Skip to content

Texas oil lease · RRC district 7C · Lease 16557

Producing

REAGAN

Reagan is an oil lease in Upton County, Texas, operated by Firebird Energy II LLC in the Spraberry (Trend Area) field. The Railroad Commission shows 1,521 bbl of oil in the 12 months through Jul 2026.

Oil lease dossier · 7 wells

1,521bbl oil, last 12 months+17% vs prior year
RRC lease
7C-16557

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Upton CountyUptonMidlandCraneGlasscockReaganEctorUpton County
Upton County · RRC district 7COpen Upton County →
Gas, last 12 months
1,941 mcf
Oil in Jul 2026
10 bbl
Reporting to the state
since Jan 2020
Wells
7

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Oil output rose 17% over the last 12 months

1,521 bbl in the 12 months through Jul 2026, against 1,303 bbl in the 12 months before.

  • Oil (bars, left axis)
  • Gas (line, right axis)
  • Last 12 months
Oil output rose 17% over the last 12 monthsMonthly oil production and gas for REAGAN, Aug 2023 to Jul 2026. Oil output rose 17% over the last 12 months. 1,521 bbl in the 12 months through Jul 2026, against 1,303 bbl in the 12 months before.Last 12 months: 1,521 bblbbl per monthmcf per month00200100400200600300800400Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output rose 17% over the last 12 monthsMonthly oil production and gas for REAGAN, Aug 2023 to Jul 2026. Oil output rose 17% over the last 12 months. 1,521 bbl in the 12 months through Jul 2026, against 1,303 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month00200100400200600300800400Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, oil lease 16557, district 7C. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

Over 99% of the gas went to a processing plant in the last 12 months

Flaring peaked at 78.3% of the gas in Feb 2024.

  • Processing plant (3)
  • Flared (4)
Over 99% of the gas went to a processing plant in the last 12 monthsShare of REAGAN gas by disposition code each month, Aug 2023 to Jul 2026. Over 99% of the gas went to a processing plant in the last 12 months. Flaring peaked at 78.3% of the gas in Feb 2024.Share of the lease’s gas by disposition code, per month0%50%100%Flared 78.3%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Over 99% of the gas went to a processing plant in the last 12 monthsShare of REAGAN gas by disposition code each month, Aug 2023 to Jul 2026. Over 99% of the gas went to a processing plant in the last 12 months. Flaring peaked at 78.3% of the gas in Feb 2024.Share of gas by disposition code0%50%100%Flared 78.3%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 16557, district 7C. Reported through Jul 2026.

Processing plant (3)

Sent to a gas plant that pulls out natural gas liquids. Your statement should show plant products, and may show processing fees.

Flared (4)

Burned off or vented, not sold. It pays no royalty. More than 3% in a month is worth watching.

Over the last 12 months, 0.4% of the gas was flared. 5 months went above 3%, which we mark in the ledger below.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed once, most recently in Nov 2023

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeSummit Petroleum LLC, Jan 2020 to Oct 2023; Firebird Energy II LLC, Nov 2023 to Jul 20262020202120222023202420252026Changed Nov 2023Summit Petroleum LLCJan 2020 to Oct 2023Firebird Energy II LLCNov 2023 to now
Operators of this lease over timeSummit Petroleum LLC, Jan 2020 to Oct 2023; Firebird Energy II LLC, Nov 2023 to Jul 20262020202120222023202420252026Changed Nov 2023Summit Petroleum LLCJan 2020 to Oct 2023Firebird Energy II LLCNov 2023 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

7 wells on this lease

Every well the Railroad Commission links to oil lease 16557 in district 7C. The API number is the state’s ID for a well.
Wells on REAGAN
API numberWell no.Status
42-461-355253905Shut-in
42-461-355263507Active
42-461-355283907Shut-in
42-461-355573505Shut-in
42-461-363113909Shut-in
42-461-364043509Active
42-461-377783515Active

SourceTexas Railroad Commission Wellbore Query, district 7C, lease 16557.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Oil

    Plains Marketing, L.p. gathers it.

    100% of it, on the list since Apr 1, 2010

  • Gas from oil wells

    Energy Transfer Company buys and gathers it.

    Energy Transfer Company buys it: 100% of it, on the list since Aug 1, 2024 · Energy Transfer Company gathers it: 100% of it, on the list since Aug 1, 2024

Companies that used to be listed: Wtg South Permian Midstream LLC (gathers it, until Aug 1, 2024); Wtg South Permian Midstream LLC (buys it, until Aug 1, 2024); Dcp Operating Company, LP (gathers it, until Feb 1, 2021); Dcp Operating Company, LP (buys it, until Feb 1, 2021).

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

640 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
75 not plugged
Horizontal
0
First completion
Feb 6, 2008
Latest permit
Dec 6, 2011

7 wells are listed on this lease

Each well can have its own unit. The decimal for one well does not have to equal the decimal for another.

Wells and acres on the permits for Reagan
API numberWell no.Acreson the permit
42-461-377783515640
42-461-364043509640
42-461-363113909640
42-461-355573505640
42-461-355283907640
42-461-355253905640
42-461-355263507640

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says REAGAN sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for REAGAN
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Firebird Energy100000$80.46$2.89
Jun 2026Firebird Energy88177440$84.81$3.15
May 2026Firebird Energy139078780$102.13$2.94
Apr 2026Firebird Energy14417744440$100.32$2.77
Mar 2026Firebird Energy14217941410$91.38$3.04
Feb 2026Firebird Energy1741741841840$64.51$3.62
Jan 2026Firebird Energy1881652792790$60.04$7.72
Dec 2025Firebird Energy1781782152150$57.97$4.26
Nov 2025Firebird Energy1091692232230$60.06$3.79
Oct 2025Firebird Energy3702602519$60.89$3.19
Sep 2025Firebird Energy1491792832830$63.96$2.97
Aug 2025Firebird Energy1631773303300$64.86$2.91
Jul 2025Firebird Energy1831643493490$68.39$3.20
Jun 2025Firebird Energy2303583663660$68.17$3.02
May 2025Firebird Energy5293343583580$62.17$3.12
Apr 2025Firebird Energy471722162160$63.54$3.42
Mar 2025Firebird Energy3601851850$68.24$4.12
Feb 2025Firebird Energy491801561560$71.53$4.19
Jan 2025Firebird Energy3401701700$75.74$4.13
Dec 2024Firebird Energy3901911910$70.12$3.01
Nov 2024Firebird Energy3902032030$69.95$2.12
Oct 2024Firebird Energy4402192190$71.99$2.20
Sep 2024Firebird Energy3401271270$70.24$2.28
Aug 2024Firebird Energy39093930$76.68$1.99
Jul 2024Firebird Energy161651141140$81.80$2.07
Jun 2024Firebird Energy4717382820$79.77$2.54
May 2024Firebird Energy1101011010$80.02$2.12
Apr 2024Firebird Energy2101751750$85.35$1.60
Mar 2024Firebird Energy106021918435$81.28$1.49
Feb 2024Firebird Energy48014331112$77.25$1.72
Jan 2024Firebird Energy5002062060$74.15$3.18
Dec 2023Firebird Energy621772192190$71.90$2.52
Nov 2023Firebird Energy6102012010$77.69$2.71
Oct 2023Summit Petroleum42015114110$85.64$2.98
Sep 2023Summit Petroleum4401811774$89.43$2.64
Aug 2023Summit Petroleum44032731017$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for REAGAN. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Firebird Energy II LLC.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Firebird Energy II LLC in Upton County

All Firebird Energy II LLC leases →

Spraberry (Trend Area) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 16557, district 7C, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.