Texas oil lease
ProducingSUGG 0807
Sugg 0807 is an oil lease in Irion County, Texas, operated by Apache Corporation in the Lin (Wolfcamp) field.
5 wells
- Operator
- Apache Corporation
- County
- Irion County
- Field
- Lin (Wolfcamp)
- RRC lease
- 7C-18432
Is your family on this lease?
Where it sits
This county
- Gas, last 12 months
- 472,989 mcf
- Oil in Aug 2026
- 374 bbl
Did a relative own a share of this lease?
Pick the year they passed and see what the lease has sold since.
Checks stopped on this lease?
- Buyer
Buyer changed: CANES MIDSTREAM G&P LLC replaced COGENT MIDSTREAM WESTEX, LLC as the buyer of this lease's gas from oil wells on Dec 1, 2024.
SourceRailroad Commission production, P-5 and P-4 records, data through Aug 2026.
See why checks stop on this leaseWells on this lease and around it
- This lease5Its wells, ringed on the map: all producing
- Drilling locations1Permits issued in the last two years
- Producing wells55On a lease reporting production now
- Not producing31Shut in, inactive or no lease on record
- Plugged2The state's wellbore record says plugged
The 5 ringed dots are this lease's wells, each where the Railroad Commission's map puts it. The other dots are wells and drilling permits of the last 24 months on the land around it; the counts are for everything in the picture, which is about 6 miles across. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines, base map from USGS The National Map.
A one-page map of this lease to print, for a lawyer, a buyer or a probate file.
Use this map on your site
You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.
<a href="https://royaltyclerk.com/texas/leases/sugg-0807-7c-18432"><img src="https://royaltyclerk.com/maps/lease-wells/sugg-0807-7c-18432.svg" alt="Map of the Sugg 0807 lease in Irion County, Texas: its 5 wells ringed, among 88 wells and 1 recent drilling location in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/sugg-0807-7c-18432">Wells on the Sugg 0807 lease, Irion County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>Other Sugg leases in Irion County
- Sugg 4948 · 7C-18150, oil leaseProducing21,505 bbllast 12 reported months
- Sugg 2829 · 7C-18171, oil leaseProducing13,746 bbllast 12 reported months
- Sugg 0607 · 7C-18247, oil leaseProducing10,319 bbllast 12 reported months
- Sugg 13 · 7C-18385, oil leaseShut in0 bbllast 12 reported months
- Sugg "33" · 7C-13879, oil leaseShut in0 bbllast 12 reported months
- Sugg "35" · 7C-14727, oil leaseShut in0 bbllast 12 reported months
- Sugg "A" · 7C-12720, oil leaseShut in0 bbllast 12 reported months
Production by month
Oil output fell 6% over the last 12 months
- Oil (bars)
- Gas (line)
- Last 12 months
SourceTexas Railroad Commission Production Data Query, through Aug 2026.
From the state record
What owners ask about Sugg 0807
- When is the check for August 2026 due?
- August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Oct 30, 2026 and the gas by Nov 29, 2026, unless the lease sets another time.
- Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
- See your next three checks
- Which Texas production tax rate applies?
- The Texas Comptroller lists low producing leases for this lease, from May 1, 2020. Its file does not give the rate, so we compare your stub with the full 4.6%. That is for August 2026.
- Source: Texas Comptroller, approved severance tax exemptions.
- Check the tax on your stub
- Who buys the oil and gas?
- Oil: Canes Midstream Logistics LLC and Oasis Transp & Marketing Corp. gather it. Gas from oil wells: Canes Midstream G&p LLC buys and gathers it. The buyer's price is what a royalty check is figured on.
- Source: Railroad Commission Form P-4, gatherers and purchasers.
- See every buyer and past buyers
- How many 1099s should an owner expect for 2025?
- One company, Apache Corporation, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
- Source: Railroad Commission production reports, operator of record by month.
- Check your 1099 against it
Free tools, already on this lease
Ask a question about Sugg 0807
33 years of state records, 1993–2026
SUGG 0807 since 2014
We read every monthly report the Railroad Commission holds, back to January 1993. This lease first reported in March 2014. It filed 150 monthly reports through August 2026.
Sold since 2014
$50.6 million
What the whole lease’s oil and gas sold for at each month’s public prices, before tax and the operator’s deductions. A royalty owner’s share is their decimal of it.
- Oil sold
- 489,818 bbl
- Gas sold
- 6,938,018 mcf
- Best year
- 2014$10.6 million sold
- Last report
- Aug 2026First: Mar 2014
Its best year was 2014: $10.6 million of oil and gas sold
Each bar is what the lease’s oil and gas sold for that year, at that month’s prices. 2026 is only part of a year in the records, drawn lighter.
- Oil
- Gas
SourceTexas Railroad Commission Production Data Query, every monthly report since January 1993; EIA monthly WTI and Henry Hub prices (before 1997, EIA's yearly Texas natural gas wellhead price), through August 2026.
Every year as a table
| Year | Months | Oil sold, bbl | Gas sold, mcf | Sold for |
|---|---|---|---|---|
| 2026 * | 8 | 3,604 | 328,006 | $1,461,158 |
| 2025 | 12 | 5,869 | 437,299 | $1,926,547 |
| 2024 | 12 | 6,498 | 470,434 | $1,536,811 |
| 2023 | 12 | 8,469 | 542,653 | $2,022,286 |
| 2022 | 12 | 10,081 | 485,665 | $4,152,322 |
| 2021 | 12 | 10,832 | 533,314 | $2,783,620 |
| 2020 | 12 | 16,056 | 603,685 | $1,851,865 |
| 2019 | 12 | 20,811 | 579,419 | $2,672,784 |
| 2018 | 12 | 29,346 | 688,616 | $4,081,564 |
| 2017 | 12 | 46,385 | 766,193 | $4,643,551 |
| 2016 | 12 | 137,176 | 901,613 | $7,659,945 |
| 2015 | 12 | 87,892 | 360,282 | $5,217,337 |
| 2014 | 10 | 106,799 | 240,839 | $10,630,815 |
* Part of the year: the records run through August 2026.
Where the gas went
Over 99% of the gas went to a processing plant in the last 12 months
- Processing plant (3)
- Flared (4)
SourceTexas Railroad Commission Production Data Query, through Aug 2026.
Processing plant (3)
100% · 472,222 mcf
Flared (4)
0.2% · 767 mcf
0.2% of the gas flared in the last 12 months. No month above 3%.
5 wells on this lease
| API number | Well | Status | Completed |
|---|---|---|---|
| 42-235-35227 | Sugg 0807 H 11 | Active | Jul 2, 2013 |
| 42-235-35861 | Sugg 0807 H 13M | Active | Aug 16, 2014 |
| 42-235-35864 | Sugg 0807 H 31U | Active | Jan 22, 2015 |
| 42-235-35866 | Sugg 0807 H 41U | Active | Jan 27, 2015 |
| 42-235-35869 | Sugg 0807 H 21U | Active | Dec 30, 2014 |
SourceTexas Railroad Commission production records and full wellbore file.
Buyers and gatherers
| Company | Product | Role | Share% | From | Until |
|---|---|---|---|---|---|
| Canes Midstream Logistics LLC | Oil | Gathers | 50 | Jul 1, 2025 | – |
| Oasis Transp & Marketing Corp. | Oil | Gathers | 50 | Jul 1, 2025 | – |
| Canes Midstream G&p LLC | Casinghead gas | Buys | 100 | Dec 1, 2024 | – |
| Canes Midstream G&p LLC | Casinghead gas | Gathers | 100 | Dec 1, 2024 | – |
| Oasis Transp & Marketing Corp. | Oil | Gathers | 100 | Feb 1, 2022 | Jul 1, 2025 |
| Cogent Midstream Westex, LLC | Casinghead gas | Gathers | 100 | Jul 1, 2019 | Dec 1, 2024 |
| Cogent Midstream Westex, LLC | Casinghead gas | Buys | 100 | Jul 1, 2019 | Dec 1, 2024 |
| Cogent Midstream Logistics, LLC | Oil | Gathers | 100 | Jul 1, 2019 | Feb 1, 2022 |
| Lucid Energy Westex, LLC | Casinghead gas | Gathers | 100 | Jul 2, 2013 | Jul 1, 2019 |
| Lucid Energy Westex, LLC | Casinghead gas | Buys | 100 | Jul 2, 2013 | Jul 1, 2019 |
SourceRailroad Commission Form P-4 file, Oct 24, 2026 (source).
966.40 acres on the newest permit
- Good to know
The wells on this lease state different acreage
The permits state between 960 and 966.4 acres. Use the acres from your own division order for the well you are paid on.
| API number | Well no. | Permit issued | Completed | Acreson the permit |
|---|---|---|---|---|
| 42-235-35864 | H 31U | Jun 28, 2014 | Jan 22, 2015 | 966.40 |
| 42-235-35866 | H 41U | Jun 28, 2014 | Jan 27, 2015 | 966.40 |
| 42-235-35869 | H 21U | Jun 28, 2014 | Dec 30, 2014 | 966.40 |
| 42-235-35861 | H 13M | May 23, 2014 | Aug 16, 2014 | 966.40 |
| 42-235-35227 | H 11 | Dec 14, 2012 | Jul 2, 2013 | 960 |
What APA Corporation told investors it received
| Quarter | Oil$ per bbl | Gas$ per mcf | Gas liquids$ per bbl | Filing |
|---|---|---|---|---|
| Q3 2026 | $92.02 | $2.87 | $26.17 | SEC filing |
| Q2 2026 | $98.24 | $0.60 | $25.41 | SEC filing |
| Q1 2026 | $78.69 | $2.12 | $20.96 | SEC filing |
| Q4 2025 | $61.03 | $2.10 | $20.95 | SEC filing |
| Q3 2025 | $67.43 | $2.25 | $20.65 | SEC filing |
| Q2 2025 | $65.58 | $2.28 | $20.49 | SEC filing |
SourceAPA Corporation quarterly reports, SEC EDGAR, company-wide averages before hedging.
Estimate your royalty
36 months, newest first
| Month | Oil producedbbl | Oil soldbbl | Gas producedmcf | Gas soldmcf, codes 2+3 | Flaredmcf | WTI$/bbl | Henry Hub$/MMBtu |
|---|---|---|---|---|---|---|---|
| Aug 2026 | 374 | 337 | 36,440 | 36,431 | 9 | $83.90 | $2.78 |
| Jul 2026 | 344 | 456 | 35,671 | 35,671 | 0 | $80.46 | $2.89 |
| Jun 2026 | 418 | 423 | 36,006 | 36,006 | 0 | $84.81 | $3.15 |
| May 2026 | 457 | 467 | 41,744 | 41,744 | 0 | $102.13 | $2.94 |
| Apr 2026 | 438 | 398 | 36,365 | 36,365 | 0 | $100.32 | $2.77 |
| Mar 2026 | 511 | 561 | 73,144 | 72,453 | 691 | $91.38 | $3.04 |
| Feb 2026 | 495 | 392 | 32,891 | 32,891 | 0 | $64.51 | $3.62 |
| Jan 2026 | 543 | 570 | 36,446 | 36,445 | 1 | $60.04 | $7.72 |
| Dec 2025 | 507 | 503 | 34,702 | 34,702 | 0 | $57.97 | $4.26 |
| Nov 2025 | 489 | 521 | 37,305 | 37,305 | 0 | $60.06 | $3.79 |
| Oct 2025 | 523 | 521 | 36,165 | 36,099 | 66 | $60.89 | $3.19 |
| Sep 2025 | 523 | 474 | 36,110 | 36,110 | 0 | $63.96 | $2.97 |
| Aug 2025 | 544 | 555 | 38,485 | 38,485 | 0 | $64.86 | $2.91 |
| Jul 2025 | 361 | 350 | 37,067 | 37,062 | 5 | $68.39 | $3.20 |
| Jun 2025 | 405 | 484 | 34,696 | 34,680 | 16 | $68.17 | $3.02 |
| May 2025 | 385 | 340 | 35,833 | 35,760 | 73 | $62.17 | $3.12 |
| Apr 2025 | 419 | 459 | 38,558 | 38,558 | 0 | $63.54 | $3.42 |
| Mar 2025 | 507 | 447 | 38,448 | 37,843 | 605 | $68.24 | $4.12 |
| Feb 2025 | 545 | 553 | 39,350 | 39,348 | 2 | $71.53 | $4.19 |
| Jan 2025 | 781 | 662 | 31,787 | 31,347 | 440 | $75.74 | $4.13 |
| Dec 2024 | 572 | 1,019 | 37,854 | 37,854 | 0 | $70.12 | $3.01 |
| Nov 2024 | 491 | 305 | 37,303 | 37,302 | 1 | $69.95 | $2.12 |
| Oct 2024 | 511 | 485 | 39,766 | 39,766 | 0 | $71.99 | $2.20 |
| Sep 2024 | 480 | 293 | 40,169 | 40,169 | 0 | $70.24 | $2.28 |
| Aug 2024 | 416 | 428 | 39,513 | 39,513 | 0 | $76.68 | $1.99 |
| Jul 2024 | 467 | 476 | 40,237 | 40,237 | 0 | $81.80 | $2.07 |
| Jun 2024 | 454 | 409 | 42,467 | 42,466 | 1 | $79.77 | $2.54 |
| May 2024 | 454 | 506 | 38,424 | 38,424 | 0 | $80.02 | $2.12 |
| Apr 2024 | 412 | 431 | 38,898 | 38,898 | 0 | $85.35 | $1.60 |
| Mar 2024 | 629 | 641 | 32,798 | 32,798 | 0 | $81.28 | $1.49 |
| Feb 2024 | 686 | 696 | 39,306 | 39,306 | 0 | $77.25 | $1.72 |
| Jan 2024 | 856 | 809 | 43,701 | 43,701 | 0 | $74.15 | $3.18 |
| Dec 2023 | 814 | 750 | 42,638 | 42,638 | 0 | $71.90 | $2.52 |
| Nov 2023 | 665 | 748 | 44,395 | 44,395 | 0 | $77.69 | $2.71 |
| Oct 2023 | 831 | 756 | 49,294 | 49,284 | 10 | $85.64 | $2.98 |
| Sep 2023 | 637 | 689 | 53,175 | 53,107 | 68 | $89.43 | $2.64 |
SourceTexas Railroad Commission Production Data Query, through Aug 2026. Prices: EIA.
How to check your stub against this lease Checks stopped on this lease? See the likely reasonsNearby
This lease belongs to
Apache Corporation in Irion County
- SCOTT SUGG 1213
18,263 bbl
- SPIKE S UNIT
18,156 bbl
- SUGG 2829
13,746 bbl
- SCOTT SUGG 1110
7,871 bbl
- SCOTT SUGG 0504
19,466 bbl
- SCOTT SUGG 5051 EAST
7,290 bbl
- SUGG STRIP
9,936 bbl
- SUGG 0607
10,319 bbl
- SCOTT-SUGG 5051
3,709 bbl
- KETCHUM MT. (CLEAR FORK) UNIT
14,729 bbl
Lin (Wolfcamp) field
- TURNER AR UNIT A
18,641 bbl
- TSRH UNIT 28N
8,451 bbl
- UNIVERSITY 38 D
5,782 bbl
- SCOTT SUGG 0504
19,466 bbl
- POWERS D UNIT A
20,129 bbl
- WANORECK C
20,961 bbl
- UNIVERSITY 52 S
6,516 bbl
- LINTHICUM I
3,866 bbl
- EAGLEHEAD B WEST
13,506 bbl
- NOELKE B
6,203 bbl
Leases within 10 km
- SCOTT SUGG SE UNIT
13,619 bbl · 0.9 km
- SUGG STRIP
9,936 bbl · 1.1 km
- FARMAR AH POOLED UNIT
2,158 bbl · 1.6 km
- FARMAR A
68,145 bbl · 1.7 km
- CORTES
6,279 bbl · 1.9 km
- FARMAR AF POOLED UNIT
1,192 bbl · 2 km
- FARMAR AG POOLED UNIT
1,050 bbl · 2 km
- MUNSON
15,844 bbl · 2.5 km
- KETCHUM MOUNTAIN EAST UNIT
52,579 bbl · 3.3 km
- BOLD FLINT HILL '69'
437 bbl · 3.4 km
Drilling permits within 10 km
DALLAS #1019H
new drill · horizontal · Dallas Production Company LLC · Irion County · 4.8 km
Permit 0919604 · Oct 27, 2026
DALLAS #1018H
new drill · horizontal · Dallas Production Company LLC · Irion County · 4.8 km
Permit 0919603 · Oct 26, 2026
DALLAS #1017H
new drill · horizontal · Dallas Production Company LLC · Irion County · 4.8 km
Permit 0919589 · Oct 26, 2026
DALLAS #1016H
new drill · horizontal · Dallas Production Company LLC · Irion County · 4.9 km
Permit 0919587 · Oct 26, 2026
MUNSON '17' #1
recompletion · Munson, David M. Inc. · Irion County · 4.4 km
Permit 0913796 · Mar 6, 2026