Skip to content

Texas oil lease

Stopped

SMITH

Smith is an oil lease in Ochiltree County, Texas, in the Haywood (Atoka) field. It stopped producing after July 2016: nothing has been reported for 10 years 1 month since. Capturepoint LLC was its last operator.

This lease has stopped

Jul 2016last month with oil or gas

Nothing reported for 10 years 1 month since, through Aug 2026.

Last operator
Capturepoint LLC
RRC lease
10-07292

Is your family on this lease?

Email me when this lease changes

Where it sits

This county

Ochiltree CountyOchiltreeHansfordLipscombOchiltree County
Ochiltree County
Silent for
10 years 1 month
First report
Oct 1998
Stopped producing after July 2016

Smith, 1998–2026

Its whole life in the Railroad Commission’s monthly reports, which start in January 1993; it first reported in October 1998. Royalty owners and their heirs can still be on the county roll after the checks stop.

What its oil and gas sold for each year since October 1998$ a year, at each month's pricessilent
Smith: what its oil and gas sold for each year, 1998 to 2026Smith: what its oil and gas sold for each year, 1998 to 2026. The best year was 2011, with $85,000 sold. It stopped producing after July 2016; nothing since, through August 2026.SILENT10 YR 1 MOBest year 2011 · $85.9kLast production Jul 201619982002200620102014201820222026
Smith: what its oil and gas sold for each year, 1998 to 2026Smith: what its oil and gas sold for each year, 1998 to 2026. The best year was 2011, with $85,000 sold. It stopped producing after July 2016; nothing since, through August 2026.SILENT10 YR 1 MOBest year 2011 · $85.9kLast production Jul 20161998200620142022
  1. First reportOct 1998
  2. Best year2011$85,000 sold
  3. Last operatorCapturepoint LLCfrom Nov 2021
  4. Last productionJul 2016
  5. Silent for10 years 1 monththrough Aug 2026
Oil sold since October 1998
4,675barrels
Gas sold since October 1998
30,664thousand cubic feet (mcf)
Sold for, in all
$339,000at each month's public prices, 100% of the lease

Source: Texas Railroad Commission production reports since January 1993 (oil and gas sold); EIA prices, through August 2026.

Every year as a table
Smith: oil and gas sold each year
YearMonthsOil sold, bblGas sold, mcfSold for
2026 *800$0
20251200$0
20241200$0
20231200$0
20221200$0
20211200$0
20201200$0
20191200$0
20181200$0
20171200$0
2016121900$8,484
20151200$0
20141201,334$5,996
2013121741,856$23,598
2012121891,985$22,331
2011127543,210$85,880
20101202$12
2009123421,636$25,282
2008125292,057$56,926
20071200$0
20061200$0
20051201,681$17,314
20041200$0
20031200$0
20021200$0
200112172876$10,208
2000123883,738$26,938
1999121,2017,310$36,563
199837364,979$20,032

* Part of the year: the records run through August 2026.

For families and heirs

What an heir can do next

  1. Search the family name

    Type the name from an old check stub, a deed or the will. We search every county roll we hold and the state's records.

    Search a name
  2. See why the checks stopped

    Checks stop when a lease stops, when the operator changes, or when an account goes into suspense. See which one the state's records point to.

    Check this lease
  3. Value an inherited share

    A relative owned a share? See what it earned after they died, month by month, from the state's records.

    Start with the estate
  4. Hear if it starts again

    Stopped leases are sometimes reworked or taken over by a new operator. Get an email when this one reports again.

    Email me if it restarts

Did a relative own a share of this lease?

Pick the year they passed and see what the lease has sold since.

Other leases named Smith

22 leases share this name in district 10. The Railroad Commission gives each gas well its own number and each oil lease another, so one unit often shows up as several of these.
Show 13 more

Production by month

No production to chart

The state shows zero oil and zero gas for all 36 months we hold (Sep 2023 to Aug 2026). A lease that is shut in or newly reported looks like this. The ledger below lists each month. Its whole life is charted at the top of the page.

Where the gas went

No gas disposition reported for this lease

The operator has not reported where the gas went in the months we hold.

Who has run this lease

The operator changed 2 times, most recently in Nov 2021

Operators of this lease over timeTabula Rasa Energy, LLC, Jan 2020 to Jun 2020; Perdure Petroleum LLC, Jul 2020 to Oct 2021; Capturepoint LLC, Nov 2021 to Aug 20262020202120222023202420252026Changed Jul 2020Changed Nov 2021Tabula Rasa Energy, LLCJan 2020 to Jun 2020Perdure Petroleum LLCJul 2020 to Oct 2021Capturepoint LLCNov 2021 to now
Operators of this lease over timeTabula Rasa Energy, LLC, Jan 2020 to Jun 2020; Perdure Petroleum LLC, Jul 2020 to Oct 2021; Capturepoint LLC, Nov 2021 to Aug 20262020202120222023202420252026Changed Jul 2020Changed Nov 2021Tabula Rasa Energy, LLCJan 2020 to Jun 2020Perdure Petroleum LLCJul 2020 to Oct 2021Capturepoint LLCNov 2021 to now

SourceTexas Railroad Commission Production Data Query, through Aug 2026.

Wells on this lease

No wells are linked to this lease in our data

Production is still reported at lease level.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%From
Cp Energy, L.l.c.OilGathers100Feb 1, 2015
Dcp Operating Company, LPCasinghead gasBuys100Apr 1, 2017
Dcp Operating Company, LPCasinghead gasGathers100Apr 1, 2017

SourceRailroad Commission Form P-4 file, Oct 24, 2026 (source).

640 acres on the newest permit

Permits for Smith
API numberWell no.Acreson the permit
42-357-0096021640
42-357-3011166640

SourceRailroad Commission drilling permits, Oct 31, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for SMITH
MonthOil producedbblOil soldbblWTI$/bblHenry Hub$/MMBtu
Aug 2026Capturepoint LLC00$83.90$2.78
Jul 2026Capturepoint LLC00$80.46$2.89
Jun 2026Capturepoint LLC00$84.81$3.15
May 2026Capturepoint LLC00$102.13$2.94
Apr 2026Capturepoint LLC00$100.32$2.77
Mar 2026Capturepoint LLC00$91.38$3.04
Feb 2026Capturepoint LLC00$64.51$3.62
Jan 2026Capturepoint LLC00$60.04$7.72
Dec 2025Capturepoint LLC00$57.97$4.26
Nov 2025Capturepoint LLC00$60.06$3.79
Oct 2025Capturepoint LLC00$60.89$3.19
Sep 2025Capturepoint LLC00$63.96$2.97
Aug 2025Capturepoint LLC00$64.86$2.91
Jul 2025Capturepoint LLC00$68.39$3.20
Jun 2025Capturepoint LLC00$68.17$3.02
May 2025Capturepoint LLC00$62.17$3.12
Apr 2025Capturepoint LLC00$63.54$3.42
Mar 2025Capturepoint LLC00$68.24$4.12
Feb 2025Capturepoint LLC00$71.53$4.19
Jan 2025Capturepoint LLC00$75.74$4.13
Dec 2024Capturepoint LLC00$70.12$3.01
Nov 2024Capturepoint LLC00$69.95$2.12
Oct 2024Capturepoint LLC00$71.99$2.20
Sep 2024Capturepoint LLC00$70.24$2.28
Aug 2024Capturepoint LLC00$76.68$1.99
Jul 2024Capturepoint LLC00$81.80$2.07
Jun 2024Capturepoint LLC00$79.77$2.54
May 2024Capturepoint LLC00$80.02$2.12
Apr 2024Capturepoint LLC00$85.35$1.60
Mar 2024Capturepoint LLC00$81.28$1.49
Feb 2024Capturepoint LLC00$77.25$1.72
Jan 2024Capturepoint LLC00$74.15$3.18
Dec 2023Capturepoint LLC00$71.90$2.52
Nov 2023Capturepoint LLC00$77.69$2.71
Oct 2023Capturepoint LLC00$85.64$2.98
Sep 2023Capturepoint LLC00$89.43$2.64

SourceTexas Railroad Commission Production Data Query, through Aug 2026. Prices: EIA, through Oct 2026. Updated Oct 30, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Check my statement

Nearby

Haywood (Atoka) field

All leases in this field →

New drilling permits in Ochiltree County

Newest in the county: this lease has no coordinates.