Skip to content

Texas oil lease · RRC district 08 · Lease 62698

Producing

YAHTZEE

Yahtzee is an oil lease in Culberson County, Texas, operated by Conocophillips Company in the Ford, West (Wolfcamp) field. The Railroad Commission shows 57,345 bbl of oil in the 12 months through Jul 2026.

Oil lease dossier · 1 well

57,345bbl oil, last 12 months−68% vs prior year
RRC lease
08-62698

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Culberson CountyCulbersonCulberson County
Culberson County · RRC district 08Open Culberson County →
Gas, last 12 months
604,429 mcf
Oil in Jul 2026
5,593 bbl
Reporting to the state
since Apr 2024
Wells
1

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Oil output fell 68% over the last 12 months

57,345 bbl in the 12 months through Jul 2026, against 177,989 bbl in the 12 months before.

  • Oil (bars, left axis)
  • Gas (line, right axis)
  • Last 12 months
Oil output fell 68% over the last 12 monthsMonthly oil production and gas for YAHTZEE, Apr 2024 to Jul 2026. Oil output fell 68% over the last 12 months. 57,345 bbl in the 12 months through Jul 2026, against 177,989 bbl in the 12 months before.Last 12 months: 57,345 bblbbl per monthmcf per month0010k25k20k50k30k75k40k100kApr 24JulOctJan 25AprJulOctJan 26AprJul
Oil output fell 68% over the last 12 monthsMonthly oil production and gas for YAHTZEE, Apr 2024 to Jul 2026. Oil output fell 68% over the last 12 months. 57,345 bbl in the 12 months through Jul 2026, against 177,989 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month0010k25k20k50k30k75k40k100kJul 24Jan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, oil lease 62698, district 08. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

All of the gas went to a processing plant in the last 12 months

Each bar is one month. Colors are the disposition codes the operator reported.

All of the gas went to a processing plant in the last 12 monthsShare of YAHTZEE gas by disposition code each month, Apr 2024 to Jul 2026. All of the gas went to a processing plant in the last 12 months. Share of the lease’s gas by disposition code, per month0%50%100%Apr 24JulOctJan 25AprJulOctJan 26AprJul
All of the gas went to a processing plant in the last 12 monthsShare of YAHTZEE gas by disposition code each month, Apr 2024 to Jul 2026. All of the gas went to a processing plant in the last 12 months. Share of gas by disposition code0%50%100%Jul 24Jan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 62698, district 08. Reported through Jul 2026.

Processing plant (3)

Sent to a gas plant that pulls out natural gas liquids. Your statement should show plant products, and may show processing fees.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

Conocophillips Company has reported this lease for the whole period

No change of operator in the months we hold.

Operators of this lease over timeConocophillips Company, Apr 2024 to Jul 202620252026Conocophillips CompanyApr 2024 to nowthrough Jul 2026
Operators of this lease over timeConocophillips Company, Apr 2024 to Jul 202620252026Conocophillips CompanyApr 2024 to nowthrough Jul 2026

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to oil lease 62698 in district 08. The API number is the state’s ID for a well.
Wells on YAHTZEE
API numberWell no.Status
42-109-3399310HActive

SourceTexas Railroad Commission Wellbore Query, district 08, lease 62698.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Oil

    4J Energy, LLC and Cp Energy, L.l.c. gather it.

    4J Energy, LLC gathers it: 50% of it, on the list since Apr 23, 2024 · Cp Energy, L.l.c. gathers it: 50% of it, on the list since Apr 23, 2024

  • Gas from oil wells

    Delaware Basin Midstream LLC buys and gathers it.

    Delaware Basin Midstream LLC buys it: 100% of it, on the list since Apr 23, 2024 · Delaware Basin Midstream LLC gathers it: 100% of it, on the list since Apr 23, 2024

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

1,302 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
1
First completion
Apr 23, 2024
Latest permit
Jan 25, 2023
Wells and acres on the permits for Yahtzee
API numberWell no.Acreson the permit
42-109-3399310H1,302

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

What the operator reported

What ConocoPhillips told investors it received

Conocophillips Company is linked to ConocoPhillips (COP). Public companies report the average price they realize each quarter. It is an average across everything the company operates, not the price on this lease.
Realized prices reported by ConocoPhillips
QuarterOil$ per bblFiling
Q2 2026$99.40SEC filing
Q1 2026$73.47SEC filing
Q3 2025$66.13SEC filing
Q2 2025$64.23SEC filing
Q1 2025$71.65SEC filing
Q3 2024$76.77SEC filing

SourceConocoPhillips quarterly reports on SEC EDGAR, prices before hedging where the company states both. Read by machine from each filing’s tables; the link opens the filing so you can check the figure.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says YAHTZEE sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

28 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for YAHTZEE
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Conocophillips Company5,5935,56145,59545,5950$80.46$2.89
Jun 2026Conocophillips Company4,2074,18268,08768,0870$84.81$3.15
May 2026Conocophillips Company4,1464,17548,67848,6780$102.13$2.94
Apr 2026Conocophillips Company4,1914,19548,53048,5300$100.32$2.77
Mar 2026Conocophillips Company4,5234,50151,02751,0270$91.38$3.04
Feb 2026Conocophillips Company4,2284,23340,91240,9120$64.51$3.62
Jan 2026Conocophillips Company5,4005,41142,54342,5430$60.04$7.72
Dec 2025Conocophillips Company6,1236,11456,26756,2670$57.97$4.26
Nov 2025Conocophillips Company3,4933,48539,03139,0310$60.06$3.79
Oct 2025Conocophillips Company3,5203,51734,94234,9420$60.89$3.19
Sep 2025Conocophillips Company5,2665,27956,04456,0440$63.96$2.97
Aug 2025Conocophillips Company6,6556,69872,77372,7730$64.86$2.91
Jul 2025Conocophillips Company11,35611,34671,19371,1930$68.39$3.20
Jun 2025Conocophillips Company10,31710,33063,46863,4680$68.17$3.02
May 2025Conocophillips Company11,50511,50169,95769,9570$62.17$3.12
Apr 2025Conocophillips Company11,54311,55963,18563,1850$63.54$3.42
Mar 2025Conocophillips Company12,32512,31573,03173,0310$68.24$4.12
Feb 2025Conocophillips Company11,09211,10760,94760,9470$71.53$4.19
Jan 2025Conocophillips Company12,88512,90672,60572,6050$75.74$4.13
Dec 2024Conocophillips Company14,67514,64679,40979,4090$70.12$3.01
Nov 2024Conocophillips Company17,21117,21464,21364,2130$69.95$2.12
Oct 2024Conocophillips Company18,08818,16272,59872,5980$71.99$2.20
Sep 2024Conocophillips Company21,78821,73278,08678,0860$70.24$2.28
Aug 2024Conocophillips Company25,20425,22789,48489,4840$76.68$1.99
Jul 2024Conocophillips Company29,23929,29092,26392,2630$81.80$2.07
Jun 2024Conocophillips Company33,59033,60194,87394,8730$79.77$2.54
May 2024Conocophillips Company37,12736,95293,35593,3550$80.02$2.12
Apr 2024Conocophillips Company4,9374,89816,64516,6450$85.35$1.60

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for YAHTZEE. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Conocophillips Company.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Conocophillips Company in Culberson County

All Conocophillips Company leases →

Ford, West (Wolfcamp) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

  • YAHTZEE

    530,406 mcf last 12 months · 0 km away

  • YAHTZEE

    726,302 mcf last 12 months · 0 km away

  • YAHTZEE

    478,686 mcf last 12 months · 0 km away

  • YAHTZEE

    506,238 mcf last 12 months · 0 km away

  • YAHTZEE

    500,656 mcf last 12 months · 0 km away

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 62698, district 08, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.