Skip to content
Royalty Clerk

Texas gas well

Producing

ROXANNE FEE 46

Roxanne Fee 46 is a gas well in Culberson County, Texas, operated by Capitan Energy, Incorporated in the Ford, West (Wolfcamp) field.

1 well

221,406mcf gas, last 12 months+19% vs prior year
RRC lease
08-279347

Is your check right?

Check my statement

Where it sits

This county

Culberson CountyCulbersonCulberson County
Culberson County
Oil, last 12 months
15,544 bbl
Gas in Jul 2026
12,639 mcf

Checks stopped on this lease?

  • P-5

    The current operator's P-5 registration is listed as delinquent (last P-5 filed Jul 23, 2025).

SourceRailroad Commission production, P-5 and P-4 records, data through Jul 2026.

See why checks stop on this lease

Production by month

Gas output rose 19% over the last 12 months

  • Gas (bars)
  • Oil (line)
  • Last 12 months
Gas output rose 19% over the last 12 monthsMonthly gas production and oil for ROXANNE FEE 46, Aug 2023 to Jul 2026. Gas output rose 19% over the last 12 months. 221,406 mcf in the 12 months through Jul 2026, against 185,828 mcf in the 12 months before.Last 12 months: 221,406 mcfmcf per monthbbl per month005,0002,00010k4,00015k6,00020k8,00025k10kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Gas output rose 19% over the last 12 monthsMonthly gas production and oil for ROXANNE FEE 46, Aug 2023 to Jul 2026. Gas output rose 19% over the last 12 months. 221,406 mcf in the 12 months through Jul 2026, against 185,828 mcf in the 12 months before.Last 12 monthsmcf per monthbbl per month005,0002,00010k4,00015k6,00020k8,00025k10kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

98% of the gas went to a transmission line in the last 12 months

Flaring peaked at 17.3% of the gas in Dec 2024.

  • Transmission line (2)
  • Lease fuel (1)
  • Other (5 to 8)
  • Flared (4)
98% of the gas went to a transmission line in the last 12 monthsShare of ROXANNE FEE 46 gas by disposition code each month, Aug 2023 to Jul 2026. 98% of the gas went to a transmission line in the last 12 months. Flaring peaked at 17.3% of the gas in Dec 2024.Share of the lease’s gas by disposition code, per month0%50%100%Flared 17.3%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
98% of the gas went to a transmission line in the last 12 monthsShare of ROXANNE FEE 46 gas by disposition code each month, Aug 2023 to Jul 2026. 98% of the gas went to a transmission line in the last 12 months. Flaring peaked at 17.3% of the gas in Dec 2024.Share of gas by disposition code0%50%100%Flared 17.3%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Transmission line (2)

    98% · 238,470 mcf

  • Flared (4)

    1.3% · 3,267 mcf

  • Other (5 to 8)

    0.8% · 1,869 mcf

  • Lease fuel (1)

    0.2% · 407 mcf

1.3% of the gas flared in the last 12 months. 5 months above 3%.

1 well on this lease

Wells on ROXANNE FEE 46
API numberWell no.Status
42-109-328861HShut-in

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Pinnacle Midstream, LLCCondensateGathers100Jan 1, 2017–
Delaware Basin Midstream, LLCGas-well gasBuys50Feb 1, 2019–
Pinnacle Midstream, LLCGas-well gasBuys50Feb 1, 2019–
Delaware Basin Midstream, LLCGas-well gasGathers50Jan 1, 2017–
Pinnacle Midstream, LLCGas-well gasGathers50Jan 1, 2017–
Conocophillips CompanyGas-well gasBuys100Feb 15, 2016Feb 1, 2019

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

648 acres on the newest permit

Permits for Roxanne Fee 46
API numberWell no.Acreson the permit
42-109-328861H648

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for ROXANNE FEE 46
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 202667179412,63910,192172$80.46$2.89
Jun 202600000$84.81$3.15
May 202669361612,04411,96183$102.13$2.94
Apr 20261,2201,23620,00317,3272,676$100.32$2.77
Mar 20261,3821,38321,80121,8000$91.38$3.04
Feb 20261,2691,26619,65419,6540$64.51$3.62
Jan 20261,5691,53622,63522,6269$60.04$7.72
Dec 20251,5311,55122,99822,860138$57.97$4.26
Nov 20251,5661,55621,96321,9621$60.06$3.79
Oct 20251,8961,91823,33123,28942$60.89$3.19
Sep 20251,8971,88622,22022,2200$63.96$2.97
Aug 20251,8501,84322,11822,08632$64.86$2.91
Jul 20252,0862,08022,60722,493114$68.39$3.20
Jun 20252,5382,69422,88522,694191$68.17$3.02
May 20252,1912,23017,49217,255237$62.17$3.12
Apr 20251,9001,85511,42211,4211$63.54$3.42
Mar 20255,5275,56023,38923,31970$68.24$4.12
Feb 20254,0294,39311,29411,22569$71.53$4.19
Jan 20255263585,6384,079544$75.74$4.13
Dec 20241,5881,59317,21413,0022,981$70.12$3.01
Nov 20241,20299912,44410,738741$69.95$2.12
Oct 20241,0761,12513,28712,359208$71.99$2.20
Sep 20241,2611,30513,83112,376497$70.24$2.28
Aug 20242,2812,23314,32513,299245$76.68$1.99
Jul 20241,1921,18013,77413,2325$81.80$2.07
Jun 20241,2091,24713,19512,50830$79.77$2.54
May 20241,3251,23914,02312,901281$80.02$2.12
Apr 20241,2931,30813,55212,48135$85.35$1.60
Mar 20241,3491,38514,30813,22825$81.28$1.49
Feb 20241,2361,23613,39412,21824$77.25$1.72
Jan 20241,2621,28813,89512,7451$74.15$3.18
Dec 20231,4311,34814,83213,7971$71.90$2.52
Nov 20231,3361,27114,72013,6142$77.69$2.71
Oct 20231,4551,48015,04213,9951$85.64$2.98
Sep 20231,2551,33614,44413,6520$89.43$2.64
Aug 20231,9481,92816,98515,8670$81.39$2.58

Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Capitan Energy, Incorporated in Culberson County

All Capitan Energy, Incorporated leases →

Ford, West (Wolfcamp) field

All leases in this field →

Leases within 10 km

Drilling permits within 10 km