Texas oil lease · RRC district 09 · Lease 15784
ProducingRIDDLE
Riddle is an oil lease in Jack County, Texas, operated by PRC Operating, Inc. in the Dillard, Se. (Ellenburger) field. The Railroad Commission shows 1,650 bbl of oil in the 12 months through Jul 2026.
Oil lease dossier · 1 well
- Operator
- PRC Operating, Inc.
- County
- Jack County
- RRC lease
- 09-15784
Own a share of this lease?
Is your check right?
Upload a check stub or a phone photo. We compare every month with the state numbers on this page.
Free. No account needed. Two to four pages.
Where it sits
This county
- Gas, last 12 months
- 11 mcf
- Oil in Jul 2026
- 17 bbl
- Reporting to the state
- since Jan 2020
- Wells
- 1
Production
Month by month, from the state record
Oil output rose 53% over the last 12 months
1,650 bbl in the 12 months through Jul 2026, against 1,076 bbl in the 12 months before.
- Oil (bars, left axis)
- Gas (line, right axis)
- Last 12 months
SourceTexas Railroad Commission Production Data Query, oil lease 15784, district 09. Reported through Jul 2026. The state revises recent months.
Gas disposition
Where the gas went
All of the gas went to lease fuel in the last 12 months
Each bar is one month. Colors are the disposition codes the operator reported.
SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 15784, district 09. Reported through Jul 2026.
Lease fuel (1)
Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.
None of the gas was flared in the last 12 months.
Operator history
Who has run this lease
PRC Operating, Inc. has reported this lease for the whole period
No change of operator in the months we hold.
- PRC Operating, Inc. Jan 2020 to now
SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.
Wells
1 well on this lease
| API number | Well no. | Status | Total depthft |
|---|---|---|---|
| 42-237-20045 | 1 | Active | – |
SourceTexas Railroad Commission Wellbore Query, district 09, lease 15784.
Who buys and gathers
Who moves and buys this lease's production
Oil
Sentinel Transportation, LLC gathers it.
100% of it, on the list since Jun 1, 2009
SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.
Unit and wells
What the drilling permits say
- Wells on the permits
- 21 not plugged
- Horizontal
- 0
- First completion
- Sep 11, 1968
- Latest permit
- –
| API number | Well no. | Permit issued | Completed | Acreson the permit |
|---|---|---|---|---|
| 42-237-20006 | 2 | – | Jan 12, 1984 | – |
| 42-237-20045 | 1 | – | Sep 11, 1968 | – |
Estimator
Estimate your royalty for this lease
Estimator
What could your check be?
Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says RIDDLE sold each month.
For example 0.00097656, or a fraction like 1/1024.
Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.
Your estimate appears here
An estimate, not your check
Ledger
36 months, newest first
| Month | Oil producedbbl | Oil soldbbl | Gas producedmcf | Gas soldmcf, codes 2+3 | Flaredmcf, code 4 | WTI$ per bbl | Henry Hub$ per MMBtu |
|---|---|---|---|---|---|---|---|
| Jul 2026PRC Operating, | 17 | 0 | 0 | 0 | 0 | $80.46 | $2.89 |
| Jun 2026PRC Operating, | 163 | 171 | 1 | 0 | 0 | $84.81 | $3.15 |
| May 2026PRC Operating, | 180 | 170 | 1 | 0 | 0 | $102.13 | $2.94 |
| Apr 2026PRC Operating, | 176 | 172 | 1 | 0 | 0 | $100.32 | $2.77 |
| Mar 2026PRC Operating, | 163 | 165 | 1 | 0 | 0 | $91.38 | $3.04 |
| Feb 2026PRC Operating, | 167 | 170 | 1 | 0 | 0 | $64.51 | $3.62 |
| Jan 2026PRC Operating, | 165 | 170 | 1 | 0 | 0 | $60.04 | $7.72 |
| Dec 2025PRC Operating, | 169 | 173 | 1 | 0 | 0 | $57.97 | $4.26 |
| Nov 2025PRC Operating, | 115 | 171 | 1 | 0 | 0 | $60.06 | $3.79 |
| Oct 2025PRC Operating, | 86 | 166 | 1 | 0 | 0 | $60.89 | $3.19 |
| Sep 2025PRC Operating, | 112 | 0 | 1 | 0 | 0 | $63.96 | $2.97 |
| Aug 2025PRC Operating, | 137 | 171 | 1 | 0 | 0 | $64.86 | $2.91 |
| Jul 2025PRC Operating, | 29 | 0 | 1 | 0 | 0 | $68.39 | $3.20 |
| Jun 2025PRC Operating, | 15 | 0 | 1 | 0 | 0 | $68.17 | $3.02 |
| May 2025PRC Operating, | 15 | 0 | 1 | 0 | 0 | $62.17 | $3.12 |
| Apr 2025PRC Operating, | 37 | 169 | 1 | 0 | 0 | $63.54 | $3.42 |
| Mar 2025PRC Operating, | 120 | 0 | 1 | 0 | 0 | $68.24 | $4.12 |
| Feb 2025PRC Operating, | 117 | 170 | 1 | 0 | 0 | $71.53 | $4.19 |
| Jan 2025PRC Operating, | 122 | 176 | 1 | 0 | 0 | $75.74 | $4.13 |
| Dec 2024PRC Operating, | 124 | 0 | 1 | 0 | 0 | $70.12 | $3.01 |
| Nov 2024PRC Operating, | 153 | 162 | 1 | 0 | 0 | $69.95 | $2.12 |
| Oct 2024PRC Operating, | 146 | 168 | 1 | 0 | 0 | $71.99 | $2.20 |
| Sep 2024PRC Operating, | 95 | 171 | 1 | 0 | 0 | $70.24 | $2.28 |
| Aug 2024PRC Operating, | 103 | 0 | 1 | 0 | 0 | $76.68 | $1.99 |
| Jul 2024PRC Operating, | 87 | 170 | 1 | 0 | 0 | $81.80 | $2.07 |
| Jun 2024PRC Operating, | 61 | 0 | 1 | 0 | 0 | $79.77 | $2.54 |
| May 2024PRC Operating, | 27 | 0 | 1 | 0 | 0 | $80.02 | $2.12 |
| Apr 2024PRC Operating, | 186 | 179 | 1 | 0 | 0 | $85.35 | $1.60 |
| Mar 2024PRC Operating, | 156 | 171 | 1 | 0 | 0 | $81.28 | $1.49 |
| Feb 2024PRC Operating, | 97 | 171 | 1 | 0 | 0 | $77.25 | $1.72 |
| Jan 2024PRC Operating, | 92 | 0 | 1 | 0 | 0 | $74.15 | $3.18 |
| Dec 2023PRC Operating, | 91 | 171 | 1 | 0 | 0 | $71.90 | $2.52 |
| Nov 2023PRC Operating, | 63 | 0 | 1 | 0 | 0 | $77.69 | $2.71 |
| Oct 2023PRC Operating, | 70 | 166 | 1 | 0 | 0 | $85.64 | $2.98 |
| Sep 2023PRC Operating, | 69 | 0 | 1 | 0 | 0 | $89.43 | $2.64 |
| Aug 2023PRC Operating, | 75 | 172 | 1 | 0 | 0 | $81.39 | $2.58 |
No report filed More than 3% of gas flared
SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).
Check your statements
Do your checks match this lease?
Upload your statements for RIDDLE. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask PRC Operating, Inc.
- A month that was never paid
- Your share of the barrels and mcf
- The price against WTI and Henry Hub
- Fees taken on gas
- Late payment interest
Around this lease
Walk the neighborhood
This lease belongs to
PRC Operating, Inc. in Jack County
- MEEKS, F. B.
309 bbl last 12 months
- BRANTLEY, OLA UNIT
2,973 mcf last 12 months
Dillard, Se. (Ellenburger) field
- MEEKS, F. B.
344 bbl last 12 months
- MEEKS, F. B.
309 bbl last 12 months
- DILLARD WEST UNIT
247 bbl last 12 months
- SCHMITTOU, J.
1,320 mcf last 12 months
Leases within 10 km
Found by the location of their wells.
- PERSON, R.
0 bbl last 12 months · 0.6 km away
- KIRK
72 bbl last 12 months · 0.8 km away
- MARSHALL
0 bbl last 12 months · 0.8 km away
- PERSON
167 bbl last 12 months · 0.9 km away
- MEEKS, F. B.
309 bbl last 12 months · 1.1 km away
Drilling permits within 10 km
SOUTH BRISCOE #7E
new drill · DRY Creek Operating, LLC · Jack County · 9 km away
Permit 0918143 · Aug 27, 2026
MESA BRISCOE LUCKY #7H
new drill · horizontal · G & F Oil, Inc. · Jack County · 8.9 km away
Permit 0915218 · May 1, 2026
SOUTH BRISCOE #5C
recompletion · DRY Creek Operating, LLC · Jack County · 8.7 km away
Permit 0914742 · Apr 13, 2026
SOUTH BRISCOE #6P
new drill · DRY Creek Operating, LLC · Jack County · 8.8 km away
Permit 0914732 · Apr 13, 2026
JOHNSON #4
new drill · Caribou Operating, Inc. · Jack County · 9.7 km away
Permit 0900637 · Jun 25, 2024
How to read this page
Questions owners ask
What is a decimal interest?
It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.
How do I use this page to check a royalty check?
Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.
Why is the newest month Jul 2026?
The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.
Does this page show what my check should be?
No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.
Sources and method
Where these numbers come from
- Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 15784, district 09, reported through Jul 2026.
- Wells: Texas Railroad Commission Wellbore Query.
- Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
- Page updated Sep 28, 2026.
We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.