Skip to content
A-186 · SEC. 7 · BLK 6 · H&TC RR COA-939 · SEC. 6 · H&TC RR CO72DN71DN74DN62DN76DNA-186SEC. 7 · BLK 6 · H&TC RR COA-939SEC. 6 · H&TC RR COWAGGONER DNTI · 40 ACRES62DN · COMPLETED JUN 6N500 m33.8062° N 99.0354° W · PHOTO: U.S. GEOLOGICAL SURVEY

Texas oil leaseRRC 09-34334Producing

Waggoner Dnti

One well on 40 acres in Baylor County, and four more on the way. The lease produced 29,752 barrels of oil in the last 12 months, through August 2026.

Is your family on this lease?

Email me when this lease changesI own here

County
Baylor
On record since
July 2024
Newest report on file
August 2026
Unit on the newest permit
40 acres

Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.

Eight things the public record says about this lease. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

The story, from 26 monthly reports

2024 to 2026: it sold the most in 2025

Oil sold each month since July 2024The numbers match the paragraphs below
202520261Jul 20242Mar 2025320254August 202662DN completed, Jun 2025Jul 2024 onward

July 2024: the first month the lease sold oil on record, 804 barrels.

March 2025: Waggoner Operating, L.L.C. took over from W.t. Waggoner Estate, Inc..

2025: the year the lease sold the most, $2.51 million of oil and gas at public prices.

August 2026 is the newest monthly production report on file.

SourceRailroad Commission production reports, July 2024 through August 2026. Not a forecast, not reserves.

Checks stopped on this lease?

Operator

Operator changed: Waggoner Operating, L.L.C. took over from W.t. Waggoner Estate, Inc. in Mar 2025.

P-5

The previous operator's P-5 registration is listed as delinquent (last P-5 filed Mar 1, 2024).

SourceRailroad Commission production, P-5 and P-4 records, data through August 2026.See why checks stop on this lease

26 months against 7 other recordsNew

Every month since July 2024, and what else happened that month

The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.

Jan 2026
1,534 barrels · down 56.7% on the three months before
Oil averaged $60.04 a barrel · Waggoner Operating, L.L.C.
  • WeatherWinter storm, January 23 to 25. Five days below 20°F in Baylor County.
SINCEJUL 20242025202601,5003,0004,5006,000BARRELS A MONTH1 NEW WELL1 NEW WELLLAST 12 MONTHS1WEATHERTHE STATEOIL PRICENEXT DOOROPERATORBUYERSTHE FIELDW.t. Waggoner Estate, Inc.Waggoner Operating, L.L.C.20252026
One drop

Move the pointer or drag across the chart. The numbered buttons jump to each drop.

Monthly oil sold from this lease since July 2024, with seven record tracks beneath it. Use the left and right arrow keys to move month by month.. 26 months from July 2024 to August 2026. The most in one month: 5,090 barrels, June 2025. The newest month: 1,758 barrels. Moments marked: 1, Jan 2026.

SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through August 2026.

Royalty Watch tells you the month a drop starts, with the records from that month.Watch this lease

23 months, one line eachNew

No silent months since July 2024

A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.

0

runs of two or more months with nothing reported, since July 2024.

1,758

barrels of oil on the newest report on file with oil or gas, for August 2026, the State's newest month.

23

of 23 months with oil or gas reported since July 2024.

81.5

barrels of oil a day on average from September 2025 through August 2026, counting a month with no report on file as zero.

July 2024Taller line, more oil soldMay 2026
20252026

A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.

SourceRailroad Commission production reports, July 2024 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.

Royalty Watch tells you when a silent month starts, and drafts the letter asking whether the lease is still in force.Watch this lease

3 years of state records, 2024 to 2026

Sold since July 2024

$4.68million

Sales at public prices before tax and deductions. Multiply by your decimal interest to estimate your share.

Oil sold
66,194barrels
Best year
2025$2.51 million sold
Sold each year, at that month's pricesOilGas
What the oil and gas from this lease sold for each year, 2024 to 2026, at each month's public prices.
YearOil, dollarsGas, dollarsTotal
2024$927,000$0$927,000
2025$2.51 million$0$2.51 million, sold the most
2026, 2026 so far$1.25 million$0$1.25 million

Did a relative own a share of this lease?

The bars show every year. Pick one to add up what the lease has sold since.

SourcesRailroad Commission Production Data Query, every monthly report since July 2024. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.

Who has run this lease

The operator changed once, most recently in March 2025

The company named on each monthly report to the State. The operator is not always the company that pays.

  1. Waggoner Operating, L.L.C.March 2025 to now
  2. W.t. Waggoner Estate, Inc.July 2024 to February 2025

SourcesRailroad Commission production reports, the operator on each month’s report, July 2024 through August 2026.

New wells, seen from the sideNew

The completion of well 62DN was filed 534 days ago

The State's permits show each step weeks before production is reported. This is the well itself, 1.1 miles down, and where it stands today.

Well 62DN, side viewAPI 42-023-31826 · drawn to its own depth and length
534

days since the
completion was filed

ground2,000 ft4,000 ft6,000 ft62DN6,000 ft deep
  1. Permit approvedMarch 25, 2025
  2. Drilling startedMarch 29, 2025
  3. Frackednot on the registry yet
  4. Completion filedJune 6, 2025
  5. First productionnot reported yet
  6. First checkdue by October 28, 2025

SourcesPermits, depth and bottom hole: Railroad Commission of Texas. Source records through November 16, 2026.

Royalty Watch tells you the day a well here moves to its next stage.Watch this lease

About 6 miles across

Wells on this lease and around it

2this lease, ringed
12producing
0fracked and waiting
20permits, last 24 months
0plugged
50original land surveys

For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/waggoner-dnti-09-34334"><img src="https://royaltyclerk.com/maps/lease-wells/waggoner-dnti-09-34334.svg" alt="Map of the Waggoner Dnti lease in Baylor County, Texas: its 2 wells ringed, among 18 wells and 20 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/waggoner-dnti-09-34334">Wells on the Waggoner Dnti lease, Baylor County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

From the State's well records

Five wells on this lease

Wells on Waggoner Dnti
WellAPI numberCompletedDepthfeetToday
71DN42-023-31772July 20245,400Active
62DN42-023-31826June 20255,280Completed, waiting
72DN42-023-31827not filed yet6,000Drilling
74DN42-023-31870not filed yet6,000Drilling
76DN42-023-31860not filed yet6,000Drilling

SourceRailroad Commission wellbore and completion records and drilling permits.

What the drilling permits say

40acres on the newest permit

160 ACRES40 ACRES
  • 160 acres, on the 2023 permits
  • 40 acres, on the 2025 permits
Worth asking

The acres changed between permits. 160 acres, on the 2023 permits; 40 acres, on the 2025 permits. When a unit changes, every owner’s decimal is figured again.

Check your decimal on this lease

Oil, August 2026, dollars per barrel New

Four prices for the same oil

What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.

$83.90
The marketWTI Cushing, August 2026
none on file
Told its investorsno public parent's filing on record
not on file yet
Told the tax officeTexas Comptroller, this lease
?
Your statementonly you hold this one
On recordNo lower tax on record

No lower tax approval on file

Usual oil rate
4.60%

No lower tax approval appears for this lease in the two years covered by the Comptroller’s list as of October 1, 2026.

Estimate your royalty

Type the decimal from your division order

The starting decimal is an example. Nothing you type here leaves this page.

$700a month

At these prices the whole lease’s reported sales were about $2.15 million over 12 reported months. Your estimated share is $8,400 before taxes and deductions.

Monthly owner volumes and values
Estimated share before tax and deductions
MonthOil (bbl)Oil valueGas (mcf)Gas valueTotal
August 20266.8672$576.160$0.00$576.16
July 20266.3555$511.360$0.00$511.36
June 20266.4258$544.970$0.00$544.97
May 20266.3047$643.900$0.00$643.90
April 20267.875$790.020$0.00$790.02
March 20268.8125$805.290$0.00$805.29
February 20269.9297$640.560$0.00$640.56
January 20265.9922$359.770$0.00$359.77
December 202510.5859$613.670$0.00$613.67
November 202513.8438$831.460$0.00$831.46
October 202515.2148$926.430$0.00$926.43
September 202518.0117$1,152.030$0.00$1,152.03

SourcesMarket: U.S. Energy Information Administration (WTI Cushing for oil). Investors: no public parent's filing is on record for the operator. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.

Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus

Who takes the oil and gasNew

No buyer shares an owner with the operator

The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.

OIL
Runs the leaseWaggoner Operating, L.L.C.since March 2025
Gathers 100%PTT PREMIER TRADING AND TRAN LLCsince July 2024

No shared owner, officer or address on record between the oil buyers and the operator.

SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.

Royalty Watch tells you the day the buyer of your oil or gas changes.Watch this lease

Seen from space, 2025New

No satellite heat at this pad in 2025

Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.

A-186 · SEC. 7 · BLK 6 · H&TC RR COA-939 · SEC. 6 · H&TC RR COONE SATELLITE PIXEL, ABOUT 375 M
DAYNIGHT, 2025
Each dot is a nightFlaring reported
JAN0none
FEB0none
MAR0none
APR0none
MAY0none
JUN0none
JUL0none
AUG0none
SEP0none
OCT0none
NOV0none
DEC0none

A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.

0

nights with heat recorded at this pad, 2025.

0

months in which flaring was reported.

0

months with heat seen and no flaring reported.

SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 16, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.

Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus

The county appraisal roll

Roll not on file

County mineral roll

Roll not on file

Baylor Appraisal District’s mineral roll has not been read here yet.

Royalty Clerk has mineral rolls for 158 Texas counties.

Source County appraisal district mineral rolls.

From the state record

What owners ask about Waggoner Dnti

01When is the check for August 2026 due?
August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Oct 30, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
See your next three checks
02Which Texas production tax rate applies?
The Texas Comptroller lists no approved exemption or reduced rate for this lease for August 2026, so the full 4.6% on oil applies.
Source: Texas Comptroller, approved severance tax exemptions.
Check the tax on your stub
03Who buys the oil and gas?
OILPtt Premier Trading and Tran LLC100%
Oil: Ptt Premier Trading and Tran LLC gathers it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
See every buyer and past buyers
04How many 1099s should an owner expect for 2025?
2January to December 2025: 2 operators of record
Two companies filed this lease's reports behind 2025 checks: W.t. Waggoner Estate, Inc. and Waggoner Operating, L.L.C.. An owner paid by more than one of them gets a form from each. The operator is not always the company that pays, so go by the names on the stubs.
Source: Railroad Commission production reports, operator of record by month.
Check your 1099 against it

Every monthly report the State holds

26 months, newest first

Ledger for Waggoner Dnti
MonthOil soldbarrelsSold forat public pricesOperator
AugustAug 20261,758$147,000Waggoner Operating, L.L.C.
JulyJul 20261,627$131,000Waggoner Operating, L.L.C.
JuneJun 20261,645$140,000Waggoner Operating, L.L.C.
MayMay 20261,614$165,000Waggoner Operating, L.L.C.
AprilApr 20262,016$202,000Waggoner Operating, L.L.C.
MarchMar 20262,256$206,000Waggoner Operating, L.L.C.
FebruaryFeb 20262,542$164,000Waggoner Operating, L.L.C.
JanuaryJan 20261,534$92,100Waggoner Operating, L.L.C.
DecemberDec 20252,710$157,000Waggoner Operating, L.L.C.
NovemberNov 20253,544$213,000Waggoner Operating, L.L.C.
OctoberOct 20253,895$237,000Waggoner Operating, L.L.C.
SeptemberSep 20254,611$295,000Waggoner Operating, L.L.C.
AugustAug 20253,364$218,000Waggoner Operating, L.L.C.
JulyJul 20254,556$312,000Waggoner Operating, L.L.C.
JuneJun 20255,090$347,000Waggoner Operating, L.L.C.
MayMay 20252,107$131,000Waggoner Operating, L.L.C.
AprilApr 20252,202$140,000Waggoner Operating, L.L.C.
MarchMar 20252,345$160,000Waggoner Operating, L.L.C.

SourcesTexas Railroad Commission Production Data Query, through August 2026. Prices: EIA.

Do your checks match this lease?

Check my statement

Likely owed Jan 2025

A whole month was never paid

The state shows 28,175 bbl of oil sold from this lease in January 2025, so your share is 27.51 bbl. No statement covers January 2025. That is the month the operator changed from Endeavor Energy Resources to Diamondback.

Ask Diamondback owner relations: is January 2025 being held in suspense after the change of operator?

$2,277oil + gas

A sample finding, from our example check. The full example found $3,328 likely owed.

Around this lease

Nearby

Waggoner Operating, L.L.C. in Baylor County

All Waggoner Operating, L.L.C. leases

Baylor County Regular field

All leases in this field

Leases within 10 km

Drilling permits within 10 km

  • WAGGONER DNTAA #2658DNnew drill · Waggoner Operating, L.L.C. · Nov 6, 2026 · 5 km
  • WAGGONER DNTL #2646DNnew drill · Waggoner Operating, L.L.C. · Oct 20, 2026 · 4 km
  • WAGGONER DNTY #2651DNnew drill · Waggoner Operating, L.L.C. · Sept 17, 2026 · 4.5 km
  • WAGGONER DNTK #247DNnew drill · Waggoner Operating, L.L.C. · Aug 11, 2026 · 7.2 km
  • WAGGONER DNTK #248DNnew drill · Waggoner Operating, L.L.C. · Aug 11, 2026 · 6.8 km

Where it sits

This county

Baylor CountyBaylorKnoxFoardWilbargerWichitaArcherBaylor County
Baylor County

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells
  • Texas Comptroller tax approvals, lease values
  • U.S. Energy Information Administration prices
  • NOAA storms and cold
  • NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
  • U.S. Geological Survey photos