Skip to content

Texas oil lease · RRC district 08 · Lease 04073

Producing

PARKER, J. E.

Parker, J. E. is an oil lease in Andrews County, Texas, operated by Hilcorp Energy Company in the Martin (Ellenburger) field. The Railroad Commission shows 3,312 bbl of oil in the 12 months through Jul 2026.

Oil lease dossier · 2 wells

3,312bbl oil, last 12 months−34% vs prior year
RRC lease
08-04073

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Andrews CountyAndrewsMartinGainesDawsonAndrews County
Andrews County · RRC district 08Open Andrews County →
Gas, last 12 months
6,118 mcf
Oil in Jul 2026
452 bbl
Reporting to the state
since Jan 2020
Wells
2

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Oil output fell 34% over the last 12 months

3,312 bbl in the 12 months through Jul 2026, against 5,047 bbl in the 12 months before.

  • Oil (bars, left axis)
  • Gas (line, right axis)
  • Last 12 months
Oil output fell 34% over the last 12 monthsMonthly oil production and gas for PARKER, J. E., Aug 2023 to Jul 2026. Oil output fell 34% over the last 12 months. 3,312 bbl in the 12 months through Jul 2026, against 5,047 bbl in the 12 months before.Last 12 months: 3,312 bblbbl per monthmcf per month002505005001,0007501,5001,0002,0001,2502,500Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 34% over the last 12 monthsMonthly oil production and gas for PARKER, J. E., Aug 2023 to Jul 2026. Oil output fell 34% over the last 12 months. 3,312 bbl in the 12 months through Jul 2026, against 5,047 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month002505005001,0007501,5001,0002,0001,2502,500Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, oil lease 04073, district 08. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

Since Jun 2025 the lease's gas goes to a transmission line instead of a processing plant

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not. Flaring peaked at 18.7% of the gas in Aug 2025.

  • Processing plant (3)
  • Transmission line (2)
  • Flared (4)
Since Jun 2025 the lease's gas goes to a transmission line instead of a processing plantShare of PARKER, J. E. gas by disposition code each month, Aug 2023 to Jul 2026. Since Jun 2025 the lease's gas goes to a transmission line instead of a processing plant. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not. Flaring peaked at 18.7% of the gas in Aug 2025.Share of the lease’s gas by disposition code, per month0%50%100%Jun 2025: plant to lineFlared 18.7%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Jun 2025 the lease's gas goes to a transmission line instead of a processing plantShare of PARKER, J. E. gas by disposition code each month, Aug 2023 to Jul 2026. Since Jun 2025 the lease's gas goes to a transmission line instead of a processing plant. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not. Flaring peaked at 18.7% of the gas in Aug 2025.Share of gas by disposition code0%50%100%Jun 25: plant to lineFlared 18.7%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 04073, district 08. Reported through Jul 2026.

Processing plant (3)

Sent to a gas plant that pulls out natural gas liquids. Your statement should show plant products, and may show processing fees.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

Flared (4)

Burned off or vented, not sold. It pays no royalty. More than 3% in a month is worth watching.

Over the last 12 months, 6.0% of the gas was flared. 14 months went above 3%, which we mark in the ledger below.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed once, most recently in Apr 2025

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeXTO Energy Inc., Jan 2020 to Mar 2025; Hilcorp Energy Company, Apr 2025 to Jul 20262020202120222023202420252026Changed Apr 2025XTO Energy Inc.Jan 2020 to Mar 2025Hilcorp Energy CompanyApr 2025 to now
Operators of this lease over timeXTO Energy Inc., Jan 2020 to Mar 2025; Hilcorp Energy Company, Apr 2025 to Jul 20262020202120222023202420252026Changed Apr 2025XTO Energy Inc.Jan 2020 to Mar 2025Hilcorp Energy CompanyApr 2025 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

2 wells on this lease

Every well the Railroad Commission links to oil lease 04073 in district 08. The API number is the state’s ID for a well.
Wells on PARKER, J. E.
API numberWell no.Status
42-003-0298810DActive
42-003-0298911Active

SourceTexas Railroad Commission Wellbore Query, district 08, lease 04073.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Oil

    Sentinel Transportation, LLC gathers it.

    100% of it, on the list since Apr 1, 2025

  • Gas from oil wells

    James Lake Midstream LLC buys and gathers it.

    James Lake Midstream LLC buys it: 100% of it, on the list since Feb 1, 2022 · James Lake Midstream LLC gathers it: 100% of it, on the list since Feb 1, 2022

Companies that used to be listed: Sentinel Transportation, LLC (gathers it, until Apr 1, 2025); West Texas Crude Transport, LLC (gathers it, until Apr 1, 2025); Sentinel Transportation, LLC (gathers it, until Apr 1, 2022); Continuum Crude Log Svcs, L.l.c. (gathers it, until Feb 1, 2022).

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

6,143.80 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
139 not plugged
Horizontal
0
First completion
Aug 6, 1947
Latest permit
Nov 1, 1999

The wells on this lease state different acreage

The permits state between 240 and 6,903.8 acres. Use the acres from your own division order for the well you are paid on.

13 wells are listed on this lease

Each well can have its own unit. The decimal for one well does not have to equal the decimal for another.

Wells and acres on the permits for Parker, J. E.
API numberWell no.Acreson the permit
42-003-03002246,143.80
42-003-02995176,903.80
42-003-02992146,903.80
42-003-0298246,903.80
42-003-03009326,889
42-003-029835240
42-003-029846240
42-003-0298810D6,889
42-003-029868–
42-003-0298911–
42-003-0299416–
42-003-0299618–

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says PARKER, J. E. sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for PARKER, J. E.
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Hilcorp Energy4527561760512$80.46$2.89
Jun 2026Hilcorp Energy032000$84.81$3.15
May 2026Hilcorp Energy011000$102.13$2.94
Apr 2026Hilcorp Energy029000$100.32$2.77
Mar 2026Hilcorp Energy00000$91.38$3.04
Feb 2026Hilcorp Energy038000$64.51$3.62
Jan 2026Hilcorp Energy0588000$60.04$7.72
Dec 2025Hilcorp Energy8213114011921$57.97$4.26
Nov 2025Hilcorp Energy66051587081852$60.06$3.79
Oct 2025Hilcorp Energy7054961,4331,321112$60.89$3.19
Sep 2025Hilcorp Energy6378781,3901,33357$63.96$2.97
Aug 2025Hilcorp Energy7765231,6681,356312$64.86$2.91
Jul 2025Hilcorp Energy52952578769493$68.39$3.20
Jun 2025Hilcorp Energy1,0465241,7521,7520$68.17$3.02
May 2025Hilcorp Energy0122000$62.17$3.12
Apr 2025Hilcorp Energy0234000$63.54$3.42
Mar 2025XTO Energy003833830$68.24$4.12
Feb 2025XTO Energy4944514874870$71.53$4.19
Jan 2025XTO Energy4745317467460$75.74$4.13
Dec 2024XTO Energy6234956256250$70.12$3.01
Nov 2024XTO Energy51951870667234$69.95$2.12
Oct 2024XTO Energy7465927557505$71.99$2.20
Sep 2024XTO Energy30934444541332$70.24$2.28
Aug 2024XTO Energy30730051146645$76.68$1.99
Jul 2024XTO Energy35250646242834$81.80$2.07
Jun 2024XTO Energy3693215225220$79.77$2.54
May 2024XTO Energy5655496926875$80.02$2.12
Apr 2024XTO Energy64864953748651$85.35$1.60
Mar 2024XTO Energy78365469662769$81.28$1.49
Feb 2024XTO Energy4756225605600$77.25$1.72
Jan 2024XTO Energy59061774473410$74.15$3.18
Dec 2023XTO Energy64060561259814$71.90$2.52
Nov 2023XTO Energy71769899392370$77.69$2.71
Oct 2023XTO Energy9799729189180$85.64$2.98
Sep 2023XTO Energy59752550649016$89.43$2.64
Aug 2023XTO Energy7006257487480$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for PARKER, J. E.. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Hilcorp Energy Company.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Hilcorp Energy Company in Andrews County

All Hilcorp Energy Company leases →

Martin (Ellenburger) field

No other producing leases in this field are in our data yet.

Leases within 10 km

Found by the location of their wells.

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 04073, district 08, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.