Skip to content
Royalty Clerk

Texas gas well

Producing

MOORE 1

Moore 1 is a gas well in Wheeler County, Texas, operated by Presidio Petroleum LLC in the Mills Ranch (Atoka Granite Wash) field.

1 well

36,733mcf gas, last 12 months−10% vs prior year
RRC lease
10-214900

Is your check right?

Check my statement

Where it sits

This county

Wheeler CountyWheelerGrayHemphillRobertsWheeler County
Wheeler County
Oil, last 12 months
79 bbl
Gas in Jul 2026
2,573 mcf

Checks stopped on this lease?

  • Buyer

    Buyer changed: PALO DURO PIPELNS (TX GATH) L.P. replaced APACHE CORPORATION as the buyer of this lease's gas from gas wells on Mar 25, 2026.

SourceRailroad Commission production, P-5 and P-4 records, data through Jul 2026.

See why checks stop on this lease

Production by month

Gas output fell 10% over the last 12 months

  • Gas (bars)
  • Oil (line)
  • Last 12 months
Gas output fell 10% over the last 12 monthsMonthly gas production and oil for MOORE 1, Aug 2023 to Jul 2026. Gas output fell 10% over the last 12 months. 36,733 mcf in the 12 months through Jul 2026, against 40,837 mcf in the 12 months before.Last 12 months: 36,733 mcfmcf per monthbbl per month001,00052,000103,000154,000205,00025Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Gas output fell 10% over the last 12 monthsMonthly gas production and oil for MOORE 1, Aug 2023 to Jul 2026. Gas output fell 10% over the last 12 months. 36,733 mcf in the 12 months through Jul 2026, against 40,837 mcf in the 12 months before.Last 12 monthsmcf per monthbbl per month001,00052,000103,000154,000205,00025Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

All of the gas went to a transmission line in the last 12 months

All of the gas went to a transmission line in the last 12 monthsShare of MOORE 1 gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a transmission line in the last 12 months.Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
All of the gas went to a transmission line in the last 12 monthsShare of MOORE 1 gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a transmission line in the last 12 months.Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

1 well on this lease

Wells on MOORE 1
API numberWell no.Status
42-483-31928201Active

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Energy Trans Crude Marketing LLCCondensateGathers90Mar 25, 2026–
Cp Energy, L.l.c.CondensateGathers10Mar 25, 2026–
Palo Duro Pipelns (Tx Gath) L.p.Gas-well gasBuys100Mar 25, 2026–
Palo Duro Pipelns (Tx Gath) L.p.Gas-well gasGathers100Mar 25, 2026–
Plains Marketing, L.p.CondensateGathers100Jan 1, 2018Mar 25, 2026
Midcoast Pl (Tx Gathering) L.p.Gas-well gasGathers100Nov 1, 2018Mar 25, 2026
Apache CorporationGas-well gasBuys100Jan 1, 2018Mar 25, 2026

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

640 acres on the newest permit

Permits for Moore 1
API numberWell no.Acreson the permit
42-483-31928201640

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for MOORE 1
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 2026802,5732,5730$80.46$2.89
Jun 20261502,2542,2540$84.81$3.15
May 2026402,4402,4400$102.13$2.94
Apr 20261602,7562,7560$100.32$2.77
Mar 2026002,5882,5880$91.38$3.04
Feb 2026903,4243,4240$64.51$3.62
Jan 2026904,1674,1670$60.04$7.72
Dec 20251104,1064,1060$57.97$4.26
Nov 2025403,7623,7620$60.06$3.79
Oct 2025003,1773,1770$60.89$3.19
Sep 2025102,7122,7120$63.96$2.97
Aug 2025202,7742,7740$64.86$2.91
Jul 20251702,7502,7500$68.39$3.20
Jun 20254612,7212,7210$68.17$3.02
May 20251303,0443,0440$62.17$3.12
Apr 2025803,4003,4000$63.54$3.42
Mar 20251203,8513,8510$68.24$4.12
Feb 20251003,8853,8850$71.53$4.19
Jan 20251004,9114,9110$75.74$4.13
Dec 20241304,5094,5090$70.12$3.01
Nov 2024003,4293,4290$69.95$2.12
Oct 2024202,8862,8860$71.99$2.20
Sep 20241302,7652,7650$70.24$2.28
Aug 202412592,6862,6860$76.68$1.99
Jul 2024002,7892,7890$81.80$2.07
Jun 2024502,7252,7250$79.77$2.54
May 202410712,8252,8250$80.02$2.12
Apr 20241203,2493,2490$85.35$1.60
Mar 20241704,4614,4610$81.28$1.49
Feb 202460000$77.25$1.72
Jan 2024504,9674,9670$74.15$3.18
Dec 2023204,9614,9610$71.90$2.52
Nov 2023004,5184,5180$77.69$2.71
Oct 2023004,1944,1940$85.64$2.98
Sep 2023803,3253,3250$89.43$2.64
Aug 2023803,1013,1010$81.39$2.58

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Presidio Petroleum LLC in Wheeler County

All Presidio Petroleum LLC leases →

Mills Ranch (Atoka Granite Wash) field

All leases in this field →

Leases within 10 km

Drilling permits within 10 km