Skip to content
A-257 · SEC. 11 · BLK 6 · T&P RR CO2A-257SEC. 11 · BLK 6 · T&P RR COSIKES-RANDALL · 80 ACRESN500 m32.6475° N 98.8494° W · PHOTO: U.S. GEOLOGICAL SURVEY

Texas gas wellRRC 7B-185535Last oil or gas reported May 2022

Sikes-Randall

One well on 80 acres in Stephens County. No oil or gas reported in the last 12 months, through September 2026. Reports are on file for all 12 months, with no oil and no gas.

Is your family on this lease?

Email me when this lease changesI own here

County
Stephens
On record since
August 2001
Newest report on file
September 2026
Unit on the newest permit
80 acres

Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.

What the checks found on this lease

  • Reports stopped. This lease no longer reports to the State. The part below says since when, and what to ask.
  • 52 silent months. June 2022 to September 2026.
  • 1 drop in production has no other record beside it in the same month.

Checked, nothing found: operator changes, buyers and new wells.

Not on file here, or only in part: price and tax and heat from space.

Royalty Watch tells you the month any of this changes on your own lease: a silent month, a drop, a new buyer or a well's next stage.Watch this lease

Eight things the public record says about this lease. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

No oil or gas reported in the 12 months through September 2026

Oil or gas was last reported for May 2022

Its whole life in the Railroad Commission's monthly reports, which start in January 1993; it first reported in August 2001. Royalty owners and their heirs can still be on the county roll after the checks stop.

  1. August 2001First report
  2. 2002The year it sold the most
  3. Daylight Petroleum LLCLast operator, from January 2020
  4. May 2022Last production
  5. 52 monthsNo oil or gas reported, June 2022 to September 2026
1

barrels of oil sold since August 2001.

84,018

thousand cubic feet of gas sold since August 2001.

$306,000

what it all sold for at each month's public prices, 100% of the lease.

SourceRailroad Commission production reports since January 1993 (oil and gas sold); EIA prices, through September 2026.

The story, from 301 monthly reports

On record since August 2001

Gas reported each month (sales where filed, otherwise production) since August 2001The numbers match the paragraphs below
200520102015202020251Aug 20012Jul 20033Jul 20164Aug 20195September 2026Aug 2001 onward

August 2001: the first month the lease sold gas on record, 1,259 thousand cubic feet.

July 2003 to April 2022: 226 months in a row with no oil and no gas reported.

July 2016: Avad Operating, LLC took over.

August 2019: Daylight Petroleum LLC took over from Avad Operating, LLC.

September 2026 is the newest monthly production report on file.

SourceRailroad Commission production reports, August 2001 through September 2026. Not a forecast, not reserves.

302 months against 7 other recordsNew

Every month since August 2001, and what else happened that month

The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.

Oct 2016
Nothing reported this month
Gas averaged $2.98 an mcf · Avad Operating, LLC
  • Nothing else on record this month.
SINCEAUG 20012005201020152020202500111MCF A MONTHLAST 12 MONTHS1WEATHERTHE STATEGAS PRICENEXT DOOROPERATORBUYERSTHE FIELDAvad Operating, LLCDaylight Petroleum LLC2017201820192020202120222023202420252026
One drop

Move the pointer or drag across the chart. The numbered buttons jump to each drop.

Monthly gas sold from this lease since August 2001, with eight record tracks beneath it. Use the left and right arrow keys to move month by month.. 302 months from August 2001 to September 2026. The most in one month: 5,671 mcf, January 2002. The newest month: 0 mcf. 279 months with nothing reported. Moments marked: 1, May 2002.

SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through September 2026.

302 months, one line eachNew

No production was reported from June 2022 through September 2026

A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.

52

months in a row with nothing reported, from June 2022 through September 2026. Reports are on file for all 52 months, with no oil and no gas.

1

barrels of oil on the newest report on file with oil or gas, for May 2022. The 52 reports on file after it, the newest for September 2026, show no oil and no gas.

24

of 302 months with oil or gas reported since August 2001.

August 2001Taller line, more gas soldSeptember 2026
20052010201520202025ENLARGED BELOW

A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.

SourceRailroad Commission production reports, August 2001 through September 2026. The months after May 2026 are counted from this lease's own reports filed since.

26 years of state records, 2001 to 2026

Sold since August 2001

$306,000

Only filed sales with a published price are included. Some sales figures or prices are unavailable.

Oil sold
1barrels
Gas sold
84,018thousand cubic feet
Sold each year, at that month's pricesOilGas
What the oil and gas from this lease sold for each year, 2001 to 2026, at each month's public prices.
YearOil, dollarsGas, dollarsTotal
2001$0$52,400$52,400
2002$0$138,000$138,000
2003$0$115,000 in priced filings$115,000 in priced filings
2004$0UnavailableUnavailable
2005$0UnavailableUnavailable
2006$0UnavailableUnavailable
2007$0UnavailableUnavailable
2008$0UnavailableUnavailable
2009$0UnavailableUnavailable
2010$0UnavailableUnavailable
2011$0UnavailableUnavailable
2012$0UnavailableUnavailable
2013$0UnavailableUnavailable
2014$0UnavailableUnavailable
2015$0UnavailableUnavailable
2016$0UnavailableUnavailable
2017$0UnavailableUnavailable
2018$0UnavailableUnavailable
2019$0UnavailableUnavailable
2020$0$0$0
2021$0$0$0
2022$110$0$110
2023$0$0$0
2024$0$0$0
2025$0$0$0
2026, 2026 so far$0$0$0

Did a relative own a share of this lease?

The bars show every year. Pick one to add up what the lease has sold since.

SourcesRailroad Commission Production Data Query, every monthly report since August 2001. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.

Who has run this lease

The operator changed three times, most recently in August 2019

The company named on each monthly report to the State. The operator is not always the company that pays.

  1. Daylight Petroleum LLCAugust 2019 to September 2026
  2. Avad Operating, LLCJuly 2016 to July 2019
  3. Operator number 834092July 2005 to June 2016
  4. Operator number 737140August 2001 to June 2005

A new operator sets up every owner again before it pays, and often sends a new division order. See what you may sign

SourcesRailroad Commission production reports, the operator on each month’s report, August 2001 through September 2026.

The newest well, seen from the side

No well on the way. Well 2 was completed in August 2001.

ground1,000 ft2,000 ft22,365 ft deep
  1. Permit filedNot on file
  2. Drilling startedNot on file
  3. FrackedNot on file
  4. Completion filedAugust 31, 2001
  5. First production on the leaseNot on file
  6. First checkNot on file

SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 17, 2026.

About 6 miles across

Wells on this lease and around it

1this lease, ringed
36producing
0fracked and waiting
0permits, last 24 months
12plugged
98original land surveys

For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/sikes-randall-7b-185535-g"><img src="https://royaltyclerk.com/maps/lease-wells/sikes-randall-7b-185535-g.svg" alt="Map of the Sikes-Randall lease in Stephens County, Texas: its well ringed, among 96 wells and 0 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/sikes-randall-7b-185535-g">Wells on the Sikes-Randall lease, Stephens County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

From the State's well records

One well on this lease

Wells on Sikes-Randall
WellAPI numberCompletedDepthfeetToday
242-429-35904August 20012,365Shut in

SourceRailroad Commission wellbore and completion records.

What the drilling permits say

80acres on the newest permit

80 ACRES
  • 80 acres, on the 2001 permits
Worth asking

A Rule 37 case is listed The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.

Check your decimal on this lease

Oil · last sale month, May 2022 New

Four prices for the same oil

Last sale May 2022. WTI $109.55 in May 2022, the last sale month.

$109.55
The marketEIA WTI, May 2022, the last sale month
not on file
Told its investorsNo comparable investor filing on file.
not on file yet
Told the tax officeTexas Comptroller, this lease
?
Your statementOnly you hold this one.

Texas Comptroller

Lower tax on record?

No lower tax approval appears on the Comptroller’s list for this lease.

EIA record dated October 1, 2026

Estimate your royalty

Type the decimal from your division order

The starting decimal is an example. Nothing you type here leaves this page.

$0a month

At these prices the whole lease’s reported sales were about $0 over 12 reported months. Your estimated share is $0 before taxes and deductions.

Monthly owner volumes and values
Estimated share before tax and deductions
MonthOil (bbl)Oil valueGas (mcf)Gas valueTotal
September 20260$0.000$0.00$0.00
August 20260$0.000$0.00$0.00
July 20260$0.000$0.00$0.00
June 20260$0.000$0.00$0.00
May 20260$0.000$0.00$0.00
April 20260$0.000$0.00$0.00
March 20260$0.000$0.00$0.00
February 20260$0.000$0.00$0.00
January 20260$0.000$0.00$0.00
December 20250$0.000$0.00$0.00
November 20250$0.000$0.00$0.00
October 20250$0.000$0.00$0.00

SourcesRailroad Commission monthly production, EIA WTI, SEC filings and Texas Comptroller records.

Watch Plus sets public prices beside the price on your statement.See Watch Plus

Who takes the oil and gasNew

No buyer shares an owner with the operator

The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.

GAS
Runs the leaseDaylight Petroleum LLCsince August 2019
Gathers and buys 100%HANLON GAS PROCESSING, LTD.since July 2016

No shared owner, officer or address on record between the gas buyers and the operator.

OIL
Runs the leaseDaylight Petroleum LLCsince August 2019
Gathers 100%ENERGY TRANSFER MARKETING & TERMsince December 2022

No shared owner, officer or address on record between the oil buyers and the operator.

Earlier buyers and gatherers, back to 1993
Earlier companies named on the Form P-4
CompanyProductRoleFromUntil
SUNOCO PTNRS. MKTG.&TERMINALS LPOilGathersJul 2005Dec 2022

SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.

Seen from space

Heat at the pad, beside reported gas use

A-257 · SEC. 11 · BLK 6 · T&P RR COONE SATELLITE PIXEL, ABOUT 375 M
DAYNIGHT

Satellite match

Not matched

No matched satellite record is on file for this pad.

—

nights of heat

0

months reporting flared or vented gas among 12 filed months, October 2025 to September 2026

—

months with heat and none reported

SourcesNOAA VIIRS night readings and Railroad Commission gas disposition reports. Satellite record through November 16, 2026.

Watch Plus checks statement months beside the satellite record.See Watch Plus

The county appraisal roll

Roll not on file

County mineral roll

Roll not on file

Stephens Appraisal District’s mineral roll has not been read here yet.

Royalty Clerk has mineral rolls for 166 Texas counties.

Source County appraisal district mineral rolls.

From the state record

Ask a question about Sikes-Randall

The available public records have no additional lease-specific answers as of November 29, 2026.

Every monthly report the State holds

302 months, newest first

Ledger for Sikes-Randall
MonthOil soldbarrelsGas soldthousand cubic feetFlared or ventedthousand cubic feetSold forat public pricesOperator
SeptemberSep 2026No oil or gas reportedDaylight Petroleum LLC
AugustAug 2026No oil or gas reportedDaylight Petroleum LLC
JulyJul 2026No oil or gas reportedDaylight Petroleum LLC
JuneJun 2026No oil or gas reportedDaylight Petroleum LLC
MayMay 2026No oil or gas reportedDaylight Petroleum LLC
AprilApr 2026No oil or gas reportedDaylight Petroleum LLC
MarchMar 2026No oil or gas reportedDaylight Petroleum LLC
FebruaryFeb 2026No oil or gas reportedDaylight Petroleum LLC
JanuaryJan 2026No oil or gas reportedDaylight Petroleum LLC
DecemberDec 2025No oil or gas reportedDaylight Petroleum LLC
NovemberNov 2025No oil or gas reportedDaylight Petroleum LLC
OctoberOct 2025No oil or gas reportedDaylight Petroleum LLC
SeptemberSep 2025No oil or gas reportedDaylight Petroleum LLC
AugustAug 2025No oil or gas reportedDaylight Petroleum LLC
JulyJul 2025No oil or gas reportedDaylight Petroleum LLC
JuneJun 2025No oil or gas reportedDaylight Petroleum LLC
MayMay 2025No oil or gas reportedDaylight Petroleum LLC
AprilApr 2025No oil or gas reportedDaylight Petroleum LLC

SourcesTexas Railroad Commission Production Data Query, through September 2026. Prices: EIA.

Do your checks match this lease?

Check my statement

Example

A whole month was never paid

The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.

Ask Operator B's owner relations: is that month held in suspense after the change of operator?

$2,277oil and gas

A sample finding, from our example check.

Around this lease

Nearby

Daylight Petroleum LLC in Stephens County

All Daylight Petroleum LLC leases

Stephens County Regular (Gas) field

All leases in this field

Leases within 10 km

Drilling permits within 10 km

  • AKIN-WRIGHT #2recompletion · S.b. Street Operating, Inc. · Jan 13, 2026 · 8.6 km
  • AKIN-WRIGHT #3recompletion · S.b. Street Operating, Inc. · Oct 23, 2025 · 9 km
  • SCARLETT 'C' #12recompletion · Ray Herring Operating Co., LLC · Aug 5, 2024 · 6.7 km

Same name in district 7B

Where it sits

This county

Stephens CountyStephensShackelfordJackPalo PintoEastlandThrockmortonYoungStephens County
Stephens County

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells
  • U.S. Energy Information Administration prices
  • NOAA storms and cold
  • U.S. Geological Survey photos

How this page is made

Our software builds this page from the public records above. Every figure on it is computed from them, and the page is rebuilt when a source publishes a new month or a new roll. Where the page has a written summary, our software writes it from the page's own figures, and it is checked against them before it goes up. Royalty Clerk is run by AGI Solutions LLC; no operator pays for a page or sees one first.