Skip to content

Texas oil lease · RRC district 06 · Lease 13233

Producing

SLACK

Slack is an oil lease in Rusk County, Texas, operated by Faulconer Energy, LLC in the Oak Hill, West (Pettit) field. The Railroad Commission shows 4,203 bbl of oil in the 12 months through Jul 2026.

Oil lease dossier · 5 wells

4,203bbl oil, last 12 months+14% vs prior year
RRC lease
06-13233

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Rusk CountyRuskPanolaGreggUpshurShelbySmithHarrisonCherokeeRusk County
Rusk County · RRC district 06Open Rusk County →
Gas, last 12 months
67,344 mcf
Oil in Jul 2026
456 bbl
Reporting to the state
since Jan 2020
Wells
5

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Oil output rose 14% over the last 12 months

4,203 bbl in the 12 months through Jul 2026, against 3,702 bbl in the 12 months before.

  • Oil (bars, left axis)
  • Gas (line, right axis)
  • Last 12 months
Oil output rose 14% over the last 12 monthsMonthly oil production and gas for SLACK, Aug 2023 to Jul 2026. Oil output rose 14% over the last 12 months. 4,203 bbl in the 12 months through Jul 2026, against 3,702 bbl in the 12 months before.Last 12 months: 4,203 bblbbl per monthmcf per month002002,5004005,0006007,50080010kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output rose 14% over the last 12 monthsMonthly oil production and gas for SLACK, Aug 2023 to Jul 2026. Oil output rose 14% over the last 12 months. 4,203 bbl in the 12 months through Jul 2026, against 3,702 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month002002,5004005,0006007,50080010kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, oil lease 13233, district 06. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

98% of the gas went to a transmission line in the last 12 months

Each bar is one month. Colors are the disposition codes the operator reported.

  • Transmission line (2)
  • Lease fuel (1)
98% of the gas went to a transmission line in the last 12 monthsShare of SLACK gas by disposition code each month, Aug 2023 to Jul 2026. 98% of the gas went to a transmission line in the last 12 months. Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
98% of the gas went to a transmission line in the last 12 monthsShare of SLACK gas by disposition code each month, Aug 2023 to Jul 2026. 98% of the gas went to a transmission line in the last 12 months. Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 13233, district 06. Reported through Jul 2026.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

Lease fuel (1)

Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed once, most recently in Apr 2023

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeXTO Energy Inc., Jan 2020 to Mar 2023; Faulconer Energy, LLC, Apr 2023 to Jul 20262020202120222023202420252026Changed Apr 2023XTO Energy Inc.Jan 2020 to Mar 2023Faulconer Energy, LLCApr 2023 to now
Operators of this lease over timeXTO Energy Inc., Jan 2020 to Mar 2023; Faulconer Energy, LLC, Apr 2023 to Jul 20262020202120222023202420252026Changed Apr 2023XTO Energy Inc.Jan 2020 to Mar 2023Faulconer Energy, LLCApr 2023 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

5 wells on this lease

Every well the Railroad Commission links to oil lease 13233 in district 06. The API number is the state’s ID for a well.
Wells on SLACK
API numberWell no.Status
42-401-324501Shut-in
42-401-324582Active
42-401-324644Active
42-401-324653Active
42-401-324985Active

SourceTexas Railroad Commission Wellbore Query, district 06, lease 13233.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Oil

    Eastex Crude Company, LLC gathers it.

    100% of it, on the list since Jan 1, 2023

  • Gas from oil wells

    Vmh Gas, LLC buys and gathers it.

    Vmh Gas, LLC buys it: 100% of it, on the list since Mar 1, 2025 · Vmh Gas, LLC gathers it: 100% of it, on the list since Mar 1, 2025

Companies that used to be listed: Fuels Cotton Valley Gath, LLC (gathers it, until Mar 1, 2025); Dcp Midstream Marketing, LLC (buys it, until Mar 1, 2025); Xto Energy Inc. (gathers it, until Jun 1, 2024); Xto Energy Inc. (buys it, until Jun 1, 2024); Kinder Morgan Tejas Pipeline LLC (gathers it, until Jan 1, 2023); Eastex Crude Company (gathers it, until Jan 1, 2023).

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

1,077.56 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
52 not plugged
Horizontal
0
First completion
Apr 18, 1993
Latest permit
Nov 9, 1993

The wells on this lease state different acreage

The permits state between 40 and 1,077.56 acres. Use the acres from your own division order for the well you are paid on.

Wells and acres on the permits for Slack
API numberWell no.Acreson the permit
42-401-3249851,077.56
42-401-32464440
42-401-3246531,077.56
42-401-3245821,077.56
42-401-3245011,077.56

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says SLACK sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for SLACK
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Faulconer Energy,4563816,3106,1710$80.46$2.89
Jun 2026Faulconer Energy,2273534,4734,3590$84.81$3.15
May 2026Faulconer Energy,3142165,0614,9350$102.13$2.94
Apr 2026Faulconer Energy,4415566,6436,4810$100.32$2.77
Mar 2026Faulconer Energy,1761893,5333,4480$91.38$3.04
Feb 2026Faulconer Energy,3363615,6375,5230$64.51$3.62
Jan 2026Faulconer Energy,2741815,9065,7730$60.04$7.72
Dec 2025Faulconer Energy,3823645,9465,8070$57.97$4.26
Nov 2025Faulconer Energy,3143575,4915,3660$60.06$3.79
Oct 2025Faulconer Energy,3523515,9585,8260$60.89$3.19
Sep 2025Faulconer Energy,4023455,9415,8080$63.96$2.97
Aug 2025Faulconer Energy,5297076,4456,3000$64.86$2.91
Jul 2025Faulconer Energy,4823496,4546,3120$68.39$3.20
Jun 2025Faulconer Energy,4115216,5536,4050$68.17$3.02
May 2025Faulconer Energy,4263368,3608,1880$62.17$3.12
Apr 2025Faulconer Energy,12503,7123,6480$63.54$3.42
Mar 2025Faulconer Energy,7903,2242,9680$68.24$4.12
Feb 2025Faulconer Energy,551772,9022,6790$71.53$4.19
Jan 2025Faulconer Energy,3483336,9316,4000$75.74$4.13
Dec 2024Faulconer Energy,3203466,7216,7210$70.12$3.01
Nov 2024Faulconer Energy,3703516,6336,6330$69.95$2.12
Oct 2024Faulconer Energy,3885207,2297,2290$71.99$2.20
Sep 2024Faulconer Energy,3481626,3456,3450$70.24$2.28
Aug 2024Faulconer Energy,3505077,3517,0070$76.68$1.99
Jul 2024Faulconer Energy,2291685,5075,2090$81.80$2.07
Jun 2024Faulconer Energy,771822,8272,7480$79.77$2.54
May 2024Faulconer Energy,4403356,9286,3640$80.02$2.12
Apr 2024Faulconer Energy,4755236,8996,3750$85.35$1.60
Mar 2024Faulconer Energy,4434886,7426,2670$81.28$1.49
Feb 2024Faulconer Energy,4743956,1815,7320$77.25$1.72
Jan 2024Faulconer Energy,3893435,6135,1560$74.15$3.18
Dec 2023Faulconer Energy,5334946,1875,7020$71.90$2.52
Nov 2023Faulconer Energy,5656945,6105,1740$77.69$2.71
Oct 2023Faulconer Energy,5625045,2654,8740$85.64$2.98
Sep 2023Faulconer Energy,5525105,2984,9140$89.43$2.64
Aug 2023Faulconer Energy,3995165,4945,1180$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for SLACK. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Faulconer Energy, LLC.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Faulconer Energy, LLC in Rusk County

All Faulconer Energy, LLC leases →

Oak Hill, West (Pettit) field

No other producing leases in this field are in our data yet.

Leases within 10 km

Found by the location of their wells.

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 13233, district 06, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.