 12 months before.Last 12 months: 67,802 bblbbl per monthmcf per month002,5005,0005,00010k7,50015k10k20k12.5k25kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output rose 57% over the last 12 monthsMonthly oil production and gas for MISTER-ED 48-18-7 2B3, Aug 2023 to Jul 2026. Oil output rose 57% over the last 12 months. 67,802 bbl in the 12 months through Jul 2026, against 43,275 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month002,5005,0005,00010k7,50015k10k20k12.5k25kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

96% of the gas went to a processing plant in the last 12 months

Flaring peaked at 31.6% of the gas in Jan 2024.

  • Processing plant (3)
  • Lease fuel (1)
  • Flared (4)
96% of the gas went to a processing plant in the last 12 monthsShare of MISTER-ED 48-18-7 2B3 gas by disposition code each month, Aug 2023 to Jul 2026. 96% of the gas went to a processing plant in the last 12 months. Flaring peaked at 31.6% of the gas in Jan 2024.Share of the lease’s gas by disposition code, per month0%50%100%Flared 31.6%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
96% of the gas went to a processing plant in the last 12 monthsShare of MISTER-ED 48-18-7 2B3 gas by disposition code each month, Aug 2023 to Jul 2026. 96% of the gas went to a processing plant in the last 12 months. Flaring peaked at 31.6% of the gas in Jan 2024.Share of gas by disposition code0%50%100%Flared 31.6%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Processing plant (3)

    96% · 122,020 mcf

  • Lease fuel (1)

    2.8% · 3,614 mcf

  • Flared (4)

    1.2% · 1,511 mcf

1.2% of the gas flared in the last 12 months. 9 months above 3%.

1 well on this lease

Wells on MISTER-ED 48-18-7 2B3
API numberWell no.Status
42-371-40414303HActive

SourceTexas Railroad Commission Wellbore Query.

1,285 acres on the newest permit

  • Worth asking

    An allocation well is on this lease

    A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.

  • Worth asking

    A Rule 37 case is listed

    The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.

Check your decimal on this lease
Permits for Mister-Ed 48-18-7 2B3
API numberWell no.Acreson the permit
42-371-40414303H1,285

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for MISTER-ED 48-18-7 2B3
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 20264,4394,43212,97312,44572$80.46$2.89
Jun 20264,1554,1598,9028,246156$84.81$3.15
May 20264,9974,98010,5689,97188$102.13$2.94
Apr 20265,4885,49619,29318,58064$100.32$2.77
Mar 20265,1135,1188,1447,530229$91.38$3.04
Feb 20265,0655,05810,60610,41581$64.51$3.62
Jan 20266,2046,22511,71811,46097$60.04$7.72
Dec 20256,5836,59810,97010,694184$57.97$4.26
Nov 20256,7466,7369,1988,870194$60.06$3.79
Oct 20256,9366,9018,2717,957207$60.89$3.19
Sep 20253,8273,8585,0794,933100$63.96$2.97
Aug 20258,2498,19211,42310,91939$64.86$2.91
Jul 20257257688718324$68.39$3.20
Jun 20254,0374,0254,4154,29724$68.17$3.02
May 20254,0664,0594,0493,803112$62.17$3.12
Apr 20254,6714,6423,8313,64867$63.54$3.42
Mar 20255235784,0113,67393$68.24$4.12
Feb 20253,5843,5634,3043,854243$71.53$4.19
Jan 20253,0903,1303,0932,762210$75.74$4.13
Dec 20246,6286,5565,4535,2590$70.12$3.01
Nov 20241,2751,2925,8655,61432$69.95$2.12
Oct 20243,3633,3796,4596,117155$71.99$2.20
Sep 20245,6045,6296,6906,352126$70.24$2.28
Aug 20245,7095,7296,9416,65197$76.68$1.99
Jul 20247,6507,6327,5307,32842$81.80$2.07
Jun 20248,0688,00710,2859,332700$79.77$2.54
May 20241,0591,1299,1238,521302$80.02$2.12
Apr 20249,2589,2819,8759,089433$85.35$1.60
Mar 20248,6218,6098,9868,234291$81.28$1.49
Feb 202411,30111,2948,3508,19310$77.25$1.72
Jan 20248,5858,5815,9713,8831,887$74.15$3.18
Dec 202311,33011,3488,6478,36955$71.90$2.52
Nov 202310,48210,4418,6118,124313$77.69$2.71
Oct 202310,43510,4478,5697,2061,236$85.64$2.98
Sep 20236,8176,8214,8534,76241$89.43$2.64
Aug 20237,9457,9246,6326,44294$81.39$2.58

Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Hoefs T-K (Wolfcamp) field

All leases in this field →

Leases within 10 km

Drilling permits within 10 km