Texas oil lease
ProducingNIMITZ 2
Nimitz 2 is an oil lease in Martin County, Texas, operated by Diamondback E&P LLC in the Spraberry (Trend Area) field.
1 well
- Operator
- Diamondback E&P LLC
- County
- Martin County
- RRC lease
- 08-53778
Is your family on this lease?
Where it sits
This county
- Gas, last 12 months
- 58,518 mcf
- Oil in Aug 2026
- 1,222 bbl
Did a relative own a share of this lease?
Pick the year they passed and see what the lease has sold since.
Checks stopped on this lease?
- Buyer
Buyer changed: ET GATHERING & PROCESSING LLC replaced ETC GAS PROCESSING, LLC as the buyer of this lease's gas from oil wells on Mar 1, 2026.
SourceRailroad Commission production, P-5 and P-4 records, data through Aug 2026.
See why checks stop on this leaseWells on this lease and around it
- This lease1Its well, ringed on the map: producing
- Drilling locations12Permits issued in the last two years
- Producing wells148On a lease reporting production now
- Not producing38Shut in, inactive or no lease on record
- Plugged29The state's wellbore record says plugged
The ringed dot is this lease's well, where the Railroad Commission's map puts it. The other dots are wells and drilling permits of the last 24 months on the land around it; the counts are for everything in the picture, which is about 6 miles across. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines, base map from USGS The National Map.
A one-page map of this lease to print, for a lawyer, a buyer or a probate file.
Use this map on your site
You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.
<a href="https://royaltyclerk.com/texas/leases/nimitz-2-08-53778"><img src="https://royaltyclerk.com/maps/lease-wells/nimitz-2-08-53778.svg" alt="Map of the Nimitz 2 lease in Martin County, Texas: its well ringed, among 215 wells and 12 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/nimitz-2-08-53778">Wells on the Nimitz 2 lease, Martin County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>Other Nimitz leases in Martin County
- Nimitz 12 · 08-56206, oil leaseProducing24,031 bbllast 12 reported months
- Nimitz 6 · 08-53303, oil leaseProducing20,706 bbllast 12 reported months
- Nimitz · 08-51648, oil leaseProducing14,772 bbllast 12 reported months
- Nimitz 11 · 08-56212, oil leaseProducing15,398 bbllast 12 reported months
- Nimitz 3 · 08-53299, oil leaseProducing12,089 bbllast 12 reported months
- Nimitz 8 · 08-53926, oil leaseProducing11,005 bbllast 12 reported months
- Nimitz 4 · 08-53767, oil leaseProducing9,207 bbllast 12 reported months
- Nimitz 7 · 08-54796, oil leaseProducing8,718 bbllast 12 reported months
Production by month
Oil output fell 28% over the last 12 months
- Oil (bars)
- Gas (line)
- Last 12 months
SourceTexas Railroad Commission Production Data Query, through Aug 2026.
From the state record
What owners ask about Nimitz 2
- When is the check for August 2026 due?
- August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Oct 30, 2026 and the gas by Nov 29, 2026, unless the lease sets another time.
- Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
- See your next three checks
- Which Texas production tax rate applies?
- The Texas Comptroller lists no approved exemption or reduced rate for this lease for August 2026, so the full 4.6% on oil and 7.5% on gas applies.
- Source: Texas Comptroller, approved severance tax exemptions.
- Check the tax on your stub
- Who buys the oil and gas?
- Oil: Enterprise Crude Pipeline LLC gathers it. Gas from oil wells: Et Gathering & Processing LLC buys it; Energy Transfer Company gathers it. The buyer's price is what a royalty check is figured on.
- Source: Railroad Commission Form P-4, gatherers and purchasers.
- See every buyer and past buyers
- How many 1099s should an owner expect for 2025?
- One company, Diamondback E&P LLC, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
- Source: Railroad Commission production reports, operator of record by month.
- Check your 1099 against it
Free tools, already on this lease
Ask a question about Nimitz 2
33 years of state records, 1993–2026
NIMITZ 2 since 2019
We read every monthly report the Railroad Commission holds, back to January 1993. This lease first reported in January 2019. It filed 92 monthly reports through August 2026.
Sold since 2019
$21 million
What the whole lease’s oil and gas sold for at each month’s public prices, before tax and the operator’s deductions. A royalty owner’s share is their decimal of it.
- Oil sold
- 315,113 bbl
- Gas sold
- 306,604 mcf
- Best year
- 2019$6.4 million sold
- Last report
- Aug 2026First: Jan 2019
Its best year was 2019: $6.4 million of oil and gas sold
Each bar is what the lease’s oil and gas sold for that year, at that month’s prices. 2026 is only part of a year in the records, drawn lighter.
- Oil
- Gas
SourceTexas Railroad Commission Production Data Query, every monthly report since January 1993; EIA monthly WTI and Henry Hub prices (before 1997, EIA's yearly Texas natural gas wellhead price), through August 2026.
Every year as a table
| Year | Months | Oil sold, bbl | Gas sold, mcf | Sold for |
|---|---|---|---|---|
| 2026 * | 8 | 8,595 | 38,431 | $817,320 |
| 2025 | 12 | 14,734 | 54,827 | $1,183,126 |
| 2024 | 12 | 23,885 | 66,321 | $1,991,113 |
| 2023 | 12 | 32,687 | 12,474 | $2,535,303 |
| 2022 | 12 | 32,623 | 12,818 | $3,004,445 |
| 2021 | 12 | 40,463 | 36,797 | $2,892,134 |
| 2020 | 12 | 54,565 | 32,833 | $2,204,950 |
| 2019 | 12 | 107,561 | 52,103 | $6,414,516 |
* Part of the year: the records run through August 2026.
Where the gas went
85% of the gas went to a transmission line in the last 12 months
Flaring peaked at 78.4% of the gas in Sep 2023.
- Transmission line (2)
- Lease fuel (1)
- Flared (4)
SourceTexas Railroad Commission Production Data Query, through Aug 2026.
Transmission line (2)
85% · 49,733 mcf
Lease fuel (1)
13% · 7,435 mcf
Flared (4)
2.3% · 1,350 mcf
2.3% of the gas flared in the last 12 months. 16 months above 3%.
Who has run this lease
The operator changed once, most recently in Mar 2023
- Diamondback E&P LLC Mar 2023 to now
- Lario Oil & Gas Company Jan 2020 to Feb 2023
SourceTexas Railroad Commission Production Data Query, through Aug 2026.
1 well on this lease
| API number | Well | Status | Completed | Total depthft |
|---|---|---|---|---|
| 42-317-40924 | Nimitz 2 402 | Active | Jan 31, 2019 | 8,955 |
SourceTexas Railroad Commission production records and full wellbore file.
Buyers and gatherers
| Company | Product | Role | Share% | From | Until |
|---|---|---|---|---|---|
| Enterprise Crude Pipeline LLC | Oil | Gathers | 100 | Aug 1, 2024 | – |
| Et Gathering & Processing LLC | Casinghead gas | Buys | 100 | Mar 1, 2026 | – |
| Energy Transfer Company | Casinghead gas | Gathers | 100 | Aug 1, 2024 | – |
| Etc Gas Processing, LLC | Casinghead gas | Buys | 100 | Aug 1, 2024 | Mar 1, 2026 |
| Wtg Gas Processing, L.p. | Casinghead gas | Gathers | 100 | Jan 31, 2019 | Aug 1, 2024 |
| Wtg Gas Processing, L.p. | Casinghead gas | Buys | 100 | Jan 31, 2019 | Aug 1, 2024 |
| Lion Oil Trading & Trans, LLC | Oil | Gathers | 50 | Jan 31, 2019 | Aug 1, 2024 |
| Nustar Permian Trans and Stg,llc | Oil | Gathers | 50 | Jan 31, 2019 | Aug 1, 2024 |
SourceRailroad Commission Form P-4 file, Oct 24, 2026 (source).
802.86 acres on the newest permit
- Worth asking
An allocation well is on this lease
A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.
- Worth asking
A Rule 37 case is listed
The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.
| API number | Well no. | Permit issued | Completed | Acreson the permit |
|---|---|---|---|---|
| 42-317-40924 | 402 | Aug 29, 2017 | Jan 31, 2019 | 802.86 |
What Diamondback Energy, Inc. told investors it received
| Quarter | Oil$ per bbl | Gas$ per mcf | Gas liquids$ per bbl | Filing |
|---|---|---|---|---|
| Q3 2026 | $87.30 | $1.12 | $20.02 | SEC filing |
| Q2 2026 | $96.82 | −$2.15 | $18.56 | SEC filing |
| Q1 2026 | $73.47 | $0.18 | $16.68 | SEC filing |
| Q4 2025 | $58.00 | $0.03 | $13.51 | SEC filing |
| Q3 2025 | $64.60 | $0.75 | $17.28 | SEC filing |
| Q2 2025 | $63.23 | $0.88 | $18.13 | SEC filing |
SourceDiamondback Energy, Inc. quarterly reports, SEC EDGAR, company-wide averages before hedging.
Estimate your royalty
36 months, newest first
| Month | Oil producedbbl | Oil soldbbl | Gas producedmcf | Gas soldmcf, codes 2+3 | Flaredmcf | WTI$/bbl | Henry Hub$/MMBtu |
|---|---|---|---|---|---|---|---|
| Aug 2026Diamondback E&P | 1,222 | 1,225 | 3,051 | 2,700 | 0 | $83.90 | $2.78 |
| Jul 2026Diamondback E&P | 1,080 | 1,098 | 5,773 | 5,098 | 11 | $80.46 | $2.89 |
| Jun 2026Diamondback E&P | 1,114 | 1,049 | 7,057 | 6,144 | 6 | $84.81 | $3.15 |
| May 2026Diamondback E&P | 216 | 224 | 1,322 | 1,135 | 10 | $102.13 | $2.94 |
| Apr 2026Diamondback E&P | 620 | 628 | 7,774 | 6,622 | 4 | $100.32 | $2.77 |
| Mar 2026Diamondback E&P | 1,342 | 1,350 | 7,601 | 6,093 | 668 | $91.38 | $3.04 |
| Feb 2026Diamondback E&P | 1,401 | 1,373 | 6,725 | 5,721 | 263 | $64.51 | $3.62 |
| Jan 2026Diamondback E&P | 1,650 | 1,648 | 6,043 | 4,918 | 295 | $60.04 | $7.72 |
| Dec 2025Diamondback E&P | 180 | 231 | 587 | 372 | 2 | $57.97 | $4.26 |
| Nov 2025Diamondback E&P | 1,659 | 1,605 | 6,107 | 5,205 | 72 | $60.06 | $3.79 |
| Oct 2025Diamondback E&P | 73 | 102 | 426 | 355 | 1 | $60.89 | $3.19 |
| Sep 2025Diamondback E&P | 1,777 | 1,774 | 6,052 | 5,370 | 18 | $63.96 | $2.97 |
| Aug 2025Diamondback E&P | 1,504 | 1,498 | 3,461 | 3,032 | 9 | $64.86 | $2.91 |
| Jul 2025Diamondback E&P | 1,547 | 1,551 | 5,724 | 5,009 | 24 | $68.39 | $3.20 |
| Jun 2025Diamondback E&P | 1,034 | 1,026 | 2,990 | 2,519 | 29 | $68.17 | $3.02 |
| May 2025Diamondback E&P | 1,361 | 1,366 | 8,473 | 7,510 | 3 | $62.17 | $3.12 |
| Apr 2025Diamondback E&P | 776 | 787 | 4,969 | 4,215 | 148 | $63.54 | $3.42 |
| Mar 2025Diamondback E&P | 1,044 | 1,059 | 5,544 | 4,804 | 88 | $68.24 | $4.12 |
| Feb 2025Diamondback E&P | 1,531 | 1,523 | 8,669 | 7,364 | 245 | $71.53 | $4.19 |
| Jan 2025Diamondback E&P | 2,239 | 2,212 | 10,270 | 9,072 | 230 | $75.74 | $4.13 |
| Dec 2024Diamondback E&P | 1,188 | 1,200 | 5,265 | 4,704 | 103 | $70.12 | $3.01 |
| Nov 2024Diamondback E&P | 1,972 | 1,973 | 10,677 | 9,205 | 638 | $69.95 | $2.12 |
| Oct 2024Diamondback E&P | 2,128 | 2,113 | 8,504 | 6,415 | 1,237 | $71.99 | $2.20 |
| Sep 2024Diamondback E&P | 709 | 718 | 2,408 | 1,941 | 162 | $70.24 | $2.28 |
| Aug 2024Diamondback E&P | 1,729 | 1,732 | 6,010 | 5,132 | 226 | $76.68 | $1.99 |
| Jul 2024Diamondback E&P | 2,299 | 2,293 | 6,785 | 5,884 | 197 | $81.80 | $2.07 |
| Jun 2024Diamondback E&P | 1,634 | 1,677 | 5,608 | 4,885 | 166 | $79.77 | $2.54 |
| May 2024Diamondback E&P | 2,682 | 2,657 | 12,670 | 9,570 | 1,854 | $80.02 | $2.12 |
| Apr 2024Diamondback E&P | 2,082 | 2,068 | 6,051 | 4,836 | 568 | $85.35 | $1.60 |
| Mar 2024Diamondback E&P | 2,707 | 2,709 | 5,891 | 4,363 | 967 | $81.28 | $1.49 |
| Feb 2024Diamondback E&P | 1,360 | 1,379 | 3,829 | 3,116 | 342 | $77.25 | $1.72 |
| Jan 2024Diamondback E&P | 3,349 | 3,366 | 9,840 | 6,270 | 2,849 | $74.15 | $3.18 |
| Dec 2023Diamondback E&P | 3,134 | 3,078 | 5,394 | 2,781 | 2,143 | $71.90 | $2.52 |
| Nov 2023Diamondback E&P | 467 | 478 | 103 | 52 | 41 | $77.69 | $2.71 |
| Oct 2023Diamondback E&P | 1,147 | 1,159 | 556 | 147 | 355 | $85.64 | $2.98 |
| Sep 2023Diamondback E&P | 1,605 | 1,603 | 2,495 | 281 | 1,955 | $89.43 | $2.64 |
Flared above 3%
SourceTexas Railroad Commission Production Data Query, through Aug 2026. Prices: EIA.
How to check your stub against this lease Checks stopped on this lease? See the likely reasonsNearby
This lease belongs to
Diamondback E&P LLC in Martin County
- RIDGWAY
13,912 bbl
- GUARDIAN 250 F
11,914 bbl
- UL 1125 E1
11,282 bbl
- CAMPBELL WEST SN 134-321 03
11,652 bbl
- PINOT 65
14,518 bbl
- JAGUAR EAST A
13,411 bbl
- DOOLITTLE 9
12,301 bbl
- HALL A14
8,468 bbl
- UL 0312 W10
8,309 bbl
- MABEE BREEDLOVE B
12,416 bbl
Spraberry (Trend Area) field
- ANGELINA SN 33-28 07
318,070 mcf
- CRAWFORD TANK FARM NE7Q
7,278 bbl
- HENDRIX A
14,429 bbl
- MCCLINTIC-BRUNSON 31B
8,333 bbl
- ARGENT BARKSDALE 29-17 E
7,813 bbl
- ROBINSON 12
10,103 bbl
- LOVING CLS 272-7
14,485 bbl
- CRAIG SN 29-20 E
6,106 bbl
- BEACH D
12,801 bbl
- BARBEE C 1-1 (ALLOC-A)
7,550 bbl
Leases within 10 km
- NIMITZ
14,772 bbl · 0 km
- NIMITZ 6
20,706 bbl · 0 km
- NIMITZ 7
8,718 bbl · 0 km
- NIMITZ 11
15,398 bbl · 0.4 km
- NIMITZ 12
24,031 bbl · 0.4 km
- COX "11A"
0 bbl · 0.4 km
- SLAUGHTER-HARRIS
0 bbl · 0.5 km
- SXSW E UNIT A
72,491 bbl · 0.7 km
- SXSW E UNIT B
87,532 bbl · 0.7 km
- SLAUGHTER 12
19,896 bbl · 0.8 km
Drilling permits within 10 km
HIGH NOON 8-20 H #1WD
new drill · horizontal · Diamondback E&P LLC · Martin County · 8.8 km
Permit 0919927 · Nov 5, 2026
HIGH NOON 8-20 G #2WD
new drill · horizontal · Diamondback E&P LLC · Martin County · 8.8 km
Permit 0919929 · Nov 5, 2026
BIG RED UNIT 75-82 #16H
new drill · horizontal · High Noon Resources, LLC · Martin County · 7.3 km
Permit 0919717 · Nov 2, 2026
BIG RED UNIT 75-82 #10H
new drill · horizontal · High Noon Resources, LLC · Martin County · 7.3 km
Permit 0919707 · Oct 30, 2026
BIG RED UNIT 75-82 #11H
new drill · horizontal · High Noon Resources, LLC · Martin County · 7.3 km
Permit 0919709 · Oct 30, 2026