Skip to content

Texas gas well · RRC district 06 · Lease 219802

Producing

WILSON

Wilson is a gas well in Shelby County, Texas, operated by Sheridan Production Co III, LLC in the Stockman, South (Travis Peak) field. The Railroad Commission shows 8,475 mcf of gas in the 12 months through Jul 2026.

Gas well dossier · 1 well

8,475mcf gas, last 12 months+12% vs prior year
RRC lease
06-219802

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Shelby CountyShelbyPanolaSan AugustineNacogdochesSabineRuskShelby County
Shelby County · RRC district 06Open Shelby County →
Oil, last 12 months
98 bbl
Gas in Jul 2026
862 mcf
Reporting to the state
since Jan 2020
Wells
1

Production

Month by month, from the state record

What the Railroad Commission says this gas well produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Gas output rose 12% over the last 12 months

8,475 mcf in the 12 months through Jul 2026, against 7,585 mcf in the 12 months before.

  • Gas (bars, left axis)
  • Oil (line, right axis)
  • Last 12 months
Gas output rose 12% over the last 12 monthsMonthly gas production and oil for WILSON, Aug 2023 to Jul 2026. Gas output rose 12% over the last 12 months. 8,475 mcf in the 12 months through Jul 2026, against 7,585 mcf in the 12 months before.Last 12 months: 8,475 mcfmcf per monthbbl per month002501050020750301,000401,25050Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Gas output rose 12% over the last 12 monthsMonthly gas production and oil for WILSON, Aug 2023 to Jul 2026. Gas output rose 12% over the last 12 months. 8,475 mcf in the 12 months through Jul 2026, against 7,585 mcf in the 12 months before.Last 12 monthsmcf per monthbbl per month002501050020750301,000401,25050Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas well 219802, district 06. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

Since Jul 2025 the lease's gas goes to a transmission line instead of lease fuel

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

  • Transmission line (2)
  • Lease fuel (1)
Since Jul 2025 the lease's gas goes to a transmission line instead of lease fuelShare of WILSON gas by disposition code each month, Aug 2023 to Jul 2026. Since Jul 2025 the lease's gas goes to a transmission line instead of lease fuel. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of the lease’s gas by disposition code, per month0%50%100%Jul 2025: fuel to lineOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Jul 2025 the lease's gas goes to a transmission line instead of lease fuelShare of WILSON gas by disposition code each month, Aug 2023 to Jul 2026. Since Jul 2025 the lease's gas goes to a transmission line instead of lease fuel. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of gas by disposition code0%50%100%Jul 25: fuel to lineJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 219802, district 06. Reported through Jul 2026.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

Lease fuel (1)

Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

Sheridan Production Co III, LLC has reported this lease for the whole period

No change of operator in the months we hold.

Operators of this lease over timeSheridan Production Co III, LLC, Jan 2020 to Jul 20262020202120222023202420252026Sheridan Production Co III, L…Jan 2020 to nowthrough Jul 2026
Operators of this lease over timeSheridan Production Co III, LLC, Jan 2020 to Jul 20262020202120222023202420252026Sheridan Production Co III, LLCJan 2020 to nowthrough Jul 2026

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to gas well 219802 in district 06. The API number is the state’s ID for a well.
Wells on WILSON
API numberWell no.Status
42-419-310381Active

SourceTexas Railroad Commission Wellbore Query, district 06, lease 219802.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Condensate

    Eastex Crude Company, LLC gathers it.

    100% of it, on the list since Jan 1, 2023

  • Gas from gas wells

    Sheridan Production CO Iii, LLC buys and gathers it.

    Sheridan Production CO Iii, LLC buys it: 100% of it, on the list since Mar 1, 2020 · Sheridan Production CO Iii, LLC gathers it: 100% of it, on the list since Mar 1, 2020

Companies that used to be listed: Eastex Crude Company (gathers it, until Jan 1, 2023); Sheridan Production Company, LLC (gathers it, until Mar 1, 2020); Sheridan Production Company, LLC (buys it, until Mar 1, 2020); Devon Gas Services, L.p. (buys it, until Aug 1, 2019).

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

40 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
0
First completion
Jan 22, 2006
Latest permit
Nov 10, 2005

A pooling certificate was filed

Your tract may share its production with neighbours in a pooled unit. The unit acres the operator uses to divide production can differ from the acreage on one permit.

Wells and acres on the permits for Wilson
API numberWell no.Acreson the permit
42-419-31038140

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says WILSON sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Gas sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for WILSON
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Sheridan Production2108627830$80.46$2.89
Jun 2026Sheridan Production2208007240$84.81$3.15
May 2026Sheridan Production1087536870$102.13$2.94
Apr 2026Sheridan Production456666140$100.32$2.77
Mar 2026Sheridan Production768247620$91.38$3.04
Feb 2026Sheridan Production567306720$64.51$3.62
Jan 2026Sheridan Production257366840$60.04$7.72
Dec 2025Sheridan Production9126425980$57.97$4.26
Nov 2025Sheridan Production848267750$60.06$3.79
Oct 2025Sheridan Production337446960$60.89$3.19
Sep 2025Sheridan Production666736310$63.96$2.97
Aug 2025Sheridan Production102192060$64.86$2.91
Jul 2025Sheridan Production465535130$68.39$3.20
Jun 2025Sheridan Production476100$68.17$3.02
May 2025Sheridan Production987246640$62.17$3.12
Apr 2025Sheridan Production10116095620$63.54$3.42
Mar 2025Sheridan Production14147256730$68.24$4.12
Feb 2025Sheridan Production26346616160$71.53$4.19
Jan 2025Sheridan Production1006666250$75.74$4.13
Dec 2024Sheridan Production8106796390$70.12$3.01
Nov 2024Sheridan Production16117697250$69.95$2.12
Oct 2024Sheridan Production13206766390$71.99$2.20
Sep 2024Sheridan Production8207096680$70.24$2.28
Aug 2024Sheridan Production1707537080$76.68$1.99
Jul 2024Sheridan Production14168467900$81.80$2.07
Jun 2024Sheridan Production1177677190$79.77$2.54
May 2024Sheridan Production229068500$80.02$2.12
Apr 2024Sheridan Production247296850$85.35$1.60
Mar 2024Sheridan Production9138858350$81.28$1.49
Feb 2024Sheridan Production579939410$77.25$1.72
Jan 2024Sheridan Production11196496030$74.15$3.18
Dec 2023Sheridan Production1788047480$71.90$2.52
Nov 2023Sheridan Production1179368720$77.69$2.71
Oct 2023Sheridan Production32331,2301,1590$85.64$2.98
Sep 2023Sheridan Production761,2301,1610$89.43$2.64
Aug 2023Sheridan Production471,0379810$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for WILSON. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Sheridan Production Co III, LLC.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Sheridan Production Co III, LLC in Shelby County

All Sheridan Production Co III, LLC leases →

Stockman, South (Travis Peak) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

  • JOHNSON

    7,884 mcf last 12 months · 0.7 km away

  • BP COTTLE

    2,847 mcf last 12 months · 0.7 km away

  • BP COTTLE

    3,541 mcf last 12 months · 1.1 km away

  • SAMFORD

    650 mcf last 12 months · 1.3 km away

  • JOHNSON

    5,819 mcf last 12 months · 1.3 km away

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Gas sold” volume for the month the check covers and multiply it by your decimal. The answer should match the mcf on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, gas well 219802, district 06, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.

FAQ

Questions about WILSON

Who operates the WILSON lease?

The Railroad Commission lists Sheridan Production Co III, LLC (operator number 775851) as the operator of this lease in Shelby County, Texas. The operator history on this page shows earlier operators and when the record changed.

How much has the WILSON lease produced?

The lease reported 98 bbl of oil and 8,475 mcf of gas in the last 12 months through Jul 2026. Monthly figures for 36 months are in the ledger on this page, taken from the Railroad Commission's production data.

Does this page show who owns the royalty?

No. Railroad Commission records show who operates a lease and what it reported, not who owns the minerals or receives royalty. Your division order and royalty stub name the lease and your decimal interest.

How do I check my royalty stub against this lease?

Multiply the lease's volume for a month by your decimal interest and compare it with the barrels and mcf on your stub for the same month. The two are seldom identical, since sales and reporting months can differ, but a large gap is worth a question to the operator.

Check my statement