Skip to content

Jackson County, Texas

Jackson County drilling permits: what the state recorded

  • 7drilling permits
  • 16completions
  • 1first-production report
  • in the last twelve months

Wells by coordinates

Oil wells and drilling locations in Jackson County

Map of Jackson County, Texas, with 1,231 oil and gas wells and 14 recent drilling locations as dots.
  • Drilling locations14Permits issued in the last two years
  • Producing wells582On a lease reporting production now
  • Not producing366Shut in, inactive or no lease on record
  • Plugged283The state's wellbore record says plugged

Sources: Railroad Commission of Texas well layers and permit files, US Census Bureau county outline, town points from GeoNames (CC BY 4.0), base map from USGS The National Map. A dot is a surface location; a horizontal well runs a mile or more from it.

See the whole Texas well map

1,231 wells with a location on the state's map and 14 drilling locations permitted in the last 24 months, each where the Railroad Commission puts it.

7 drilling permits, 16 completions and 1 first-production report in the last twelve months. Follow the county or one abstract and get one email a week when something new is recorded.

A permit is not a well.

Wells near each town in Jackson County

Wells within 10 miles of each town, on either side of the county line.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas-well-watch/jackson-county-tx"><img src="https://royaltyclerk.com/maps/county-wells/jackson-county-tx.svg" alt="Map of Jackson County, Texas, with 1,231 oil and gas wells and 14 recent drilling locations as dots." width="1000" height="1358" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas-well-watch/jackson-county-tx">Jackson County, Texas oil and gas wells</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

The last twelve months

Month by month in Jackson County

Drilling events by month in Jackson County
MonthPermitsCompletionsFirst production
Oct 2026200
Sep 2026310
Aug 2026010
Jul 2026020
May 2026030
Apr 2026010
Mar 2026021
Feb 2026010
Jan 2026050
Dec 2025200

Counted from November 16, 2025 to October 29, 2026, so the first and last months are partial. Source: Railroad Commission of Texas data sets.

Free, no sign-in

The newest drilling permits in Jackson County

The 37 newest W-1 permits the Railroad Commission issued here, through October 29, 2026.
The newest drilling permits issued in Jackson County
IssuedLease and well
2026-10-29BROOKING, G.T. 45recompletion · verticalBritnic Oil & Gas, Inc.API 42-239-33451 · permit 091954928.73390, -96.544327,637 ft
2026-10-16WEST RANCH (41-A/98-A CONS) UNIT 2193recompletion · verticalHilcorp Energy CompanyAPI 42-239-33833 · permit 091921528.79355, -96.60072drilling began 2025-08-20 · 7,200 ft
2026-09-21WEST RANCH A 2075recompletion · verticalHilcorp Energy CompanyAPI 42-239-33804 · permit 091871828.77256, -96.623896,474 ft
2026-09-21WEST RANCH A 600recompletion · verticalHilcorp Energy CompanyAPI 42-239-33580 · permit 091870828.79492, -96.606756,500 ft
2026-09-16STAFFORD UNIT 1new drill · verticalKaler Energy Corp.API 42-239-33972 · permit 091864528.92082, -96.7341811,500 ft
2025-12-23LORENZEN 2new drill · verticalPaloma Operating, LLCAPI 42-239-33971 · permit 091239428.90166, -96.65247drilling began 2026-01-10 · 6,900 ft
2025-12-15YAUSSI B X 1new drill · verticalOxbow Ep LLCAPI 42-239-33970 · permit 091207729.09099, -96.66363drilling began 2025-12-16 · 6,300 ft
2025-09-18L RANCH D UNIT 1Arecompletion · verticalWagner Oil CompanyAPI 42-239-33436 · permit 091033428.82761, -96.466018,600 ft
2025-08-21HESS 2Are-entry · verticalMamerow Energy CorpAPI 42-239-31455 · permit 090993928.99693, -96.402866,718 ft
2025-08-08MAUDE K. HILLYER 2recompletion · verticalBeard Oil Company, LLCAPI 42-239-01645 · permit 090971328.97473, -96.565806,815 ft
2025-03-25ROSE-SAMPLE 2re-entry · verticalStone Edge Energy, LLCAPI 42-239-32434 · permit 090636029.09749, -96.646412,800 ft
2025-03-21LORENZEN 1recompletion · verticalPaloma Operating, LLCAPI 42-239-33944 · permit 090679328.90833, -96.65820drilling began 2021-01-08 · 6,805 ft
2024-12-10WEST RANCH (41-A/98-A CONS) UNIT 1044recompletion · verticalHilcorp Energy CompanyAPI 42-239-33723 · permit 090435628.78005, -96.61870drilling began 2024-10-30 · 6,494 ft
2024-12-04YAUSSI B 101new drill · verticalOxbow Ep LLCAPI 42-239-33969 · permit 090442729.08881, -96.66233drilling began 2024-12-07 · 3,500 ft
2024-11-13WEST RANCH -A- 439recompletion · verticalHilcorp Energy CompanyAPI 42-239-02785 · permit 090390628.76957, -96.623567,810 ft
2024-10-22WEST RANCH -A- 1109recompletion · verticalHilcorp Energy CompanyAPI 42-239-33887 · permit 090341528.77117, -96.630506,482 ft
2024-09-30WEST RANCH (41-A/98-A CONS) UNIT 326recompletion · verticalHilcorp Energy CompanyAPI 42-239-02674 · permit 090283828.80209, -96.60503drilling began 2024-05-22 · 6,500 ft
2024-09-26WEST RANCH -A- 503recompletion · verticalHilcorp Energy CompanyAPI 42-239-32014 · permit 090283928.77661, -96.623558,251 ft
2024-09-20WEST RANCH (41-A/98-A CONS) UNIT 1107reclass · verticalHilcorp Energy CompanyAPI 42-239-33799 · permit 090275528.77568, -96.627876,470 ft
2024-09-18WEST RANCH (41-A/98-A CONS) UNIT 1071reclass · verticalHilcorp Energy CompanyAPI 42-239-33709 · permit 090272528.79468, -96.61701drilling began 2024-03-25 · 6,485 ft
2024-09-11DRUMMOND, J.H. A 2recompletion · verticalHilcorp Energy CompanyAPI 42-239-33576 · permit 090254928.80440, -96.616039,000 ft
2024-08-09ROBBINS 7recompletion · verticalHG Operating LLCAPI 42-239-33588 · permit 090128528.93383, -96.522657,445 ft
2024-07-18WEST RANCH (41-A/98-A CONS) UNIT 1110reclass · verticalHilcorp Energy CompanyAPI 42-239-33757 · permit 090120228.77662, -96.62189drilling began 2024-04-02 · 6,505 ft
2024-06-28WEST RANCH (41-A/98-A CONS) UNIT 1065reclass · verticalHilcorp Energy CompanyAPI 42-239-33706 · permit 090074228.78727, -96.62366drilling began 2024-05-01 · 6,500 ft
2024-06-05WEST RANCH (41-A/98-A CONS) UNIT 1046reclass · verticalHilcorp Energy CompanyAPI 42-239-33754 · permit 090011428.77968, -96.62449drilling began 2024-03-21 · 6,489 ft
2024-06-05WEST RANCH (41-A/98-A CONS) UNIT 1019reclass · verticalHilcorp Energy CompanyAPI 42-239-33687 · permit 090002828.78545, -96.61531drilling began 2024-04-16 · 6,401 ft
2024-05-31WEST RANCH -A- 1123recompletion · verticalHilcorp Energy CompanyAPI 42-239-33903 · permit 090002728.78311, -96.60084drilling began 2024-03-05 · 6,444 ft
2024-05-20JOHN MACHYCEK 2re-entry · verticalMamerow Energy CorpAPI 42-239-00722 · permit 089853729.00200, -96.387015,850 ft
2024-02-07TEXANA 1new drill · verticalKaler Energy Corp.API 42-239-33968 · permit 089709729.03743, -96.6015310,000 ft
2024-01-30WEST RANCH (41-A/98-A CONS) UNIT 1069reclass · verticalHilcorp Energy CompanyAPI 42-239-33707 · permit 089685428.79694, -96.61275drilling began 2023-12-18 · 6,438 ft
2024-01-12WEST RANCH -A- 378recompletion · verticalHilcorp Energy CompanyAPI 42-239-02725 · permit 089644828.78244, -96.60698drilling began 2023-11-22 · 6,303 ft
2023-12-15WEST RANCH -A- 508recompletion · verticalHilcorp Energy CompanyAPI 42-239-32010 · permit 089596128.78412, -96.60023drilling began 2023-11-20 · 6,500 ft
2023-11-15WEST RANCH -A- 394recompletion · verticalHilcorp Energy CompanyAPI 42-239-02741 · permit 089514928.78801, -96.60795drilling began 2023-10-25 · 5,854 ft
2023-10-23WEST RANCH -A- 127recompletion · verticalHilcorp Energy CompanyAPI 42-239-02482 · permit 089472028.78282, -96.60182drilling began 2023-10-09 · 5,819 ft
2023-10-23WEST RANCH -A- 602recompletion · verticalHilcorp Energy CompanyAPI 42-239-33586 · permit 089471128.79354, -96.60550drilling began 2023-10-16 · 6,553 ft
2023-10-02DRUMMOND, J.H. 3Mrecompletion · verticalHilcorp Energy CompanyAPI 42-239-33569 · permit 089404128.80617, -96.61399drilling began 2023-10-12 · 8,007 ft
2021-04-16STRICKLER 2new drill · verticalZeppe Petroleum, LLCAPI 42-239-33945 · permit 086533828.99249, -96.47934drilling began 2023-03-16 · 6,500 ft

A permit is permission to drill, not a well. Source: Railroad Commission of Texas drilling permit files.

Email me the new ones

Year by year

Drilling permits issued in Jackson County, by year

Drilling permits issued in Jackson County by year
YearPermits issued
2026 so far5
20257
202419
20235
20211

Counted from the permit files we hold, which start in 2021; that first year may be partial. Source: Railroad Commission of Texas drilling permit files.

The latest

The most recent records

The latest drilling records in Jackson County
DateWhat, who and where
2026-10-29Permit issued: Britnic Oil & Gas, Inc.BROOKING, G.T. · A-7 · permit 0919549
2026-10-16Permit issued: Hilcorp Energy CompanyWEST RANCH (41-A/98-A CONS) UNIT · A-59 · permit 0919215
2026-09-21Permit issued: Hilcorp Energy CompanyWEST RANCH A · A-59 · permit 0918718
2026-09-21Permit issued: Hilcorp Energy CompanyWEST RANCH A · A-59 · permit 0918708
2026-09-16Permit issued: Kaler Energy Corp.STAFFORD UNIT · A-21 · permit 0918645
2026-09-14Completed: Mamerow Energy CorpHESS · A-357 · permit 0909939
2026-08-08Completed: Hilcorp Energy CompanyWEST RANCH (41-A/98-A CONS) UNIT · A-59 · permit 0902755
2026-07-10Completed: Hilcorp Energy CompanyWEST RANCH (41-A/98-A CONS) UNIT · A-24
2026-07-10Completed: Hilcorp Energy CompanyWEST RANCH (41-A/98-A CONS) UNIT · A-24
2026-05-29Completed: Hilcorp Energy CompanyWEST RANCH (41-A/98-A CONS) UNIT · A-59
2026-05-07Completed: McGowan Working Partners, Inc.JOHNSON, ELMER · A-149
2026-05-06CompletedA-7
2026-04-10Completed: Hilcorp Energy CompanyWEST RANCH (41-A/98-A CONS) UNIT · A-59
2026-03-24Completed: Hilcorp Energy CompanyWEST RANCH (41-A/98-A CONS) UNIT · A-59
2026-03-20Completed: Paloma Operating, LLCLORENZEN · A-213 · permit 0912394

Coming up

First checks coming due in Jackson County

Worked out from the state's first-production month: 120 days after the end of the month. The earliest date, not a certainty.
  • WEST RANCH (41-A/98-A CONS) UNIT, Hilcorp Energy Companyby November 28, 2026
  • WEST RANCH (41-A/98-A CONS) UNIT, Hilcorp Energy Companyby November 28, 2026

Follow it

Watch Jackson County, or one abstract

Pick the whole county or search your abstract. One email a week at most.

What do you want to follow?

Where the land is. Your deed or lease names it.

For example A-1119, or Bush, or T&P 38. Your deed or the tax bill has it.

All of Jackson County: leases, operators and production

FAQ

Questions people ask

How many wells were permitted in Jackson County in the last year?

The Railroad Commission issued 7 drilling permits in Jackson County in the twelve months to October 29, 2026, and recorded 16 completions and 1 first-production report. A permit is permission to drill, not a well.

How do I get an alert when a permit is issued near my land in Jackson County?

Choose your abstract on this page, or the whole county, and sign in. You get one email a week, only when something new is recorded after you sign up. The alert says whether an event is on an interest in your Mineral File, on a place you follow, or only nearby.

When is my first royalty check due after a new well?

Natural Resources Code section 91.402(a) says on or before 120 days after the end of the month of first sale of production from the well. The state's first-production month is the closest public marker, so the date on this page is the earliest, not a certainty.

Work out the first-check date

Got a new well on your land?

The first check is due within 120 days after the end of the month of first sale.