Skip to content
Royalty Clerk

Texas oil lease

Producing

MOORE HOOPER A UNIT

Moore Hooper A Unit is an oil lease in Loving County, Texas, operated by Greenlake Energy Operating, LLC in the Phantom (Wolfcamp) field.

1 well

13,019bbl oil, last 12 months−19% vs prior year
RRC lease
08-46663

Is your check right?

Check my statement

Where it sits

This county

Loving CountyLovingWinklerWardLoving County
Loving County
Gas, last 12 months
21,253 mcf
Oil in Jul 2026
1,422 bbl

Production by month

Oil output fell 19% over the last 12 months

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output fell 19% over the last 12 monthsMonthly oil production and gas for MOORE HOOPER A UNIT, Aug 2023 to Jul 2026. Oil output fell 19% over the last 12 months. 13,019 bbl in the 12 months through Jul 2026, against 16,101 bbl in the 12 months before.Last 12 months: 13,019 bblbbl per monthmcf per month005002,0001,0004,0001,5006,0002,0008,0002,50010kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 19% over the last 12 monthsMonthly oil production and gas for MOORE HOOPER A UNIT, Aug 2023 to Jul 2026. Oil output fell 19% over the last 12 months. 13,019 bbl in the 12 months through Jul 2026, against 16,101 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month005002,0001,0004,0001,5006,0002,0008,0002,50010kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

90% of the gas went to a processing plant in the last 12 months

Flaring peaked at 60.2% of the gas in Jul 2026.

  • Processing plant (3)
  • Lease fuel (1)
  • Flared (4)
90% of the gas went to a processing plant in the last 12 monthsShare of MOORE HOOPER A UNIT gas by disposition code each month, Aug 2023 to Jul 2026. 90% of the gas went to a processing plant in the last 12 months. Flaring peaked at 60.2% of the gas in Jul 2026.Share of the lease’s gas by disposition code, per month0%50%100%Flared 60.2%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
90% of the gas went to a processing plant in the last 12 monthsShare of MOORE HOOPER A UNIT gas by disposition code each month, Aug 2023 to Jul 2026. 90% of the gas went to a processing plant in the last 12 months. Flaring peaked at 60.2% of the gas in Jul 2026.Share of gas by disposition code0%50%100%Flared 60.2%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Processing plant (3)

    90% · 22,253 mcf

  • Flared (4)

    5.9% · 1,452 mcf

  • Lease fuel (1)

    4.0% · 981 mcf

5.9% of the gas flared in the last 12 months. One month above 3%.

Who has run this lease

The operator changed once, most recently in May 2025

Operators of this lease over timeOXY USA Inc., Jan 2020 to Apr 2025; Greenlake Energy Operating, LLC, May 2025 to Jul 20262020202120222023202420252026Changed May 2025OXY USA Inc.Jan 2020 to Apr 2025Greenlake Energy Operating, L…May 2025 to now
Operators of this lease over timeOXY USA Inc., Jan 2020 to Apr 2025; Greenlake Energy Operating, LLC, May 2025 to Jul 20262020202120222023202420252026Changed May 2025OXY USA Inc.Jan 2020 to Apr 2025Greenlake Energy Operating, LLCMay 2025 to now

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

1 well on this lease

Wells on MOORE HOOPER A UNIT
API numberWell no.Status
42-301-324283HActive

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Indeca Crude Xpress, LLCOilGathers100May 1, 2025–
Et Gathering & Processing LLCCasinghead gasBuys100Mar 1, 2026–
Energy Transfer CompanyCasinghead gasGathers100May 24, 2015–
Etc Gas Processing, LLCCasinghead gasBuys100May 1, 2025Mar 1, 2026
Energy Transfer CompanyCasinghead gasBuys100May 24, 2015May 1, 2025
Bridger Transportation, LLCOilGathers100May 24, 2015May 1, 2025

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

320 acres on the newest permit

Permits for Moore Hooper A Unit
API numberWell no.Acreson the permit
42-301-324283H320

SourceRailroad Commission drilling permits, Sep 26, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for MOORE HOOPER A UNIT
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 2026Greenlake Energy1,4221,2912,3019161,385$80.46$2.89
Jun 2026Greenlake Energy1,3521,4562,2982,23167$84.81$3.15
May 2026Greenlake Energy1,6911,5672,7792,7790$102.13$2.94
Apr 2026Greenlake Energy1180000$100.32$2.77
Mar 2026Greenlake Energy1,0991,4861,4601,4600$91.38$3.04
Feb 2026Greenlake Energy1,5061,2511,3841,3840$64.51$3.62
Jan 2026Greenlake Energy1,4401,6281,3401,3400$60.04$7.72
Dec 2025Greenlake Energy1,7071,7134,0644,0640$57.97$4.26
Nov 2025Greenlake Energy2,0131,7053,8663,8660$60.06$3.79
Oct 2025Greenlake Energy7184791,5161,2540$60.89$3.19
Sep 2025Greenlake Energy94430200$63.96$2.97
Aug 2025Greenlake Energy612992151490$64.86$2.91
Jul 2025Greenlake Energy5004943,4332,7900$68.39$3.20
Jun 2025Greenlake Energy4757101,6321,0030$68.17$3.02
May 2025Greenlake Energy1,4491,2544,5813,7830$62.17$3.12
Apr 2025OXY USA1,8002,0894,3304,3300$63.54$3.42
Mar 2025OXY USA1,6231,3245,0735,0730$68.24$4.12
Feb 2025OXY USA1,6161,7084,4694,4690$71.53$4.19
Jan 2025OXY USA1,7031,9653,0533,0530$75.74$4.13
Dec 2024OXY USA1,1627862,4652,4650$70.12$3.01
Nov 2024OXY USA1,2621,2402,0932,0930$69.95$2.12
Oct 2024OXY USA1,5321,7782,8382,8380$71.99$2.20
Sep 2024OXY USA1,4481,1982,0732,0730$70.24$2.28
Aug 2024OXY USA1,5311,7111,7771,7770$76.68$1.99
Jul 2024OXY USA1,2521,1103,3603,3600$81.80$2.07
Jun 2024OXY USA1,2171,1882,6322,6320$79.77$2.54
May 2024OXY USA1,2751,3652,2472,2470$80.02$2.12
Apr 2024OXY USA1,4921,5111,9881,9880$85.35$1.60
Mar 2024OXY USA1,6881,8113,0883,0880$81.28$1.49
Feb 2024OXY USA1,5091,3772,2662,2660$77.25$1.72
Jan 2024OXY USA1,7231,7421,7471,7470$74.15$3.18
Dec 2023OXY USA1,5301,5242,4862,4860$71.90$2.52
Nov 2023OXY USA1,6091,7153,2203,2200$77.69$2.71
Oct 2023OXY USA1,6251,4763,5253,5250$85.64$2.98
Sep 2023OXY USA1,6721,7475,4875,4870$89.43$2.64
Aug 2023OXY USA1,4691,3724,5684,5680$81.39$2.58

Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Sep 28, 2026.

How to check your stub against this lease

Do your checks match this lease?

Nearby

Greenlake Energy Operating, LLC in Loving County

All Greenlake Energy Operating, LLC leases →

Phantom (Wolfcamp) field

All leases in this field →

Leases within 10 km

Drilling permits within 10 km

  • WHITE OAK 53-2 E #4553H

    new drill · horizontal · Pdeh LLC · Loving County · 7.5 km

    Permit 0918846 · Sep 25, 2026

  • WHITE OAK 53-2 I #4543H

    new drill · horizontal · Pdeh LLC · Loving County · 7.5 km

    Permit 0918849 · Sep 25, 2026

  • WHITE OAK 53-2 H #4542H

    new drill · horizontal · Pdeh LLC · Loving County · 7.5 km

    Permit 0918838 · Sep 24, 2026

  • WHITE OAK 53-2 J #4544H

    new drill · horizontal · Pdeh LLC · Loving County · 7.5 km

    Permit 0918844 · Sep 24, 2026

  • WHITE OAK 53-2 G #4541H

    new drill · horizontal · Pdeh LLC · Loving County · 7.5 km

    Permit 0918836 · Sep 24, 2026