Skip to content
Royalty Clerk

Texas oil lease

Producing

RAZORBACK 663 C

Razorback 663 C is an oil lease in Yoakum County, Texas, operated by Ring Energy, Inc. in the Platang (San Andres) field.

1 well

48,130bbl oil, last 12 months+6% vs prior year
RRC lease
8A-71300

Is your check right?

Check my statement

Where it sits

This county

Yoakum CountyYoakumHockleyCochranTerryYoakum County
Yoakum County
Gas, last 12 months
146,355 mcf
Oil in Jul 2026
3,945 bbl

Production by month

Oil output rose 6% over the last 12 months

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output rose 6% over the last 12 monthsMonthly oil production and gas for RAZORBACK 663 C, Aug 2023 to Jul 2026. Oil output rose 6% over the last 12 months. 48,130 bbl in the 12 months through Jul 2026, against 45,345 bbl in the 12 months before.Last 12 months: 48,130 bblbbl per monthmcf per month002,0005,0004,00010k6,00015k8,00020k10k25kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output rose 6% over the last 12 monthsMonthly oil production and gas for RAZORBACK 663 C, Aug 2023 to Jul 2026. Oil output rose 6% over the last 12 months. 48,130 bbl in the 12 months through Jul 2026, against 45,345 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month002,0005,0004,00010k6,00015k8,00020k10k25kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

98% of the gas went to a processing plant in the last 12 months

Flaring peaked at 9.2% of the gas in Oct 2025.

  • Processing plant (3)
  • Flared (4)
98% of the gas went to a processing plant in the last 12 monthsShare of RAZORBACK 663 C gas by disposition code each month, Aug 2023 to Jul 2026. 98% of the gas went to a processing plant in the last 12 months. Flaring peaked at 9.2% of the gas in Oct 2025.Share of the lease’s gas by disposition code, per month0%50%100%Flared 9.2%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
98% of the gas went to a processing plant in the last 12 monthsShare of RAZORBACK 663 C gas by disposition code each month, Aug 2023 to Jul 2026. 98% of the gas went to a processing plant in the last 12 months. Flaring peaked at 9.2% of the gas in Oct 2025.Share of gas by disposition code0%50%100%Flared 9.2%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Processing plant (3)

    98% · 143,836 mcf

  • Flared (4)

    1.7% · 2,519 mcf

1.7% of the gas flared in the last 12 months. 3 months above 3%.

1 well on this lease

Wells on RAZORBACK 663 C
API numberWell no.Status
42-501-373634HActive

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Sentinel Transportation, LLCOilGathers100Nov 7, 2022–
Targa San Andres Gas Services LlCasinghead gasBuys100Mar 1, 2026–
Targa San Andres Gas Utility LLCCasinghead gasGathers100Mar 1, 2026–
Stakeholder Gas Utility, LLCCasinghead gasGathers100Nov 7, 2022Mar 1, 2026
Stakeholder Gas Services, LLCCasinghead gasBuys100Nov 7, 2022Mar 1, 2026

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

160 acres on the newest permit

An allocation well is on this lease

Permits for Razorback 663 C
API numberWell no.Acreson the permit
42-501-373634H160

SourceRailroad Commission drilling permits, Sep 26, 2026 (source 1, source 2).

What Ring Energy, Inc. told investors it received

Ring Energy, Inc. is linked to Ring Energy, Inc. (REI).
Realized prices reported by Ring Energy, Inc.
QuarterOil$ per bblFiling
Q2 2026$95.45SEC filing
Q1 2026$68.97SEC filing
Q4 2025$57.47SEC filing
Q3 2025$64.32SEC filing
Q2 2025$62.69SEC filing
Q1 2025$70.40SEC filing

SourceRing Energy, Inc. quarterly reports, SEC EDGAR, company-wide averages before hedging.

Estimate your royalty

36 months, newest first

Ledger for RAZORBACK 663 C
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 20263,9453,97916,33716,27067$80.46$2.89
Jun 20264,4484,55014,91614,527389$84.81$3.15
May 20265,5305,46322,29022,22169$102.13$2.94
Apr 20265,3315,38018,96917,9611,008$100.32$2.77
Mar 20265,9445,92819,07619,05422$91.38$3.04
Feb 20265,6455,44616,55216,5520$64.51$3.62
Jan 20261,7171,7954,4964,4960$60.04$7.72
Dec 20252,4082,4395,9735,842131$57.97$4.26
Nov 20252,2822,3125,1715,1710$60.06$3.79
Oct 20253,5353,4537,6606,958702$60.89$3.19
Sep 20253,5263,5627,5057,5050$63.96$2.97
Aug 20253,8193,8107,4107,279131$64.86$2.91
Jul 20253,0983,1033,4173,4170$68.39$3.20
Jun 20252,9062,8172,8532,8530$68.17$3.02
May 20252,4722,5582,9062,9060$62.17$3.12
Apr 20253,3133,2843,0783,0780$63.54$3.42
Mar 20253,7283,8756,7986,7980$68.24$4.12
Feb 20252,9712,8947,2997,2990$71.53$4.19
Jan 20252,4742,7257,6247,6240$75.74$4.13
Dec 20245,4655,41515,02615,0260$70.12$3.01
Nov 20244,4154,42014,55614,5560$69.95$2.12
Oct 20244,9295,06413,67713,6770$71.99$2.20
Sep 20244,9564,80912,38412,3840$70.24$2.28
Aug 20244,6184,40012,16012,022138$76.68$1.99
Jul 20242,4802,6307,4556,983472$81.80$2.07
Jun 20245,0265,09411,25711,2570$79.77$2.54
May 20245,2255,0328,6808,6800$80.02$2.12
Apr 20243,2783,4355,9025,9020$85.35$1.60
Mar 20245,8115,7497,4897,4890$81.28$1.49
Feb 20244,8644,9355,8055,8050$77.25$1.72
Jan 20243,1703,4274,6854,6850$74.15$3.18
Dec 20234,9684,6209,1289,1280$71.90$2.52
Nov 20235,1875,1838,1678,1670$77.69$2.71
Oct 20236,0886,2518,7718,7710$85.64$2.98
Sep 20235,9135,7927,2407,2400$89.43$2.64
Aug 20234,6854,6156,0836,0830$81.39$2.58

Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Sep 28, 2026.

How to check your stub against this lease

Do your checks match this lease?

Nearby

Ring Energy, Inc. in Yoakum County

All Ring Energy, Inc. leases →

Platang (San Andres) field

All leases in this field →

Leases within 10 km

Drilling permits within 10 km