Where the state's map puts this lease's 16 wells, and what has been drilled or permitted within about 2 miles of them.
This lease16Its wells, ringed on the map: all producing
Drilling locations0Permits issued in the last two years
Producing wells131On a lease reporting production now
Not producing23Shut in, inactive or no lease on record
Plugged18The state's wellbore record says plugged
The 16 ringed dots are this lease's wells, each where the Railroad Commission's map puts it. The other dots are wells and drilling permits of the last 24 months on the land around it; the counts are for everything in the picture, which is about 7 miles across. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines, base map from USGS The National Map.
A one-page map of this lease to print, for a lawyer, a buyer or a probate file.
Use this map on your site
You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.
<a href="https://royaltyclerk.com/texas/leases/sneed-10-05784"><img src="https://royaltyclerk.com/maps/lease-wells/sneed-10-05784.svg" alt="Map of the Sneed lease in Moore County, Texas: its 16 wells ringed, among 172 wells and 0 recent drilling locations in a picture about 7 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/sneed-10-05784">Wells on the Sneed lease, Moore County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>
Other leases named Sneed
65 leases share this name in district 10; the 60 most active are below. The Railroad Commission gives each gas well its own number and each oil lease another, so one unit often shows up as several of these.
59 leases in Moore County in the same field or with the same operator carry the Sneed name; the 12 most active are below. Operators often name the leases on one family's land alike, with a letter or unit number after the name. Sharing a name proves no tie: your division order says which ones pay you.
Oil output rose 889% over the last 12 monthsMonthly oil production and gas for SNEED, Sep 2023 to Aug 2026. Oil output rose 889% over the last 12 months. 1,751 bbl in the 12 months through Aug 2026, against 177 bbl in the 12 months before.Last 12 months: 1,751 bblbbl per monthmcf per month001001,0002002,0003003,0004004,0005005,000Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output rose 889% over the last 12 monthsMonthly oil production and gas for SNEED, Sep 2023 to Aug 2026. Oil output rose 889% over the last 12 months. 1,751 bbl in the 12 months through Aug 2026, against 177 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month001001,0002002,0003003,0004004,0005005,000Jan 24JulJan 25JulJan 26Jul
SourceTexas Railroad Commission Production Data Query, through Aug 2026.
From the state record
What owners ask about Sneed
01When is the check for August 2026 due?
August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Oct 30, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
The Texas Comptroller lists low producing leases for this lease, from Feb 1, 2016. Its file does not give the rate, so we compare your stub with the full 4.6%. That is for August 2026.
Oil: Valero Marketing and Supply Co. gathers it. Gas from oil wells: Dcp Operating Company, LP buys and gathers it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
One company, Scout Energy Management LLC, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
Source: Railroad Commission production reports, operator of record by month.
We read every monthly report the Railroad Commission holds, back to January 1993, and this lease was already producing then. It filed 404 monthly reports through August 2026.
Sold since 1993
$15.3 million
What the whole lease’s oil and gas sold for at each month’s public prices, before tax and the operator’s deductions. A royalty owner’s share is their decimal of it.
Its best year was 2008: $1.2 million of oil and gas sold
Each bar is what the lease’s oil and gas sold for that year, at that month’s prices. 2026 is only part of a year in the records, drawn lighter.
Oil
Gas
Its best year was 2008: $1.2 million of oil and gas soldSneed: oil and gas sold each year from 1993 to 2026, at each month's prices. Its best year was 2008: $1.2 million of oil and gas sold.Sold each year, at each month’s prices$0$500k$1M$1.5MPeak 2008: $1.3M'93'95'00'05'10'15'20'26
Its best year was 2008: $1.2 million of oil and gas soldSneed: oil and gas sold each year from 1993 to 2026, at each month's prices. Its best year was 2008: $1.2 million of oil and gas sold.Sold each year, at each month’s prices$0$500k$1M$1.5MPeak 2008: $1.3M'93'00'05'10'15'20'26
SourceTexas Railroad Commission Production Data Query, every monthly report since January 1993; EIA monthly WTI and Henry Hub prices (before 1997, EIA's yearly Texas natural gas wellhead price), through August 2026.
Every year as a table
Sneed: oil and gas sold each year
Year
Months
Oil sold, bbl
Gas sold, mcf
Sold for
2026 *
8
1,534
12,483
$191,745
2025
12
335
35,594
$145,188
2024
12
324
41,392
$116,589
2023
12
604
41,417
$151,955
2022
12
961
34,671
$317,492
2021
12
1,608
37,264
$266,921
2020
12
2,138
22,464
$123,586
2019
12
2,868
12,108
$199,461
2018
12
2,962
46,153
$338,550
2017
12
2,364
50,901
$271,775
2016
12
2,654
54,608
$255,349
2015
12
2,870
66,978
$316,469
2014
12
3,196
72,519
$617,594
2013
12
3,009
71,487
$563,365
2012
12
3,967
69,594
$567,656
2011
12
3,965
57,032
$604,221
2010
12
5,305
59,061
$681,249
2009
12
6,905
80,033
$727,043
2008
12
5,074
84,775
$1,282,173
2007
12
4,216
79,617
$854,246
2006
12
3,792
84,911
$820,185
2005
12
4,386
71,179
$868,051
2004
12
5,113
79,112
$671,761
2003
12
4,824
96,089
$667,022
2002
12
4,352
88,577
$409,464
2001
12
4,522
83,574
$431,963
2000
12
5,047
63,967
$441,275
1999
12
6,653
73,329
$291,838
1998
12
7,504
89,176
$296,754
1997
12
8,019
68,374
$335,396
1996
12
7,843
77,764
$353,382
1995
12
7,873
111,281
$324,556
1994
12
8,755
143,420
$421,311
1993
12
7,345
157,477
$465,092
* Part of the year: the records run through August 2026.
Where the gas went
All of the gas went to a transmission line in the last 12 months
All of the gas went to a transmission line in the last 12 monthsShare of SNEED gas by disposition code each month, Sep 2023 to Aug 2026. All of the gas went to a transmission line in the last 12 months.Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
All of the gas went to a transmission line in the last 12 monthsShare of SNEED gas by disposition code each month, Sep 2023 to Aug 2026. All of the gas went to a transmission line in the last 12 months.Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul
SourceTexas Railroad Commission Production Data Query, through Aug 2026.
Who has run this lease
The operator changed once, most recently in May 2026
Operators of this lease over timeScout Energy Management LLC, Jan 2020 to Apr 2026; Burk Royalty Co., Ltd., May 2026 to Aug 20262020202120222023202420252026Changed May 2026Scout Energy Management LLCJan 2020 to Apr 2026Burk Royalty Co., Ltd.May 2026 to now
Operators of this lease over timeScout Energy Management LLC, Jan 2020 to Apr 2026; Burk Royalty Co., Ltd., May 2026 to Aug 20262020202120222023202420252026Changed May 2026Scout Energy Management LLCJan 2020 to Apr 2026Burk Royalty Co., Ltd.May 2026 to now
The permits state between 80 and 560 acres. Use the acres from your own division order for the well you are paid on.
Good to know
16 well completions are on file for this lease
The count is of completions in the wellbore records, so a well completed more than once is counted each time. Each well can have its own unit. The decimal for one well does not have to equal the decimal for another.