Skip to content

Texas oil lease · RRC district 08 · Lease 48099

Producing

PHOENIX UNIT

Phoenix Unit is an oil lease in Reeves County, Texas, operated by Scout Energy Management LLC in the Hoefs T-K (Wolfcamp) field. The Railroad Commission shows 14,985 bbl of oil in the 12 months through Jul 2026.

Oil lease dossier · 1 well

14,985bbl oil, last 12 months−23% vs prior year
RRC lease
08-48099

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Reeves CountyReevesWinklerWardLovingReeves County
Reeves County · RRC district 08Open Reeves County →
Gas, last 12 months
139,341 mcf
Oil in Jul 2026
1,013 bbl
Reporting to the state
since Jan 2020
Wells
1

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Oil output fell 23% over the last 12 months

14,985 bbl in the 12 months through Jul 2026, against 19,383 bbl in the 12 months before.

  • Oil (bars, left axis)
  • Gas (line, right axis)
  • Last 12 months
Oil output fell 23% over the last 12 monthsMonthly oil production and gas for PHOENIX UNIT, Aug 2023 to Jul 2026. Oil output fell 23% over the last 12 months. 14,985 bbl in the 12 months through Jul 2026, against 19,383 bbl in the 12 months before.Last 12 months: 14,985 bblbbl per monthmcf per month005005,0001,00010k1,50015k2,00020k2,50025kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 23% over the last 12 monthsMonthly oil production and gas for PHOENIX UNIT, Aug 2023 to Jul 2026. Oil output fell 23% over the last 12 months. 14,985 bbl in the 12 months through Jul 2026, against 19,383 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month005005,0001,00010k1,50015k2,00020k2,50025kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, oil lease 48099, district 08. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

97% of the gas went to a transmission line in the last 12 months

Flaring peaked at 100.0% of the gas in May 2025.

  • Processing plant (3)
  • Transmission line (2)
  • Lease fuel (1)
  • Flared (4)
97% of the gas went to a transmission line in the last 12 monthsShare of PHOENIX UNIT gas by disposition code each month, Aug 2023 to Jul 2026. 97% of the gas went to a transmission line in the last 12 months. Flaring peaked at 100.0% of the gas in May 2025.Share of the lease’s gas by disposition code, per month0%50%100%Flared 100.0%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
97% of the gas went to a transmission line in the last 12 monthsShare of PHOENIX UNIT gas by disposition code each month, Aug 2023 to Jul 2026. 97% of the gas went to a transmission line in the last 12 months. Flaring peaked at 100.0% of the gas in May 2025.Share of gas by disposition code0%50%100%Flared 100.0%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 48099, district 08. Reported through Jul 2026.

Processing plant (3)

Sent to a gas plant that pulls out natural gas liquids. Your statement should show plant products, and may show processing fees.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

Lease fuel (1)

Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.

Flared (4)

Burned off or vented, not sold. It pays no royalty. More than 3% in a month is worth watching.

Over the last 12 months, 2.6% of the gas was flared. 9 months went above 3%, which we mark in the ledger below.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed once, most recently in Mar 2025

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeCog Operating LLC, Jan 2020 to Feb 2025; Scout Energy Management LLC, Mar 2025 to Jul 20262020202120222023202420252026Changed Mar 2025Cog Operating LLCJan 2020 to Feb 2025Scout Energy Management LLCMar 2025 to now
Operators of this lease over timeCog Operating LLC, Jan 2020 to Feb 2025; Scout Energy Management LLC, Mar 2025 to Jul 20262020202120222023202420252026Changed Mar 2025Cog Operating LLCJan 2020 to Feb 2025Scout Energy Management LLCMar 2025 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to oil lease 48099 in district 08. The API number is the state’s ID for a well.
Wells on PHOENIX UNIT
API numberWell no.Status
42-389-351857601HActive

SourceTexas Railroad Commission Wellbore Query, district 08, lease 48099.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Oil

    Etp Crude LLC gathers it.

    100% of it, on the list since Jul 24, 2016

  • Gas from oil wells

    Energy Transfer Company buys and gathers it.

    Energy Transfer Company buys it: 100% of it, on the list since Jul 24, 2016 · Energy Transfer Company gathers it: 100% of it, on the list since Jul 24, 2016

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

11,058.78 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
1
First completion
Jul 24, 2016
Latest permit
Apr 13, 2016

A production sharing agreement well is on this lease

A production sharing agreement divides production by a method the agreement sets. Ask the operator for the agreement and the tract percentage it gives your land.

Wells and acres on the permits for Phoenix Unit
API numberWell no.Acreson the permit
42-389-351857601H11,058.78

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says PHOENIX UNIT sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for PHOENIX UNIT
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Scout Energy1,01397513,03713,0370$80.46$2.89
Jun 2026Scout Energy1,1171,11413,74213,276466$84.81$3.15
May 2026Scout Energy1,1201,15313,41313,4130$102.13$2.94
Apr 2026Scout Energy1,3201,32612,73611,7001,036$100.32$2.77
Mar 2026Scout Energy1,3081,31711,36211,3620$91.38$3.04
Feb 2026Scout Energy1,2841,26910,0839,945138$64.51$3.62
Jan 2026Scout Energy1,3191,2809,5628,697865$60.04$7.72
Dec 2025Scout Energy1,1471,14211,92711,9270$57.97$4.26
Nov 2025Scout Energy1,2831,28211,99611,9960$60.06$3.79
Oct 2025Scout Energy1,2841,3449,9108,7511,159$60.89$3.19
Sep 2025Scout Energy1,3241,32510,81710,8170$63.96$2.97
Aug 2025Scout Energy1,4661,46010,75610,7560$64.86$2.91
Jul 2025Scout Energy1,4391,4119,7519,7510$68.39$3.20
Jun 2025Scout Energy1,2021,2088,0558,0550$68.17$3.02
May 2025Scout Energy1,3121,18943043$62.17$3.12
Apr 2025Scout Energy1,3751,4391,66101,620$63.54$3.42
Mar 2025Scout Energy1,2781,3191,0690962$68.24$4.12
Feb 2025Cog Operating1,5401,5709,2049,2040$71.53$4.19
Jan 2025Cog Operating1,6261,6229,8889,8880$75.74$4.13
Dec 2024Cog Operating1,8721,86010,52710,5270$70.12$3.01
Nov 2024Cog Operating1,9182,01411,39311,3930$69.95$2.12
Oct 2024Cog Operating2,0331,99613,18213,1820$71.99$2.20
Sep 2024Cog Operating1,6551,6239,7519,7510$70.24$2.28
Aug 2024Cog Operating2,1332,14511,18011,1800$76.68$1.99
Jul 2024Cog Operating1,9271,9729,5829,5820$81.80$2.07
Jun 2024Cog Operating1,8861,7528,9578,9570$79.77$2.54
May 2024Cog Operating1,084991000$80.02$2.12
Apr 2024Cog Operating063000$85.35$1.60
Mar 2024Cog Operating9159867,6637,6630$81.28$1.49
Feb 2024Cog Operating1,5441,59112,05812,0580$77.25$1.72
Jan 2024Cog Operating1,8471,86912,07511,325750$74.15$3.18
Dec 2023Cog Operating2,2112,12712,29711,814483$71.90$2.52
Nov 2023Cog Operating1,7901,83212,17512,1750$77.69$2.71
Oct 2023Cog Operating1,8011,76013,23313,2330$85.64$2.98
Sep 2023Cog Operating1,8811,92914,35314,3530$89.43$2.64
Aug 2023Cog Operating2,0602,06413,89313,81479$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for PHOENIX UNIT. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Scout Energy Management LLC.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Scout Energy Management LLC in Reeves County

All Scout Energy Management LLC leases →

Hoefs T-K (Wolfcamp) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 48099, district 08, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.