Skip to content

Texas gas well · RRC district 03 · Lease 295596

Producing

PANZER 43

Panzer 43 is a gas well in Hardin County, Texas, operated by Cimarron Engineering, LLC in the Sour Lake (Yegua 10,000) field. The Railroad Commission shows 181,931 mcf of gas in the 12 months through Jul 2026.

Gas well dossier · 1 well

181,931mcf gas, last 12 months−42% vs prior year
RRC lease
03-295596

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Hardin CountyHardinOrangeJasperLibertyTylerNewtonPolkHardin County
Hardin County · RRC district 03Open Hardin County →
Oil, last 12 months
4,421 bbl
Gas in Jul 2026
6,216 mcf
Reporting to the state
since Apr 2023
Wells
1

Production

Month by month, from the state record

What the Railroad Commission says this gas well produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Gas output fell 42% over the last 12 months

181,931 mcf in the 12 months through Jul 2026, against 312,012 mcf in the 12 months before.

  • Gas (bars, left axis)
  • Oil (line, right axis)
  • Last 12 months
Gas output fell 42% over the last 12 monthsMonthly gas production and oil for PANZER 43, Aug 2023 to Jul 2026. Gas output fell 42% over the last 12 months. 181,931 mcf in the 12 months through Jul 2026, against 312,012 mcf in the 12 months before.Last 12 months: 181,931 mcfmcf per monthbbl per month0010k25020k50030k75040k1,00050k1,250Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Gas output fell 42% over the last 12 monthsMonthly gas production and oil for PANZER 43, Aug 2023 to Jul 2026. Gas output fell 42% over the last 12 months. 181,931 mcf in the 12 months through Jul 2026, against 312,012 mcf in the 12 months before.Last 12 monthsmcf per monthbbl per month0010k25020k50030k75040k1,00050k1,250Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas well 295596, district 03. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

All of the gas went to a transmission line in the last 12 months

Each bar is one month. Colors are the disposition codes the operator reported.

All of the gas went to a transmission line in the last 12 monthsShare of PANZER 43 gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a transmission line in the last 12 months. Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
All of the gas went to a transmission line in the last 12 monthsShare of PANZER 43 gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a transmission line in the last 12 months. Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 295596, district 03. Reported through Jul 2026.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

Cimarron Engineering, LLC has reported this lease for the whole period

No change of operator in the months we hold.

Operators of this lease over timeCimarron Engineering, LLC, Apr 2023 to Jul 2026202420252026Cimarron Engineering, LLCApr 2023 to nowthrough Jul 2026
Operators of this lease over timeCimarron Engineering, LLC, Apr 2023 to Jul 2026202420252026Cimarron Engineering, LLCApr 2023 to nowthrough Jul 2026

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to gas well 295596 in district 03. The API number is the state’s ID for a well.
Wells on PANZER 43
API numberWell no.Status
42-199-336501Active

SourceTexas Railroad Commission Wellbore Query, district 03, lease 295596.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says PANZER 43 sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Gas sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for PANZER 43
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Cimarron Engineering,1371726,2166,2160$80.46$2.89
Jun 2026Cimarron Engineering,1371766,9396,9390$84.81$3.15
May 2026Cimarron Engineering,1991848,2748,2740$102.13$2.94
Apr 2026Cimarron Engineering,2241858,5518,5510$100.32$2.77
Mar 2026Cimarron Engineering,27336412,01912,0190$91.38$3.04
Feb 2026Cimarron Engineering,33355614,46414,4640$64.51$3.62
Jan 2026Cimarron Engineering,37719018,10218,1020$60.04$7.72
Dec 2025Cimarron Engineering,41036916,45316,4530$57.97$4.26
Nov 2025Cimarron Engineering,44035117,72217,7220$60.06$3.79
Oct 2025Cimarron Engineering,50655320,43720,4370$60.89$3.19
Sep 2025Cimarron Engineering,62271024,37124,3710$63.96$2.97
Aug 2025Cimarron Engineering,76372528,38328,3830$64.86$2.91
Jul 2025Cimarron Engineering,1,1331,28338,51538,5150$68.39$3.20
Jun 2025Cimarron Engineering,97890832,02132,0210$68.17$3.02
May 2025Cimarron Engineering,1,0931,24334,10534,1050$62.17$3.12
Apr 2025Cimarron Engineering,77453921,43221,4320$63.54$3.42
Mar 2025Cimarron Engineering,32536811,78511,7850$68.24$4.12
Feb 2025Cimarron Engineering,55156318,88818,8880$71.53$4.19
Jan 2025Cimarron Engineering,75673326,25326,2530$75.74$4.13
Dec 2024Cimarron Engineering,78180425,24525,2450$70.12$3.01
Nov 2024Cimarron Engineering,97892824,98324,9830$69.95$2.12
Oct 2024Cimarron Engineering,65273726,33126,3310$71.99$2.20
Sep 2024Cimarron Engineering,84174125,12325,1230$70.24$2.28
Aug 2024Cimarron Engineering,96490927,33127,3310$76.68$1.99
Jul 2024Cimarron Engineering,1,0241,11129,52329,5230$81.80$2.07
Jun 2024Cimarron Engineering,9261,10828,32728,3270$79.77$2.54
May 2024Cimarron Engineering,58437015,72015,7200$80.02$2.12
Apr 2024Cimarron Engineering,2581797,4477,4470$85.35$1.60
Mar 2024Cimarron Engineering,38154211,00411,0040$81.28$1.49
Feb 2024Cimarron Engineering,68874820,44020,4400$77.25$1.72
Jan 2024Cimarron Engineering,85972924,27224,2720$74.15$3.18
Dec 2023Cimarron Engineering,86991725,20425,2040$71.90$2.52
Nov 2023Cimarron Engineering,92689926,08126,0810$77.69$2.71
Oct 2023Cimarron Engineering,94988524,94024,9400$85.64$2.98
Sep 2023Cimarron Engineering,8404,3304,3300$89.43$2.64
Aug 2023Cimarron Engineering,5604,6264,6260$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for PANZER 43. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Cimarron Engineering, LLC.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Cimarron Engineering, LLC in Hardin County

No other producing leases from this operator in this county are in our data yet.

Sour Lake (Yegua 10,000) field

No other producing leases in this field are in our data yet.

New drilling permits in Hardin County

We do not have coordinates for this lease, so these are the newest permits in its county.

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Gas sold” volume for the month the check covers and multiply it by your decimal. The answer should match the mcf on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, gas well 295596, district 03, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.