Texas oil leaseRRC 04-14246Last oil or gas reported Aug 2025
Parr Sunray
One well on 40 acres in Duval County. No oil or gas reported in the last 12 months, through September 2026. Reports are on file for all 12 months, with no oil and no gas.
- Last operator
- Cerberus Engineering, LLC
- County
- Duval
- On record since
- June 2024
- Newest report on file
- September 2026
- Unit on the newest permit
- 40 acres
Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.
What the checks found on this lease
- Reports stopped. This lease no longer reports to the State. The part below says since when, and what to ask.
- 13 silent months. September 2025 to September 2026.
Checked, nothing found: operator changes, buyers, heat from space and new wells.
Not on file here, or only in part: drops and price and tax.
Royalty Watch tells you the month any of this changes on your own lease: a silent month, a drop, a new buyer or a well's next stage.Watch this lease
No oil or gas reported in the 12 months through September 2026
Oil or gas was last reported for August 2025
Its whole life in the Railroad Commission's monthly reports, which start in January 1993; it first reported in October 2023. Royalty owners and their heirs can still be on the county roll after the checks stop.
- October 2023First report
- 2024The year it sold the most
- Cerberus Engineering, LLCLast operator, from October 2023
- August 2025Last production
- 13 monthsNo oil or gas reported, September 2025 to September 2026
barrels of oil sold since October 2023.
what it all sold for at each month's public prices, 100% of the lease.
SourceRailroad Commission production reports since January 1993 (oil and gas sold); EIA prices, through September 2026.
The story, from 28 monthly reports
2024 to 2026: it sold the most in 2024
June 2024: the first month the lease sold oil on record, 153 barrels.
2024: the year the lease sold the most, $28,600 of oil and gas at public prices.
September 2026 is the newest monthly production report on file.
SourceRailroad Commission production reports, June 2024 through September 2026. Not a forecast, not reserves.
Checks stopped on this lease?
The current operator's P-5 registration is listed as delinquent (last P-5 filed Sep 3, 2026).
SourceRailroad Commission production, P-5 and P-4 records, data through September 2026.See why checks stop on this lease
28 months against 7 other recordsNew
Every month since June 2024, and what else happened that month
The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.
Oil averaged $97.31 a barrel · Cerberus Engineering, LLC
- Nothing else on record this month.
Move the pointer or drag across the chart.
Monthly oil sold from this lease since June 2024, with seven record tracks beneath it. Use the left and right arrow keys to move month by month.. 28 months from June 2024 to September 2026. The most in one month: 166 barrels, September 2024. The newest month: 0 barrels. 23 months with nothing reported.
No numbered drop comparison is on file here.
SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through September 2026.
30 months, one line eachNew
No production was reported from September 2025 through September 2026
A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.
months in a row with nothing reported, from September 2025 through September 2026. Reports are on file for all 13 months, with no oil and no gas.
barrels of oil on the newest report on file with oil or gas, for August 2025. The 13 reports on file after it, the newest for September 2026, show no oil and no gas.
of 30 months with oil or gas reported since April 2024.
A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.
SourceRailroad Commission production reports, April 2024 through September 2026. The months after June 2026 are counted from this lease's own reports filed since.
3 years of state records, 2024 to 2026
Sold since June 2024
$41,100
Sales at public prices before tax and deductions. Multiply by your decimal interest to estimate your share.
- Oil sold
- 551barrels
- Best year
- 2024$28,600 sold
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 2024 | $28,600 | $0 | $28,600, sold the most |
| 2025 | $12,400 | $0 | $12,400 |
| 2026, 2026 so far | $0 | $0 | $0 |
Did a relative own a share of this lease?
SourcesRailroad Commission Production Data Query, every monthly report since June 2024. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.
The newest well, seen from the side
No well on the way. Well 1 was completed in August 2003.
- Permit filedNot on file
- Drilling startedNot on file
- FrackedNot on file
- Completion filedAugust 6, 2003
- First production on the leaseNot on file
- First checkNot on file
SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 27, 2026.
About 6 miles across
Wells on this lease and around it
For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.
From the State's well records
One well on this lease
| Well | API number | Completed | Depthfeet | Today |
|---|---|---|---|---|
| 1 | 42-131-38629 | August 2003 | 7,956 | Not plugged |
SourceRailroad Commission wellbore and completion records.
The Railroad Commission files the same API numbers under one more lease too: a well keeps its number when it moves into a unit or is recompleted under another lease. A deed older than the unit may name one of them.
Parr Sunray (Duval County, 1 shared well)
What the drilling permits say
40acres on the newest permit
- 40 acres, on the 2023 permits
A Rule 37 case is listed The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.
Oil · last sale month, August 2025 New
Four prices for the same oil
Last sale August 2025. WTI $64.86 in August 2025, the last sale month.
Texas Comptroller
Lower tax on record?
No lower tax approval appears on the Comptroller’s list for this lease.
EIA record dated October 1, 2026Estimate your royalty
Type the decimal from your division order
The starting decimal is an example. Nothing you type here leaves this page.
$0a month
At these prices the whole lease’s reported sales were about $0 over 12 reported months. Your estimated share is $0 before taxes and deductions.
Monthly owner volumes and values
| Month | Oil (bbl) | Oil value | Gas (mcf) | Gas value | Total |
|---|---|---|---|---|---|
| September 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| August 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| July 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| June 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| May 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| April 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| March 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| February 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| January 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| December 2025 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| November 2025 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| October 2025 | 0 | $0.00 | 0 | $0.00 | $0.00 |
SourcesRailroad Commission monthly production, EIA WTI, SEC filings and Texas Comptroller records.
Watch Plus sets public prices beside the price on your statement.See Watch Plus
Who takes the oil and gasNew
No buyer shares an owner with the operator
The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.
No shared owner, officer or address on record between the oil buyers and the operator.
Also on the P-4: GULFMARK ENERGY, INC. gathers 50%.
Who buys my oilOil price check
SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.
Seen from space, 2025New
No satellite heat at this pad in 2025
Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.
A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.
nights with heat recorded at this pad, 2025.
months in which flaring was reported.
months with heat seen and no flaring reported.
SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 26, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.
Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus
The county appraisal roll
Roll not on file
County mineral roll
Roll not on file
Duval Appraisal District’s mineral roll has not been read here yet.
Royalty Clerk has mineral rolls for 166 Texas counties.
Source County appraisal district mineral rolls.
From the state record
Ask a question about Parr Sunray
The available public records have no additional lease-specific answers as of November 27, 2026.
Every monthly report the State holds
28 months, newest first
| Month | Oil soldbarrels | Sold forat public prices |
|---|---|---|
| SeptemberSep 2026 | No oil or gas reported | |
| AugustAug 2026 | No oil or gas reported | |
| JulyJul 2026 | No oil or gas reported | |
| JuneJun 2026 | No oil or gas reported | |
| MayMay 2026 | No oil or gas reported | |
| AprilApr 2026 | No oil or gas reported | |
| MarchMar 2026 | No oil or gas reported | |
| FebruaryFeb 2026 | No oil or gas reported | |
| JanuaryJan 2026 | No oil or gas reported | |
| DecemberDec 2025 | No oil or gas reported | |
| NovemberNov 2025 | No oil or gas reported | |
| OctoberOct 2025 | No oil or gas reported | |
| SeptemberSep 2025 | No oil or gas reported | |
| AugustAug 2025 | 67 | $4,350 |
| JulyJul 2025 | No oil or gas reported | |
| JuneJun 2025 | No oil or gas reported | |
| MayMay 2025 | No oil or gas reported | |
| AprilApr 2025 | No oil or gas reported | |
SourcesTexas Railroad Commission Production Data Query, through September 2026. Prices: EIA.
Example
A whole month was never paid
The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.
Ask Operator B's owner relations: is that month held in suspense after the change of operator?
$2,277oil and gas
A sample finding, from our example check.
Around this lease
Nearby
Cerberus Engineering, LLC in Duval County
- Kibbe-Moos, Anna -B-1,806 bbl last 12 months
Jaboncillos (Avery 5550) field
- Kibbe-Moos, Anna -A-2,435 bbl last 12 months
- Kibbe-Moos, Anna -B-1,806 bbl last 12 months
Leases within 10 km
- Morgan-Sunrayno production in the last 12 months · 0 km
- Kibbe-Moos, Anna -A-no production in the last 12 months · 0.3 km
- Kibbe-Moos, Anna -S-no production in the last 12 months · 0.4 km
- Kibbe-Moos, Anna -A-2,435 bbl last 12 months · 0.4 km
- Parr Kibbeno production in the last 12 months · 0.4 km
- Kibbe-Moos, Anna -B-1,806 bbl last 12 months · 0.5 km
- Parr Kibbe Molinano production in the last 12 months · 0.7 km
- Kibbe-Moos, Annano production in the last 12 months · 0.9 km
- Vela, Lazardno production in the last 12 months · 1.8 km
- De Barrera, Josefa S.4 bbl last 12 months · 2.2 km
Drilling permits within 10 km
- SOUTHARD #1new drill · Hurd Enterprises, Ltd. · Oct 20, 2026 · 0.8 km
- PARR A #2new drill · Bridwell Oil Co. · Jul 1, 2024 · 9.3 km
- PARR SUNRAY #1recompletion · Cerberus Engineering, LLC · Jun 30, 2023 · 0 km
Same name in district 04
- Parr Sunrayno production in the last 12 months
- Parr Sunrayno production in the last 12 months
Where it sits
This county
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells
- U.S. Energy Information Administration prices
- NOAA storms and cold
- NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
- U.S. Geological Survey photos
How this page is made
Our software builds this page from the public records above. Every figure on it is computed from them, and the page is rebuilt when a source publishes a new month or a new roll. Where the page has a written summary, our software writes it from the page's own figures, and it is checked against them before it goes up. Royalty Clerk is run by AGI Solutions LLC; no operator pays for a page or sees one first.