Skip to content

Texas oil lease

Producing

SHEPARD

Shepard is an oil lease in Young County, Texas, operated by Stewart Construction in the Kerlyn-Loving field.

5 wells

492bbl oil, last 12 months+8% vs prior year
RRC lease
09-07921

Is your family on this lease?

Email me when this lease changes
Oil in Aug 2026
33 bbl
Reporting since
Jan 2020

Did a relative own a share of this lease?

Pick the year they passed and see what the lease has sold since.

Checks stopped on this lease?

  • Operator

    Operator changed: Stewart Construction took over from Bluebonnet Land & Cattle Co. in Jul 2025.

  • P-5

    The previous operator's P-5 registration is listed as inactive since Oct 3, 2026 (last P-5 filed Sep 5, 2025).

SourceRailroad Commission production, P-5 and P-4 records, data through Aug 2026.

See why checks stop on this lease

Wells on this lease and around it

Where the state's map puts this lease's 5 wells, and what has been drilled or permitted within about 2 miles of them.
Map of the Shepard lease in Young County, Texas: its 5 wells ringed, among 143 wells and 0 recent drilling locations in a picture about 6 miles across.
  • This lease5Its wells, ringed on the map: 3 producing, 2 plugged
  • Drilling locations0Permits issued in the last two years
  • Producing wells69On a lease reporting production now
  • Not producing15Shut in, inactive or no lease on record
  • Plugged59The state's wellbore record says plugged

The 5 ringed dots are this lease's wells, each where the Railroad Commission's map puts it. The other dots are wells and drilling permits of the last 24 months on the land around it; the counts are for everything in the picture, which is about 6 miles across. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines, base map from USGS The National Map.

See the whole Texas well map

A one-page map of this lease to print, for a lawyer, a buyer or a probate file.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/shepard-09-07921"><img src="https://royaltyclerk.com/maps/lease-wells/shepard-09-07921.svg" alt="Map of the Shepard lease in Young County, Texas: its 5 wells ringed, among 143 wells and 0 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/shepard-09-07921">Wells on the Shepard lease, Young County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

Production by month

Oil output rose 8% over the last 12 months

  • Oil (bars)
  • Last 12 months
Oil output rose 8% over the last 12 monthsMonthly oil production for SHEPARD, Sep 2023 to Aug 2026. Oil output rose 8% over the last 12 months. 492 bbl in the 12 months through Aug 2026, against 455 bbl in the 12 months before.Last 12 months: 492 bblbbl per month0255075100Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output rose 8% over the last 12 monthsMonthly oil production for SHEPARD, Sep 2023 to Aug 2026. Oil output rose 8% over the last 12 months. 492 bbl in the 12 months through Aug 2026, against 455 bbl in the 12 months before.Last 12 monthsbbl per month0255075100Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Aug 2026.

From the state record

What owners ask about Shepard

When is the check for August 2026 due?
August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Oct 30, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
See your next three checks
Which Texas production tax rate applies?
The Texas Comptroller lists no approved exemption or reduced rate for this lease for August 2026, so the full 4.6% on oil applies.
Source: Texas Comptroller, approved severance tax exemptions.
Check the tax on your stub
Who buys the oil and gas?
Oil: Ptt Premier Trading and Tran LLC and True Oil Trucking & Mktg, LLC gather it. Gas from oil wells: Targa Midstream Services LLC buys and gathers it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
See every buyer and past buyers
How many 1099s should an owner expect for 2025?
Two companies filed this lease's reports behind 2025 checks: Bluebonnet Land & Cattle Co. and Stewart Construction. An owner paid by more than one of them gets a form from each. The operator is not always the company that pays, so go by the names on the stubs.
Source: Railroad Commission production reports, operator of record by month.
Check your 1099 against it

33 years of state records, 1993–2026

SHEPARD since 1993

We read every monthly report the Railroad Commission holds, back to January 1993, and this lease was already producing then. It filed 404 monthly reports through August 2026.

Sold since 1993

$1.9 million

What the whole lease’s oil and gas sold for at each month’s public prices, before tax and the operator’s deductions. A royalty owner’s share is their decimal of it.

A relative owned a share? See what it earned after they died
Oil sold
38,081 bbl
Gas sold
443 mcf
Best year
2013$140,000 sold
Last report
Aug 2026First: Jan 1993

Its best year was 2013: $140,000 of oil and gas sold

Each bar is what the lease’s oil and gas sold for that year, at that month’s prices. 2026 is only part of a year in the records, drawn lighter.

  • Oil
  • Gas
Its best year was 2013: $140,000 of oil and gas soldShepard: oil and gas sold each year from 1993 to 2026, at each month's prices. Its best year was 2013: $140,000 of oil and gas sold.Sold each year, at each month’s prices$0$50k$100k$150kPeak 2013: $141k'93'95'00'05'10'15'20'26
Its best year was 2013: $140,000 of oil and gas soldShepard: oil and gas sold each year from 1993 to 2026, at each month's prices. Its best year was 2013: $140,000 of oil and gas sold.Sold each year, at each month’s prices$0$50k$100k$150kPeak 2013: $141k'93'00'05'10'15'20'26

SourceTexas Railroad Commission Production Data Query, every monthly report since January 1993; EIA monthly WTI and Henry Hub prices (before 1997, EIA's yearly Texas natural gas wellhead price), through August 2026.

Every year as a table
Shepard: oil and gas sold each year
YearMonthsOil sold, bblGas sold, mcfSold for
2026 *83950$33,000
2025124370$29,220
2024127700$58,731
2023127880$62,074
2022127960$74,945
2021125670$38,981
2020127630$29,653
2019126380$35,652
2018127780$50,352
2017126860$34,812
2016127810$33,927
2015121,1190$55,038
2014121,0880$106,010
2013121,4290$140,939
2012121,1320$105,264
2011121,2130$114,351
2010121,3540$106,674
2009121,1450$68,782
2008121,1070$109,486
2007121,1890$86,074
2006121,1340$74,705
2005121,0230$57,770
2004121,0310$42,674
2003121,0080$31,345
2002121,0380$26,971
2001121,0930$28,350
2000121,1650$35,187
1999121,8220$33,928
1998121,5080$21,397
1997121,786120$37,772
1996122,1270$47,340
1995121,5770$29,030
1994121,3180$22,629
1993122,276323$42,853

* Part of the year: the records run through August 2026.

Where the gas went

No gas disposition reported for this lease

The operator has not reported where the gas went in the months we hold.

Who has run this lease

The operator changed once, most recently in Jul 2025

Operators of this lease over timeBluebonnet Land & Cattle Co., Jan 2020 to Jun 2025; Stewart Construction, Jul 2025 to Aug 20262020202120222023202420252026Changed Jul 2025Bluebonnet Land & Cattle Co.Jan 2020 to Jun 2025Stewart ConstructionJul 2025 to now
Operators of this lease over timeBluebonnet Land & Cattle Co., Jan 2020 to Jun 2025; Stewart Construction, Jul 2025 to Aug 20262020202120222023202420252026Changed Jul 2025Bluebonnet Land & Cattle Co.Jan 2020 to Jun 2025Stewart ConstructionJul 2025 to now

SourceTexas Railroad Commission Production Data Query, through Aug 2026.

5 wells on this lease

Wells on SHEPARD
API numberWellStatusCompleted
42-503-31841Shepard 2PluggedNov 23, 1976
42-503-31850Shepard 3ActiveJan 23, 1977
42-503-31851Shepard 4ActiveJan 12, 1977
42-503-39860Shepard 5ActiveOct 1, 1988
42-503-82328Shepard 1PluggedJan 12, 1984

2 of the 5 wells are marked plugged in the Railroad Commission's wellbore records. 3 are not plugged. A plugged well is closed for good. A well that is not plugged can be put back on production, and its operator still owes the plugging.

SourceTexas Railroad Commission production records and full wellbore file.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Ptt Premier Trading and Tran LLCOilGathers50Nov 1, 2025–
True Oil Trucking & Mktg, LLCOilGathers50Nov 1, 2025–
Targa Midstream Services LLCCasinghead gasBuys100Mar 1, 2017–
Targa Midstream Services LLCCasinghead gasGathers100Oct 1, 2011–
True Oil Trucking & Mktg, LLCOilGathers100Jan 1, 2018Nov 1, 2025

SourceRailroad Commission Form P-4 file, Oct 24, 2026 (source).

137 acres on the newest permit

Permits for Shepard
API numberWell no.Acreson the permit
42-503-398605137
42-503-318412–
42-503-318503–
42-503-318514–
42-503-823281–

SourceRailroad Commission drilling permits, Nov 14, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for SHEPARD
MonthOil producedbblOil soldbblWTI$/bblHenry Hub$/MMBtu
Aug 2026Stewart Construction3334$83.90$2.78
Jul 2026Stewart Construction4284$80.46$2.89
Jun 2026Stewart Construction440$84.81$3.15
May 2026Stewart Construction5252$102.13$2.94
Apr 2026Stewart Construction4362$100.32$2.77
Mar 2026Stewart Construction4550$91.38$3.04
Feb 2026Stewart Construction46113$64.51$3.62
Jan 2026Stewart Construction330$60.04$7.72
Dec 2025Stewart Construction470$57.97$4.26
Nov 2025Stewart Construction4677$60.06$3.79
Oct 2025Stewart Construction440$60.89$3.19
Sep 2025Stewart Construction17101$63.96$2.97
Aug 2025Stewart Construction30$64.86$2.91
Jul 2025Stewart Construction730$68.39$3.20
Jun 2025Bluebonnet Land40$68.17$3.02
May 2025Bluebonnet Land855$62.17$3.12
Apr 2025Bluebonnet Land420$63.54$3.42
Mar 2025Bluebonnet Land498$68.24$4.12
Feb 2025Bluebonnet Land700$71.53$4.19
Jan 2025Bluebonnet Land36106$75.74$4.13
Dec 2024Bluebonnet Land730$70.12$3.01
Nov 2024Bluebonnet Land3297$69.95$2.12
Oct 2024Bluebonnet Land7242$71.99$2.20
Sep 2024Bluebonnet Land38113$70.24$2.28
Aug 2024Bluebonnet Land970$76.68$1.99
Jul 2024Bluebonnet Land6296$81.80$2.07
Jun 2024Bluebonnet Land610$79.77$2.54
May 2024Bluebonnet Land36106$80.02$2.12
Apr 2024Bluebonnet Land480$85.35$1.60
Mar 2024Bluebonnet Land74171$81.28$1.49
Feb 2024Bluebonnet Land990$77.25$1.72
Jan 2024Bluebonnet Land89145$74.15$3.18
Dec 2023Bluebonnet Land520$71.90$2.52
Nov 2023Bluebonnet Land70148$77.69$2.71
Oct 2023Bluebonnet Land890$85.64$2.98
Sep 2023Bluebonnet Land8983$89.43$2.64

SourceTexas Railroad Commission Production Data Query, through Aug 2026. Prices: EIA.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Check my statement

Nearby

Stewart Construction in Young County

All Stewart Construction leases →

Kerlyn-Loving field

All leases in this field →

Leases within 10 km

Drilling permits within 10 km