Texas gas well · RRC district 09 · Lease 252144
Shut inROWE UNIT
Rowe Unit is a gas well in Wise County, Texas, operated by Eagleridge Operating, LLC in the Newark, East (Barnett Shale) field.
Gas well dossier · 1 well
- Operator
- Eagleridge Operating, LLC
- County
- Wise County
- RRC lease
- 09-252144
Own a share of this lease?
Is your check right?
Upload a check stub or a phone photo. We compare every month with the state numbers on this page.
Free. No account needed. Two to four pages.
Where it sits
This county
- Gas in Jul 2026
- 0 mcf
- Reporting to the state
- since Jan 2020
- Wells
- 1
- Data through
- Jul 2026
Production
Month by month, from the state record
No gas produced in the last 12 months
The last month with output was Jan 2024, at 293 mcf.
- Gas (bars, left axis)
- Oil (line, right axis)
- Last 12 months
SourceTexas Railroad Commission Production Data Query, gas well 252144, district 09. Reported through Jul 2026. The state revises recent months.
Gas disposition
Where the gas went
Since Dec 2023 the lease's gas goes to lease fuel instead of a transmission line
Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.
- Transmission line (2)
- Lease fuel (1)
SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 252144, district 09. Reported through Jul 2026.
Transmission line (2)
Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.
Lease fuel (1)
Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.
None of the gas was flared in the 6 months reported.
Operator history
Who has run this lease
Eagleridge Operating, LLC has reported this lease for the whole period
No change of operator in the months we hold.
- Eagleridge Operating, LLC Jan 2020 to now
SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.
Wells
1 well on this lease
| API number | Well no. | Status | Total depthft |
|---|---|---|---|
| 42-497-36807 | 2H | Shut-in | – |
SourceTexas Railroad Commission Wellbore Query, district 09, lease 252144.
Who buys and gathers
Who moves and buys this lease's production
Condensate
Sentinel Transportation, LLC gathers it.
100% of it, on the list since Feb 1, 2024
Gas from gas wells
Eagleridge Operating, LLC buys and gathers it.
Eagleridge Operating, LLC buys it: 100% of it, on the list since Feb 1, 2024 · Eagleridge Operating, LLC gathers it: 100% of it, on the list since Feb 1, 2024
Companies that used to be listed: Ptt Premier Trading and Tran LLC (gathers it, until Feb 1, 2024); Colt Gathering (North Texas)l.p. (gathers it, until Feb 1, 2024); Colt G & P (North Texas) L.p. (buys it, until Feb 1, 2024); Gulfmark Energy, Inc. (gathers it, until Nov 1, 2023); Midcoast Gathering (N Tx) L.p. (gathers it, until Nov 1, 2023); Midcoast G & P (North Texas)l.p. (buys it, until Nov 1, 2023).
SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.
Unit and wells
160 acres on the newest permit
- Wells on the permits
- 11 not plugged
- Horizontal
- 1
- First completion
- Jun 1, 2009
- Latest permit
- Mar 25, 2009
| API number | Well no. | Permit issued | Completed | Acreson the permit |
|---|---|---|---|---|
| 42-497-36807 | 2H | Mar 25, 2009 | Jun 1, 2009 | 160 |
Estimator
Estimate your royalty for this lease
Estimator
What could your check be?
Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says ROWE UNIT sold each month.
For example 0.00097656, or a fraction like 1/1024.
Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.
Your estimate appears here
An estimate, not your check
Ledger
36 months, newest first
| Month | Oil producedbbl | Oil soldbbl | Gas producedmcf | Gas soldmcf, codes 2+3 | Flaredmcf, code 4 | WTI$ per bbl | Henry Hub$ per MMBtu |
|---|---|---|---|---|---|---|---|
| Jul 2026Eagleridge Operating, | 0 | 18 | 0 | 0 | 0 | $80.46 | $2.89 |
| Jun 2026Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $84.81 | $3.15 |
| May 2026Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $102.13 | $2.94 |
| Apr 2026Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $100.32 | $2.77 |
| Mar 2026Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $91.38 | $3.04 |
| Feb 2026Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $64.51 | $3.62 |
| Jan 2026Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $60.04 | $7.72 |
| Dec 2025Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $57.97 | $4.26 |
| Nov 2025Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $60.06 | $3.79 |
| Oct 2025Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $60.89 | $3.19 |
| Sep 2025Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $63.96 | $2.97 |
| Aug 2025Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $64.86 | $2.91 |
| Jul 2025Eagleridge Operating, | 1 | 0 | 0 | 0 | 0 | $68.39 | $3.20 |
| Jun 2025Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $68.17 | $3.02 |
| May 2025Eagleridge Operating, | 33 | 0 | 0 | 0 | 0 | $62.17 | $3.12 |
| Apr 2025Eagleridge Operating, | 14 | 0 | 0 | 0 | 0 | $63.54 | $3.42 |
| Mar 2025Eagleridge Operating, | 32 | 0 | 0 | 0 | 0 | $68.24 | $4.12 |
| Feb 2025Eagleridge Operating, | 0 | 178 | 0 | 0 | 0 | $71.53 | $4.19 |
| Jan 2025Eagleridge Operating, | 114 | 0 | 0 | 0 | 0 | $75.74 | $4.13 |
| Dec 2024Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $70.12 | $3.01 |
| Nov 2024Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $69.95 | $2.12 |
| Oct 2024Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $71.99 | $2.20 |
| Sep 2024Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $70.24 | $2.28 |
| Aug 2024Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $76.68 | $1.99 |
| Jul 2024Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $81.80 | $2.07 |
| Jun 2024Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $79.77 | $2.54 |
| May 2024Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $80.02 | $2.12 |
| Apr 2024Eagleridge Operating, | 0 | 86 | 0 | 0 | 0 | $85.35 | $1.60 |
| Mar 2024Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $81.28 | $1.49 |
| Feb 2024Eagleridge Operating, | 0 | 0 | 0 | 0 | 0 | $77.25 | $1.72 |
| Jan 2024Eagleridge Operating, | 0 | 0 | 293 | 0 | 0 | $74.15 | $3.18 |
| Dec 2023Eagleridge Operating, | 16 | 0 | 559 | 0 | 0 | $71.90 | $2.52 |
| Nov 2023Eagleridge Operating, | 23 | 0 | 1,704 | 1,131 | 0 | $77.69 | $2.71 |
| Oct 2023Eagleridge Operating, | 41 | 0 | 2,151 | 1,555 | 0 | $85.64 | $2.98 |
| Sep 2023Eagleridge Operating, | 28 | 0 | 2,629 | 2,097 | 0 | $89.43 | $2.64 |
| Aug 2023Eagleridge Operating, | 35 | 0 | 2,032 | 1,397 | 0 | $81.39 | $2.58 |
No report filed More than 3% of gas flared
SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).
Check your statements
Do your checks match this lease?
Upload your statements for ROWE UNIT. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Eagleridge Operating, LLC.
- A month that was never paid
- Your share of the barrels and mcf
- The price against WTI and Henry Hub
- Fees taken on gas
- Late payment interest
Around this lease
Walk the neighborhood
This lease belongs to
Eagleridge Operating, LLC in Wise County
- CRANDALL RANCH C
580,351 mcf last 12 months
- CRANDALL RANCH D
430,034 mcf last 12 months
- BLANTON LEWIS 'F'
417,475 mcf last 12 months
- SKINNER-FLETCHER F
376,055 mcf last 12 months
- SKINNER-FLETCHER B
344,241 mcf last 12 months
Newark, East (Barnett Shale) field
- EAGLE UNIT
105,186 bbl last 12 months
- NICHOLSON 17 (AW)
1,822,677 mcf last 12 months
- BORING, G W TRUSTEE GU 6 (AW)
1,460,734 mcf last 12 months
- G E NELON - WCCO 6 4 (AW)
1,512,363 mcf last 12 months
- CAMP CKC MIPA B
1,482,819 mcf last 12 months
Leases within 10 km
Found by the location of their wells.
- ROWE UNIT
7,511 mcf last 12 months · 0 km away
- STEVENS
0 mcf last 12 months · 0.2 km away
- MATZINGER UNIT
0 mcf last 12 months · 0.7 km away
- STEVENS "A"
0 mcf last 12 months · 0.7 km away
- BRYANT
144,526 mcf last 12 months · 0.7 km away
Drilling permits within 10 km
MURPHY #2H
new drill · horizontal · Lakota Energy, Ltd. · Wise County · 4.7 km away
Permit 0917646 · Aug 13, 2026
MURPHY #1H
new drill · horizontal · Lakota Energy, Ltd. · Wise County · 4.7 km away
Permit 0917645 · Aug 7, 2026
STEVENS #1H
new drill · horizontal · Lakota Energy, Ltd. · Wise County · 0.9 km away
Permit 0916903 · Jul 8, 2026
How to read this page
Questions owners ask
What is a decimal interest?
It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.
How do I use this page to check a royalty check?
Take the “Gas sold” volume for the month the check covers and multiply it by your decimal. The answer should match the mcf on your statement. If it does not, upload the statement and we will show where the two differ.
Why is the newest month Jul 2026?
The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.
Does this page show what my check should be?
No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.
Sources and method
Where these numbers come from
- Production and disposition by month: Texas Railroad Commission Production Data Query, gas well 252144, district 09, reported through Jul 2026.
- Wells: Texas Railroad Commission Wellbore Query.
- Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
- Page updated Sep 28, 2026.
We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.