Skip to content

Texas oil lease

Producing

THREAD THE NEEDLE

Thread the Needle is an oil lease in Lynn County, Texas, operated by Tacoma Operating LLC in the Mound Lake, E. (Fusselman) field.

1 well

2,055bbl oil, last 12 months−9% vs prior year
RRC lease
8A-70022

35 royalty accounts on the county roll

Is your family on this lease?

Email me when this lease changes
Oil in Aug 2026
274 bbl
Reporting since
Jan 2020

Did a relative own a share of this lease?

Pick the year they passed and see what the lease has sold since.

Checks stopped on this lease?

  • Operator

    Operator changed: Tacoma Operating LLC took over from Smith Energy Operating Company in Dec 2025.

SourceRailroad Commission production, P-5 and P-4 records, data through Aug 2026.

See why checks stop on this lease

Wells on this lease and around it

Where the state's map puts this lease's well, and what has been drilled or permitted within about 2 miles of it.
Map of the Thread the Needle lease in Lynn County, Texas: its well ringed, among 2 wells and 0 recent drilling locations in a picture about 6 miles across.
  • This lease1Its well, ringed on the map: producing
  • Drilling locations0Permits issued in the last two years
  • Producing wells2On a lease reporting production now
  • Not producing0Shut in, inactive or no lease on record
  • Plugged0The state's wellbore record says plugged

The ringed dot is this lease's well, where the Railroad Commission's map puts it. The other dots are wells and drilling permits of the last 24 months on the land around it; the counts are for everything in the picture, which is about 6 miles across. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines, US Census Bureau county outlines, base map from USGS The National Map.

See the whole Texas well map

A one-page map of this lease to print, for a lawyer, a buyer or a probate file.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/thread-the-needle-8a-70022"><img src="https://royaltyclerk.com/maps/lease-wells/thread-the-needle-8a-70022.svg" alt="Map of the Thread the Needle lease in Lynn County, Texas: its well ringed, among 2 wells and 0 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/thread-the-needle-8a-70022">Wells on the Thread the Needle lease, Lynn County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

Production by month

Oil output fell 9% over the last 12 months

  • Oil (bars)
  • Last 12 months
Oil output fell 9% over the last 12 monthsMonthly oil production for THREAD THE NEEDLE, Sep 2023 to Aug 2026. Oil output fell 9% over the last 12 months. 2,055 bbl in the 12 months through Aug 2026, against 2,252 bbl in the 12 months before.Last 12 months: 2,055 bblbbl per month0100200300400Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 9% over the last 12 monthsMonthly oil production for THREAD THE NEEDLE, Sep 2023 to Aug 2026. Oil output fell 9% over the last 12 months. 2,055 bbl in the 12 months through Aug 2026, against 2,252 bbl in the 12 months before.Last 12 monthsbbl per month0100200300400Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Aug 2026.

From the state record

What owners ask about Thread the Needle

When is the check for August 2026 due?
August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Oct 30, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
See your next three checks
Which Texas production tax rate applies?
The Texas Comptroller lists low producing leases for this lease, from May 1, 2020. Its file does not give the rate, so we compare your stub with the full 4.6%. That is for August 2026.
Source: Texas Comptroller, approved severance tax exemptions.
Check the tax on your stub
Who buys the oil and gas?
Oil: Sentinel Transportation, LLC gathers it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
See every buyer and past buyers
How many 1099s should an owner expect for 2025?
Two companies filed this lease's reports behind 2025 checks: Smith Energy Operating Company and Tacoma Operating LLC. An owner paid by more than one of them gets a form from each. The operator is not always the company that pays, so go by the names on the stubs.
Source: Railroad Commission production reports, operator of record by month.
Check your 1099 against it

33 years of state records, 1993–2026

THREAD THE NEEDLE since 2013

We read every monthly report the Railroad Commission holds, back to January 1993. This lease first reported in January 2013. It filed 164 monthly reports through August 2026.

Sold since 2013

$8 million

What the whole lease’s oil and gas sold for at each month’s public prices, before tax and the operator’s deductions. A royalty owner’s share is their decimal of it.

A relative owned a share? See what it earned after they died
Oil sold
98,819 bbl
Gas sold
0 mcf
Best year
2013$3.9 million sold
Last report
Aug 2026First: Jan 2013

Its best year was 2013: $3.9 million of oil and gas sold

Each bar is what the lease’s oil and gas sold for that year, at that month’s prices. 2026 is only part of a year in the records, drawn lighter.

Its best year was 2013: $3.9 million of oil and gas soldThread the Needle: oil and gas sold each year from 2013 to 2026, at each month's prices. Its best year was 2013: $3.9 million of oil and gas sold.Sold each year, at each month’s prices$0$1M$2M$3M$4MPeak 2013: $4M20132014201520162017201820192020202120222023202420252026
Its best year was 2013: $3.9 million of oil and gas soldThread the Needle: oil and gas sold each year from 2013 to 2026, at each month's prices. Its best year was 2013: $3.9 million of oil and gas sold.Sold each year, at each month’s prices$0$1M$2M$3M$4MPeak 2013: $4M'13'15'20'26

SourceTexas Railroad Commission Production Data Query, every monthly report since January 1993; EIA monthly WTI and Henry Hub prices (before 1997, EIA's yearly Texas natural gas wellhead price), through August 2026.

Every year as a table
Thread the Needle: oil and gas sold each year
YearMonthsOil sold, bblGas sold, mcfSold for
2026 *81,4890$119,440
2025122,0940$137,382
2024122,4420$186,781
2023122,8110$217,682
2022123,0730$290,904
2021123,0790$207,788
2020123,2870$135,017
2019123,6090$205,658
2018124,1090$265,093
2017124,2750$215,991
2016125,2870$224,074
2015126,8260$335,750
20141215,3980$1,484,533
20131241,0400$3,990,274

* Part of the year: the records run through August 2026.

Where the gas went

No gas disposition reported for this lease

The operator has not reported where the gas went in the months we hold.

Who has run this lease

The operator changed once, most recently in Dec 2025

Operators of this lease over timeSmith Energy Operating Company, Jan 2020 to Nov 2025; Tacoma Operating LLC, Dec 2025 to Aug 20262020202120222023202420252026Changed Dec 2025Smith Energy Operating CompanyJan 2020 to Nov 2025Tacoma Operating LLCDec 2025 to now
Operators of this lease over timeSmith Energy Operating Company, Jan 2020 to Nov 2025; Tacoma Operating LLC, Dec 2025 to Aug 20262020202120222023202420252026Changed Dec 2025Smith Energy Operating CompanyJan 2020 to Nov 2025Tacoma Operating LLCDec 2025 to now

SourceTexas Railroad Commission Production Data Query, through Aug 2026.

1 well on this lease

Wells on THREAD THE NEEDLE
API numberWellStatusCompleted
42-305-30532Thread the Needle 1ActiveJan 1, 2013

SourceTexas Railroad Commission production records and full wellbore file.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Sentinel Transportation, LLCOilGathers100Dec 1, 2025–
Energy Transfer Marketing & TermOilGathers100Dec 1, 2022Dec 1, 2025
Sunoco Ptnrs. Mktg.&terminals LPOilGathers100Jan 1, 2013Dec 1, 2022

SourceRailroad Commission Form P-4 file, Oct 24, 2026 (source).

320 acres on the newest permit

  • Worth asking

    A Rule 37 case is listed

    The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.

Check your decimal on this lease
Permits for Thread the Needle
API numberWell no.Acreson the permit
42-305-305321320

SourceRailroad Commission drilling permits, Oct 31, 2026 (source 1, source 2).

On the Lynn County roll

Lynn County Appraisal District

2026 roll
Owners
36
Accounts
36
Appraised in all
$295k$295,050

Each square is one account

  • Royalty35
  • Working interest1

SourceLynn County Appraisal District, 2026 mineral roll (source), read Oct 7, 2026. Accounts matched to this lease by RRC number or lease name; no owner is named.

Estimate your royalty

36 months, newest first

Ledger for THREAD THE NEEDLE
MonthOil producedbblOil soldbblWTI$/bblHenry Hub$/MMBtu
Aug 2026Tacoma Operating274333$83.90$2.78
Jul 2026Tacoma Operating275175$80.46$2.89
Jun 2026Tacoma Operating302357$84.81$3.15
May 2026Tacoma Operating00$102.13$2.94
Apr 2026Tacoma Operating620$100.32$2.77
Mar 2026Tacoma Operating152284$91.38$3.04
Feb 2026Tacoma Operating204174$64.51$3.62
Jan 2026Tacoma Operating125166$60.04$7.72
Dec 2025Tacoma Operating158178$57.97$4.26
Nov 2025Smith Energy1750$60.06$3.79
Oct 2025Smith Energy162351$60.89$3.19
Sep 2025Smith Energy1660$63.96$2.97
Aug 2025Smith Energy180185$64.86$2.91
Jul 2025Smith Energy176362$68.39$3.20
Jun 2025Smith Energy1660$68.17$3.02
May 2025Smith Energy183147$62.17$3.12
Apr 2025Smith Energy179333$63.54$3.42
Mar 2025Smith Energy189181$68.24$4.12
Feb 2025Smith Energy181179$71.53$4.19
Jan 2025Smith Energy197178$75.74$4.13
Dec 2024Smith Energy195181$70.12$3.01
Nov 2024Smith Energy191174$69.95$2.12
Oct 2024Smith Energy205150$71.99$2.20
Sep 2024Smith Energy210357$70.24$2.28
Aug 2024Smith Energy252177$76.68$1.99
Jul 2024Smith Energy145181$81.80$2.07
Jun 2024Smith Energy199156$79.77$2.54
May 2024Smith Energy220181$80.02$2.12
Apr 2024Smith Energy211182$85.35$1.60
Mar 2024Smith Energy218352$81.28$1.49
Feb 2024Smith Energy211183$77.25$1.72
Jan 2024Smith Energy235168$74.15$3.18
Dec 2023Smith Energy235168$71.90$2.52
Nov 2023Smith Energy222345$77.69$2.71
Oct 2023Smith Energy225180$85.64$2.98
Sep 2023Smith Energy209181$89.43$2.64

SourceTexas Railroad Commission Production Data Query, through Aug 2026. Prices: EIA, through Oct 2026. Updated Oct 30, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Check my statement

Nearby

Tacoma Operating LLC in Lynn County

All Tacoma Operating LLC leases →

Mound Lake, E. (Fusselman) field

All leases in this field →

Leases within 10 km

New drilling permits in Lynn County

Newest in the county: this lease has no coordinates.