Texas oil leaseRRC 09-00553Producing
Prideaux -C-
Three wells in Archer County. The lease produced 237 barrels of oil in the last 12 months, through August 2026.
- Operator
- DM Backhoe Service
- County
- Archer
- On record since
- February 1993
- Newest report on file
- August 2026
- Wells
- 3
Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.
The story, from 403 monthly reports
On record since February 1993
February 1993: the first month the lease sold oil on record, 181 barrels.
October 2005 to February 2006: five months in a row with no oil and no gas reported.
July 2017: White Knight Production LLC took over.
February 2020: T & R Operating, LLC took over from White Knight Production LLC.
March 2024: DM Backhoe Service took over from T & R Operating, LLC.
August 2026 is the newest monthly production report on file.
SourceRailroad Commission production reports, February 1993 through August 2026. Not a forecast, not reserves.
403 months against 7 other recordsNew
Every month since February 1993, and what else happened that month
The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.
Oil averaged $83.90 a barrel · DM Backhoe Service
- Nothing else on record this month.
Move the pointer or drag across the chart.
Monthly oil sold from this lease since February 1993, with seven record tracks beneath it. Use the left and right arrow keys to move month by month.. 403 months from February 1993 to August 2026. The most in one month: 315 barrels, June 1999. The newest month: 0 barrels. 214 months with nothing reported.
No month fell far below the three months before it.
SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through August 2026.
Royalty Watch tells you the month a drop starts, with the records from that month.Watch this lease
401 months, one line eachNew
Five months of silence from 2005 to 2006
A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.
months in a row with nothing reported, October 2005 to February 2006. Reports are on file for all 5 months, with no oil and no gas. The longest silence on record here.
barrels of oil on the newest report on file with oil or gas, for August 2026, the State's newest month.
of 401 months with oil or gas reported since January 1993.
barrels of oil a day on average from September 2025 through August 2026, counting a month with no report on file as zero.
A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.
SourceRailroad Commission production reports, January 1993 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.
Royalty Watch tells you when a silent month starts, and drafts the letter asking whether the lease is still in force.Watch this lease
34 years of state records, 1993 to 2026
Sold since February 1993
$1.08million
Only filed sales with a published price are included. Some sales figures or prices are unavailable.
- Oil sold
- 24,209barrels
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 1993 | $28,600 | $0 | $28,600 |
| 1994 | $19,300 | $0 | $19,300 |
| 1995 | $19,700 | Unavailable | $19,700 in priced filings |
| 1996 | $24,800 | Unavailable | $24,800 in priced filings |
| 1997 | $19,100 | Unavailable | $19,100 in priced filings |
| 1998 | $19,900 | Unavailable | $19,900 in priced filings |
| 1999 | $32,700 | Unavailable | $32,700 in priced filings |
| 2000 | $44,200 | Unavailable | $44,200 in priced filings |
| 2001 | $44,700 | Unavailable | $44,700 in priced filings |
| 2002 | $25,100 | Unavailable | $25,100 in priced filings |
| 2003 | $0 | $0 | $0 |
| 2004 | $0 | $0 | $0 |
| 2005 | $0 | Unavailable | Unavailable |
| 2006 | $0 | Unavailable | Unavailable |
| 2007 | $0 | $0 | $0 |
| 2008 | $46,000 | $0 | $46,000 |
| 2009 | $53,900 | Unavailable | $53,900 in priced filings |
| 2010 | $57,100 | Unavailable | $57,100 in priced filings |
| 2011 | $64,900 | Unavailable | $64,900 in priced filings |
| 2012 | $80,100 | Unavailable | $80,100 in priced filings |
| 2013 | $84,300 | Unavailable | $84,300 in priced filings |
| 2014 | $62,900 | Unavailable | $62,900 in priced filings |
| 2015 | $32,800 | Unavailable | $32,800 in priced filings |
| 2016 | $31,600 | Unavailable | $31,600 in priced filings |
| 2017 | $30,400 | Unavailable | $30,400 in priced filings |
| 2018 | $46,200 | Unavailable | $46,200 in priced filings |
| 2019 | $42,600 | Unavailable | $42,600 in priced filings |
| 2020 | $25,100 | $0 | $25,100 |
| 2021 | $40,300 | $0 | $40,300 |
| 2022 | $10,600 | $0 | $10,600 |
| 2023 | $23,100 | $0 | $23,100 |
| 2024 | $34,700 | $0 | $34,700 |
| 2025 | $23,100 | $0 | $23,100 |
| 2026, 2026 so far | $13,700 | $0 | $13,700 |
Did a relative own a share of this lease?
SourcesRailroad Commission Production Data Query, every monthly report since February 1993. EIA monthly WTI and Henry Hub prices (before 1997, EIA's Texas wellhead gas price). 2026 is part of a year, drawn lighter. Not a forecast, not reserves.
Who has run this lease
The operator changed six times, most recently in March 2024
The company named on each monthly report to the State. The operator is not always the company that pays.
- DM Backhoe ServiceMarch 2024 to now
- T & R Operating, LLCFebruary 2020 to February 2024
- White Knight Production LLCJuly 2017 to January 2020
- Operator number 875374May 2015 to June 2017
- Beisch, RustyOctober 2002 to April 2015
- Wortham Operating, LLCJanuary 1999 to September 2002
- Operator number 942500February 1993 to December 1998
SourcesRailroad Commission production reports, the operator on each month’s report, February 1993 through August 2026.
The newest well, seen from the side
No well on the way. Well 12 was completed in July 1989.
- Permit filedNot on file
- Drilling startedNot on file
- FrackedNot on file
- Completion filedJuly 31, 1989
- First production on the leaseNot on file
- First checkNot on file
SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 18, 2026.
Royalty Watch follows new well permits and completions on this lease.Watch this lease
About 6 miles across
Wells on this lease and around it
For a lawyer, a buyer or a probate file. Six more have no location on the State's map. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.
From the State's well records
13 wells on this lease, ten plugged
| Well | API number | Completed | Depthfeet | Today |
|---|---|---|---|---|
| 10 | 42-009-12672 | January 1984 | – | Plugged |
| 4 | 42-009-82104 | January 1984 | – | Plugged |
| 5 | 42-009-82105 | January 1984 | – | Plugged |
| 6 | 42-009-82106 | January 1984 | – | Plugged |
| 7 | 42-009-82107 | January 1984 | – | Plugged |
| 8 | 42-009-82108 | January 1984 | – | Plugged |
| 9 | 42-009-82109 | January 1984 | – | Plugged |
| 15 | 42-009-82115 | January 1984 | – | Plugged |
| 16 | 42-009-82116 | January 1984 | – | Active |
| 17 | 42-009-82117 | January 1984 | – | Active |
| 18 | 42-009-82118 | January 1984 | – | Shut in |
| 12 | 42-009-12658 | July 1989 | 638 | Plugged |
| 13 | 42-009-12665 | July 1989 | 624 | Plugged |
SourceRailroad Commission wellbore and completion records.
Oil, August 2026, dollars per barrel New
Four prices for the same oil
What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.
The State approved a lower tax for this lease
- Kind
- Low Producing Leases
- Wells
- The whole lease
- Runs
- March 2016 to no end date on file
- Rate
- Not given in the file
Look at the tax line on your statement for this lease. The record says which rate applies.
Estimate your royalty
Type the decimal from your division order
The starting decimal is an example. Nothing you type here leaves this page.
$6.25a month
At these prices the whole lease’s reported sales were about $19,200 over 12 reported months. Your estimated share is $75 before taxes and deductions.
Monthly owner volumes and values
| Month | Oil (bbl) | Oil value | Gas (mcf) | Gas value | Total |
|---|---|---|---|---|---|
| August 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| July 2026 | 0.4297 | $34.57 | 0 | $0.00 | $34.57 |
| June 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| May 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| April 2026 | 0.1875 | $18.81 | 0 | $0.00 | $18.81 |
| March 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| February 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| January 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| December 2025 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| November 2025 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| October 2025 | 0.3555 | $21.64 | 0 | $0.00 | $21.64 |
| September 2025 | 0 | $0.00 | 0 | $0.00 | $0.00 |
SourcesMarket: U.S. Energy Information Administration (WTI Cushing for oil). Investors: no public parent's filing is on record for the operator. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.
Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus
Who takes the oil and gasNew
No buyer shares an owner with the operator
The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.
No shared owner, officer or address on record between the oil buyers and the operator.
Earlier buyers and gatherers, back to 1993
| Company | Product | Role | From | Until |
|---|---|---|---|---|
| EXPLORE LOGISTICS LLC | Oil | Gathers | Oct 2022 | Jan 2024 |
| GULFMARK ENERGY, INC. | Oil | Gathers | Feb 2020 | Oct 2022 |
| GULFMARK ENERGY, INC. | Oil | Gathers | Oct 2018 | Feb 2020 |
| TRANSOIL MARKETING, LLC | Oil | Gathers | Dec 2017 | Feb 2020 |
Who buys my oilOil price check
SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.
Royalty Watch tells you the day the buyer of your oil or gas changes.Watch this lease
Seen from space, 2025New
No satellite heat at this pad in 2025
Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.
A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.
nights with heat recorded at this pad, 2025.
months in which flaring was reported.
months with heat seen and no flaring reported.
SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 17, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.
Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus
The county appraisal roll
No public roll figures
County mineral roll
No public roll figures
There are no publishable figures for this lease from the 2026 county mineral roll.
Royalty Clerk has mineral rolls for 165 Texas counties.
Source County appraisal district mineral rolls.
From the state record
What owners ask about Prideaux -C-
- 01When is the check for July 2026 due?
- Jul 31sale month endsSept 29oil due
- July 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Sep 29, 2026, unless the lease sets another time.
- Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
- See your next three checks
- 02Which Texas production tax rate applies?
- Oil4.60%
- The Texas Comptroller lists low producing leases for this lease, from Mar 1, 2016. Its file does not give the rate, so we compare your stub with the full 4.6%. That is for July 2026.
- Source: Texas Comptroller, approved severance tax exemptions.
- Check the tax on your stub
- 03Who buys the oil and gas?
- OILPtt Premier Trading and Tran LLC100%
- Oil: Ptt Premier Trading and Tran LLC gathers it. The buyer's price is what a royalty check is figured on.
- Source: Railroad Commission Form P-4, gatherers and purchasers.
- See every buyer and past buyers
- 04How many 1099s should an owner expect for 2025?
- 1January to December 2025: one operator of record in all 12 months
- One company, DM Backhoe Service, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
- Source: Railroad Commission production reports, operator of record by month.
- Check your 1099 against it
Every monthly report the State holds
403 months, newest first
| Month | Oil soldbarrels | Sold forat public prices | Operator |
|---|---|---|---|
| AugustAug 2026 | No oil or gas reported | DM Backhoe Service | |
| JulyJul 2026 | 110 | $8,850 | DM Backhoe Service |
| JuneJun 2026 | No oil or gas reported | DM Backhoe Service | |
| MayMay 2026 | No oil or gas reported | DM Backhoe Service | |
| AprilApr 2026 | 48 | $4,820 | DM Backhoe Service |
| MarchMar 2026 | No oil or gas reported | DM Backhoe Service | |
| FebruaryFeb 2026 | No oil or gas reported | DM Backhoe Service | |
| JanuaryJan 2026 | No oil or gas reported | DM Backhoe Service | |
| DecemberDec 2025 | No oil or gas reported | DM Backhoe Service | |
| NovemberNov 2025 | No oil or gas reported | DM Backhoe Service | |
| OctoberOct 2025 | 91 | $5,540 | DM Backhoe Service |
| SeptemberSep 2025 | No oil or gas reported | DM Backhoe Service | |
| AugustAug 2025 | No oil or gas reported | DM Backhoe Service | |
| JulyJul 2025 | 104 | $7,110 | DM Backhoe Service |
| JuneJun 2025 | No oil or gas reported | DM Backhoe Service | |
| MayMay 2025 | 78 | $4,850 | DM Backhoe Service |
| AprilApr 2025 | No oil or gas reported | DM Backhoe Service | |
| MarchMar 2025 | 82 | $5,600 | DM Backhoe Service |
SourcesTexas Railroad Commission Production Data Query, through August 2026. Prices: EIA.
Likely owed Jan 2025
A whole month was never paid
The state shows 28,175 bbl of oil sold from this lease in January 2025, so your share is 27.51 bbl. No statement covers January 2025. That is the month the operator changed from Endeavor Energy Resources to Diamondback.
Ask Diamondback owner relations: is January 2025 being held in suspense after the change of operator?
$2,277oil + gas
A sample finding, from our example check. The full example found $3,328 likely owed.
Around this lease
Nearby
DM Backhoe Service in Archer County
- Prideaux-Fresno882 bbl last 12 months
- Prideaux -I-567 bbl last 12 months
- Prideaux, Henry511 bbl last 12 months
- Prideaux, Inez433 bbl last 12 months
- Parkey A346 bbl last 12 months
- Parkey344 bbl last 12 months
- Ferguson "CX"313 bbl last 12 months
- Dearing, W. R.119 bbl last 12 months
- Parkey, J. R.71 bbl last 12 months
- Prideaux, H. O.16 bbl last 12 months
Archer County Regular field
- Finkler258 bbl last 12 months
- JDL Ranch252 bbl last 12 months
- Hemmi, Theresia "D"251 bbl last 12 months
- Andrews249 bbl last 12 months
- Hastings233 bbl last 12 months
- Perkins, J. J., -B- Shallow225 bbl last 12 months
- Hausler223 bbl last 12 months
- Campbell220 bbl last 12 months
- Colgan215 bbl last 12 months
- Wilson-Fraser214 bbl last 12 months
Leases within 10 km
- Loftin Ag3no production in the last 12 months · 0.3 km
- Prideaux532 bbl last 12 months · 0.4 km
- Prideaux-Pardueno production in the last 12 months · 0.4 km
- Prideaux C38 bbl last 12 months · 0.4 km
- Prideaux, H. O.no production in the last 12 months · 0.5 km
- Prideaux-Fresno882 bbl last 12 months · 0.5 km
- Prideaux, Inez433 bbl last 12 months · 0.6 km
- Prideauxno production in the last 12 months · 0.7 km
- Prideaux Ano production in the last 12 months · 1 km
- Prideaux, H. O.16 bbl last 12 months · 1 km
Drilling permits within 10 km
- DAVIS 'D' #4new drill · Pop Operating Company · Jun 10, 2026 · 8.4 km
- BRIDWELL ARCHER RANCH -C- #2new drill · Bridwell Oil Co. · Mar 6, 2026 · 9.7 km
- BRIDWELL ARCHER RANCH -M- #5new drill · Bridwell Oil Co. · Jan 29, 2025 · 8.8 km
- P-MAC #5re-entry · Rogers Drilling Co., Inc. · Oct 24, 2024 · 3.7 km
- ASH-BAKER #2new drill · JDL Operating, LLC · May 6, 2024 · 6.9 km
Sister leases
- Prideaux1,395 bbl last 12 months
- Prideaux -I-567 bbl last 12 months
- Prideaux532 bbl last 12 months
- Prideaux C38 bbl last 12 months
- Prideaux16 bbl last 12 months
- Prideauxno production in the last 12 months
- Prideauxno production in the last 12 months
- Prideaux -37-no production in the last 12 months
- Prideaux Ano production in the last 12 months
- Prideaux -D-no production in the last 12 months
Where it sits
This county
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells
- Texas Comptroller tax approvals, lease values
- U.S. Energy Information Administration prices
- NOAA storms and cold
- NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
- U.S. Geological Survey photos