Texas gas wellRRC 09-246451Producing
Reed Mitchell Unit
One well on 237 acres in Tarrant County. The lease produced 64,593 thousand cubic feet of gas in the last 12 months, through August 2026.
- Operator
- Eagleridge Operating, LLC
- County
- Tarrant
- On record since
- December 2008
- Newest report on file
- August 2026
- Unit on the newest permit
- 237 acres
Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.
The story, from 213 monthly reports
On record since December 2008
December 2008: the first month the lease sold gas on record, 50,187 thousand cubic feet.
July 2017: Eagleridge Operating, LLC took over.
April 2023 to September 2023: six months in a row with no oil and no gas reported.
August 2026 is the newest monthly production report on file.
SourceRailroad Commission production reports, December 2008 through August 2026. Not a forecast, not reserves.
213 months against 7 other recordsNew
Every month since December 2008, and what else happened that month
The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.
Gas averaged $3.04 an mcf · Eagleridge Operating, LLC
- WeatherFlash flood, March 10. Flash flood, March 10.
Move the pointer or drag across the chart. The numbered buttons jump to each drop.
Monthly gas sold from this lease since December 2008, with seven record tracks beneath it. Use the left and right arrow keys to move month by month.. 213 months from December 2008 to August 2026. The most in one month: 108,610 mcf, January 2009. The newest month: 4,948 mcf. 13 months with nothing reported. Moments marked: 1, Jun 2010; 2, Apr 2012; 3, Jun 2012; 4, Dec 2012; 5, Feb 2016; 6, Aug 2016; 7, Mar 2023; 8, Mar 2026.
SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through August 2026.
Royalty Watch tells you the month a drop starts, with the records from that month.Watch this lease
210 months, one line eachNew
Six months of silence in 2023
A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.
months in a row with nothing reported, April to September 2023. Reports are on file for all 6 months, with no oil and no gas. The longest silence on record here.
thousand cubic feet of gas on the newest report on file with oil or gas, for August 2026, the State's newest month.
of 210 months with oil or gas reported since December 2008.
thousand cubic feet of gas a day on average from September 2025 through August 2026, counting a month with no report on file as zero.
A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.
SourceRailroad Commission production reports, December 2008 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.
Royalty Watch tells you when a silent month starts, and drafts the letter asking whether the lease is still in force.Watch this lease
19 years of state records, 2008 to 2026
Sold since December 2008
$11million
Only filed sales with a published price are included. Some sales figures or prices are unavailable.
- Gas sold
- 2,947,059thousand cubic feet
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 2008 | $0 | $292,000 | $292,000 |
| 2009 | $0 | $2.93 million | $2.93 million |
| 2010 | $0 | $1.69 million | $1.69 million |
| 2011 | $0 | $1.05 million | $1.05 million |
| 2012 | $0 | $693,000 in priced filings | $693,000 in priced filings |
| 2013 | $0 | $857,000 | $857,000 |
| 2014 | $0 | $765,000 | $765,000 |
| 2015 | $0 | $347,000 | $347,000 |
| 2016 | $0 | $303,000 | $303,000 |
| 2017 | $0 | $335,000 | $335,000 |
| 2018 | $0 | $287,000 | $287,000 |
| 2019 | $0 | $228,000 | $228,000 |
| 2020 | $0 | $174,000 | $174,000 |
| 2021 | $0 | $253,000 | $253,000 |
| 2022 | $0 | $324,000 | $324,000 |
| 2023 | $0 | $9.24 | $9.24 |
| 2024 | $0 | $108,000 | $108,000 |
| 2025 | $0 | $197,000 | $197,000 |
| 2026, 2026 so far | $0 | $140,000 | $140,000 |
Did a relative own a share of this lease?
SourcesRailroad Commission Production Data Query, every monthly report since December 2008. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.
Who has run this lease
The operator changed three times, most recently in July 2017
The company named on each monthly report to the State. The operator is not always the company that pays.
- Eagleridge Operating, LLCJuly 2017 to now
- Operator number 870311March 2015 to June 2017
- Operator number 495557June 2011 to February 2015
- Operator number 691703December 2008 to May 2011
SourcesRailroad Commission production reports, the operator on each month’s report, December 2008 through August 2026.
The newest well, seen from the side
No well on the way. Well B 3H was completed in December 2008.
- Permit filedNot on file
- Drilling startedNot on file
- FrackedNot on file
- Completion filedDecember 13, 2008
- First production on the leaseNot on file
- First checkNot on file
SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 17, 2026.
Royalty Watch follows new well permits and completions on this lease.Watch this lease
About 6 miles across
Wells on this lease and around it
For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.
From the State's well records
One well on this lease
| Well | API number | Completed | Sidewaysfeet | Depthfeet | Today |
|---|---|---|---|---|---|
| B 3H | 42-439-33067 | December 2008 | 1,915 | 7,133 | Active |
SourceRailroad Commission wellbore and completion records.
What the drilling permits say
237acres on the newest permit
- 237 acres, on the 2008 permits
A Rule 37 case is listed The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.
Gas, August 2026, dollars per thousand cubic feet New
Four prices for the same gas
What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.
The State approved a lower tax for this lease
- Kind
- Low Producing Wells
- Wells
- The whole lease
- Runs
- July 2012 to no end date on file
- Rate
- Not given in the file
Look at the tax line on your statement for this lease. The record says which rate applies.
Estimate your royalty
Type the decimal from your division order
The starting decimal is an example. Nothing you type here leaves this page.
$67a month
At these prices the whole lease’s reported sales were about $207,000 over 12 reported months. Your estimated share is $809 before taxes and deductions.
Monthly owner volumes and values
| Month | Oil (bbl) | Oil value | Gas (mcf) | Gas value | Total |
|---|---|---|---|---|---|
| August 2026 | 0 | $0.00 | 19.3281 | $53.73 | $53.73 |
| July 2026 | 0 | $0.00 | 22.9883 | $66.44 | $66.44 |
| June 2026 | 0 | $0.00 | 11.4688 | $36.13 | $36.13 |
| May 2026 | 0 | $0.00 | 21.2422 | $62.45 | $62.45 |
| April 2026 | 0 | $0.00 | 22.4414 | $62.16 | $62.16 |
| March 2026 | 0 | $0.00 | 4.7539 | $14.45 | $14.45 |
| February 2026 | 0 | $0.00 | 24.7266 | $89.51 | $89.51 |
| January 2026 | 0 | $0.00 | 20.9648 | $161.85 | $161.85 |
| December 2025 | 0 | $0.00 | 19.3398 | $82.39 | $82.39 |
| November 2025 | 0 | $0.00 | 18.2734 | $69.26 | $69.26 |
| October 2025 | 0 | $0.00 | 20.0664 | $64.01 | $64.01 |
| September 2025 | 0 | $0.00 | 15.7148 | $46.67 | $46.67 |
SourcesMarket: U.S. Energy Information Administration (Henry Hub for gas, taken per thousand cubic feet). Investors: no public parent's filing is on record for the operator. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.
Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus
Who takes the oil and gasNew
No buyer shares an owner with the operator
The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.
No shared owner, officer or address on record between the gas buyers and the operator.
No shared owner, officer or address on record between the oil buyers and the operator.
Earlier buyers and gatherers, back to 1993
| Company | Product | Role | From | Until |
|---|---|---|---|---|
| SUNOCO PTNRS. MKTG.&TERMINALS LP | Oil | Gathers | Dec 2008 | Dec 2022 |
Who buys my oilOil price check
SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.
Royalty Watch tells you the day the buyer of your oil or gas changes.Watch this lease
Seen from space, 2025New
No satellite heat at this pad in 2025
Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.
A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.
nights with heat recorded at this pad, 2025.
months in which flaring was reported.
months with heat seen and no flaring reported.
Where the gas went in 2025, as the operator reported it
SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 16, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.
Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus
Where the gas went, month by month
Since Feb 2024 the lease's gas goes to a transmission line instead of lease fuel
Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.
- Transmission line (2)88% · 56,655 mcf
- Lease fuel (1)12% · 7,938 mcf
SourcesRailroad Commission production reports, gas disposition by code, October 2023 to August 2026.
The county appraisal roll
No public roll figures
County mineral roll
No public roll figures
There are no publishable figures for this lease from the 2026 county mineral roll.
Royalty Clerk has mineral rolls for 158 Texas counties.
Source County appraisal district mineral rolls.
From the state record
What owners ask about Reed Mitchell Unit
- 01When is the check for August 2026 due?
- Aug 31sale month endsNov 29gas due
- August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the gas by Nov 29, 2026, unless the lease sets another time.
- Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
- See your next three checks
- 02Which Texas production tax rate applies?
- Gas7.50%
- The Texas Comptroller lists low producing wells for this lease, from Jul 1, 2012. Its file does not give the rate, so we compare your stub with the full 7.5%. That is for August 2026.
- Source: Texas Comptroller, approved severance tax exemptions.
- Check the tax on your stub
- 03Who buys the oil and gas?
- CONDEnergy Transfer Marketing & Term100%GASBarnett Gathering, LLC100%
- Condensate: Energy Transfer Marketing & Term gathers it. Gas from gas wells: Barnett Gathering, LLC buys and gathers it. The buyer's price is what a royalty check is figured on.
- Source: Railroad Commission Form P-4, gatherers and purchasers.
- See every buyer and past buyers
- 04How many 1099s should an owner expect for 2025?
- 1January to December 2025: one operator of record in all 12 months
- One company, Eagleridge Operating, LLC, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
- Source: Railroad Commission production reports, operator of record by month.
- Check your 1099 against it
Every monthly report the State holds
213 months, newest first
| Month | Gas soldthousand cubic feet | Flared or ventedthousand cubic feet | Sold forat public prices | Operator |
|---|---|---|---|---|
| AugustAug 2026 | 4,948 | 0 | $13,800 | Eagleridge Operating, LLC |
| JulyJul 2026 | 5,885 | 0 | $17,000 | Eagleridge Operating, LLC |
| JuneJun 2026 | 2,936 | 0 | $9,250 | Eagleridge Operating, LLC |
| MayMay 2026 | 5,438 | 0 | $16,000 | Eagleridge Operating, LLC |
| AprilApr 2026 | 5,745 | 0 | $15,900 | Eagleridge Operating, LLC |
| MarchMar 2026 | 1,217 | 0 | $3,700 | Eagleridge Operating, LLC |
| FebruaryFeb 2026 | 6,330 | 0 | $22,900 | Eagleridge Operating, LLC |
| JanuaryJan 2026 | 5,367 | 0 | $41,400 | Eagleridge Operating, LLC |
| DecemberDec 2025 | 4,951 | 0 | $21,100 | Eagleridge Operating, LLC |
| NovemberNov 2025 | 4,678 | 0 | $17,700 | Eagleridge Operating, LLC |
| OctoberOct 2025 | 5,137 | 0 | $16,400 | Eagleridge Operating, LLC |
| SeptemberSep 2025 | 4,023 | 0 | $11,900 | Eagleridge Operating, LLC |
| AugustAug 2025 | 2,925 | 0 | $8,510 | Eagleridge Operating, LLC |
| JulyJul 2025 | 3,752 | 0 | $12,000 | Eagleridge Operating, LLC |
| JuneJun 2025 | 5,732 | 0 | $17,300 | Eagleridge Operating, LLC |
| MayMay 2025 | 4,507 | 0 | $14,100 | Eagleridge Operating, LLC |
| AprilApr 2025 | 5,632 | 0 | $19,300 | Eagleridge Operating, LLC |
| MarchMar 2025 | 5,064 | 0 | $20,900 | Eagleridge Operating, LLC |
SourcesTexas Railroad Commission Production Data Query, through August 2026. Prices: EIA.
Likely owed Jan 2025
A whole month was never paid
The state shows 28,175 bbl of oil sold from this lease in January 2025, so your share is 27.51 bbl. No statement covers January 2025. That is the month the operator changed from Endeavor Energy Resources to Diamondback.
Ask Diamondback owner relations: is January 2025 being held in suspense after the change of operator?
$2,277oil + gas
A sample finding, from our example check. The full example found $3,328 likely owed.
Around this lease
Nearby
Eagleridge Operating, LLC in Tarrant County
- Green Bay Unit67,294 mcf last 12 months
- Alliance Alphabet Crossing Unit66,965 mcf last 12 months
- Cain Unit66,827 mcf last 12 months
- Alliance K Unit66,800 mcf last 12 months
- Stevenson Unit65,474 mcf last 12 months
- New Dawn Unit63,851 mcf last 12 months
- Benbrook Town Crossing63,741 mcf last 12 months
- Levy, Lester Unit62,540 mcf last 12 months
- Barton Hall Cecil Unit62,368 mcf last 12 months
- Carter Foundation62,090 mcf last 12 months
Newark, East (Barnett Shale) field
- Stagecoach64,631 mcf last 12 months
- Carter, B. S. JR.64,630 mcf last 12 months
- Spain "B" - Carpenter (Sa)64,619 mcf last 12 months
- Federal64,607 mcf last 12 months
- Robertson, Renno K. Gas Unit64,588 mcf last 12 months
- Tannahill, Clifton64,584 mcf last 12 months
- Johnson, Lottie Barton64,572 mcf last 12 months
- Edgecliff C64,570 mcf last 12 months
- Miller Unit64,563 mcf last 12 months
- Dwight Dodson Unit64,226 mcf last 12 months
Leases within 10 km
- Reed Mitchell Unitno production in the last 12 months · 0 km
- Twin Mills Unit1,520 mcf last 12 months · 0 km
- Twin Mills Unit11,684 mcf last 12 months · 0 km
- Boswell32,221 mcf last 12 months · 0.9 km
- Boswell Unitno production in the last 12 months · 0.9 km
- Boswellno production in the last 12 months · 0.9 km
- Cranz44,699 mcf last 12 months · 0.9 km
- Reed Mitchell Unit21,411 mcf last 12 months · 1.1 km
- Reed Mitchell Unit25,722 mcf last 12 months · 1.1 km
- Reed Mitchell Unit56,480 mcf last 12 months · 1.1 km
Drilling permits within 10 km
- EAGLECREST UNIT 2 (AW) #2Hrecompletion · horizontal · BKV North Texas, LLC · Nov 17, 2026 · 7.6 km
- COTTON COVE CCS #1new drill · BKV Dcarbon Ventures, LLC · Oct 1, 2024 · 8.3 km
- WILDLIFE A NW UNIT (AW) #1Hnew drill · horizontal · BKV North Texas, LLC · Oct 4, 2008 · 9.6 km
- RAILHEAD SOUTH UNIT #6Hnew drill · horizontal · BKV North Texas, LLC · Oct 19, 2005 · 6.9 km
Same name in district 09
- Reed Mitchell Unit84,453 mcf last 12 months
- Reed Mitchell Unit56,480 mcf last 12 months
- Reed Mitchell Unit25,722 mcf last 12 months
- Reed Mitchell Unit22,213 mcf last 12 months
- Reed Mitchell Unit21,411 mcf last 12 months
- Reed Mitchell Unit16,501 mcf last 12 months
- Reed Mitchell Unitno production in the last 12 months
- Reed Mitchell Unitno production in the last 12 months
- Reed Mitchell Unitno production in the last 12 months
Where it sits
This county
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells
- Texas Comptroller tax approvals, lease values
- U.S. Energy Information Administration prices
- FracFocus frac dates
- NOAA storms and cold
- NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
- U.S. Geological Survey photos