Texas operatorRRC operator 823552Active
Stone Edge Energy, LLC
Stone runs 1 producing lease in Jackson County. They sold 4,519 barrels of oil in the last 12 months, through August 2026.
- Producing leases
- 1
- Counties
- 1
- Biggest county
- Jackson
- Biggest field
- Cordele (M-3)
- First report
- March 2022
- Newest month
- August 2026
The story, from 54 months of reports
How Stone Edge Energy runs one oil lease in Jackson County
Stone Edge Energy, LLC runs one producing lease in Jackson County, with one active well. Its output is oil. The company first reported output on a lease in 2022, the year its one well was completed. Oil reached 8,431 barrels in 2023. It then fell to 4,690 barrels in 2024 and 4,379 barrels in 2025. Oil made more of its output than gas in every full calendar year from 2023 to 2025. The state shows no gas from the lease in those years. The company filed one drilling permit in 2025. None of its wells is horizontal. Its one lease sits in the Cordele (M-3) field, the only field where it produces.
Not a forecast, not reserves.
54 months against three other recordsNew
Every month since Stone's first report, and what else happened that month
All of its leases added together are the line on top. Under it, on the same clock: the weather, the price and how many leases it ran. Move across it.
Oil averaged $70.25 a barrel · 1 leases reporting
- No public record explains this drop.
- No storm in its main counties, no State cut-off, no lease moving to or from it and no change of buyer on record that month. The price was less than 15% under three months before, and the leases reporting fell by less than a tenth.
Move the pointer or drag across the chart. The numbered buttons jump to each month.
Monthly production of all Stone Edge Energy, LLC leases, with the records of the same months beneath it. 54 months from March 2022 to August 2026. The most in one month: 1,140 barrels, February 2023. The newest month: 256 barrels. Moments marked: 1, Jun 2023; 2, Mar 2024; 3, Feb 2025.
SourcesProduction, leases, takeovers, cut-offs and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration (West Texas Intermediate a barrel and Henry Hub per million Btu). Operator 823552, through August 2026, file dated Oct 20, 2026. A record in the same month is not proof of a cause.
Royalty Watch tells you the month your own lease starts to drop, with the records from that month.See Royalty Watch
Every producing lease, drawn to size
Which lease Stone Edge Energy runs today
The box is its one lease. Its size is the oil it sold in the last 12 months. Its colour says whether that is more or less than the 12 months before. Tap it to see the lease in the list.
| County | Field | barrels produced, 12 reports | on the 12 before | 24 months | Also on record | |
|---|---|---|---|---|---|---|
| Rose-Sample | Jackson | Cordele (M-3) | 4,519 | ▼ 4.18% | Nothing else |
SourceTexas Railroad Commission Production Data Query, operator 823552, through August 2026.
When leases change handsNew
No lease on its list came from another operator
The State's operator of record for its leases, month by month, shows no lease that moved to Stone from another operator. None of its leases has stopped reporting either. A new operator has to set up every owner again before it can pay; on these leases no such change is on file.
of its 1 lease on record came to it from another operator in the months on file.
of its leases have stopped reporting.
SourceRailroad Commission production reports and operator of record by month, operator 823552. Reported through August 2026.
Royalty Watch tells you the month your lease gets a new operator, and what to send them.See Royalty Watch
Prices and tax, August 2026New
Oil at the market, West Texas Intermediate, August 2026: $83.90 a barrel. No lower tax approved on its leases.
The market price is the public benchmark. No price told to investors or to the tax office is on file for its leases, and the Comptroller lists no lower tax on them. The price on your statement is the one to set beside the market, and the tax line beside the full rate.
No lower tax approved on its leases
- Rate, oil
- 4.60%
- Rate, gas
- 7.50%
The Comptroller lists no approved lower tax on its producing leases, so the tax line on a statement should show the full rate.
Check the tax on your stubSourcesMarket: U.S. Energy Information Administration, August 2026, West Texas Intermediate a barrel. Tax approvals and tax office prices: Texas Comptroller. Comptroller tax approval source date unavailable.
Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus
Who takes the oil and gasNew
Who gathers and buys its oil and gas
The State's P-4 records list who gathers and who buys from each lease, and company filings list who owns whom. That record is not on file here yet for Stone's leases.
- Gatherernot on file here
- Purchasernot on file here
- Ownership comparisonnot on file here
- Gatherernot on file here
- Purchasernot on file here
- Ownership comparisonnot on file here
SourcesBuyers and gatherers: Railroad Commission Form P-4 records. Ownership: U.S. Securities and Exchange Commission filings and Railroad Commission P-5 records. Source date unavailable.
Royalty Watch tells you the day the buyer of your oil or gas changes.See Royalty Watch
Seen from space, 2025New
No repeat heat matched to this operator's leases in the records read
NOAA's VIIRS instruments record hot spots at night on the passes they make over Texas, when cloud does not hide the ground. In the readings read here for 2025, no spot that repeated near the located wells of Stone's leases was matched to one of them. That is not a finding that its pads had no heat: a lease is looked at only where its wells have a location on file, and cloud and missed passes hide nights. A location alone does not show that the satellites saw its wells. No flaring report was matched at the leases included in the comparison for 2025. That is not a finding that it reported none: a lease with no well location on file is not compared, and a month with no report read is not counted.
lease-nights of repeat heat matched to Stone's leases in the satellite records read for 2025: not proof of no heat, since only clear nights on the passes read are seen.
lease-month with flaring reported at the leases included in the comparison, January to December 2025. Not a count for the operator: a lease with no well location on file is not compared, and a month with no report read is not counted as a report.
SourcesHeat: NOAA VIIRS night detections (375 m) within 500 m of a lease's located wells, counted only where the spot repeats on several nights; GOES-East readings never establish a night. Reported flaring and gas use: Railroad Commission production reports, by disposition code (what the codes mean). Cloud, missed passes and days missing from the readings hide nights, so a count of nights or lease-nights is a floor and no heat matched is not proof of none. The satellite records heat. It does not say what burned. Flaring set beside the heat (disposition code 4) is counted only at the leases included in the comparison, January to December 2025; a lease with no well location on file is not compared, and a month with no report read for a lease is not counted as a report. Nights counted for January to December 2025; satellite readings read here run from February 22, 2024 through November 17, 2026. Production report file dated October 20, 2026.
Watch Plus checks whether you were paid on gas in the months heat was seen at your lease.See Watch Plus
Permits, drilling and fracsNew
No new drilling permit in the last 12 months
The State's permit list, as read here, has no drilling permit issued to Stone from November 22, 2025 to November 21, 2026. Its newest permit on file was issued on March 25, 2025, for Rose-Sample well 2. The dates its wells were drilled, fracked and first produced are not on file here, so this page cannot say whether a well is on the way.
SourcesDrilling permits issued: Railroad Commission of Texas drilling permits. Newest permit issued March 25, 2025. Permit list dated November 19, 2026.
Royalty Watch tells you the day a well on your lease moves to its next stage.See Royalty Watch
On file with the Railroad Commission of Texas
Stone Edge Energy, LLC address and phone number
- Organization
- Stone Edge Energy, LLC
- Operator number
- 823552
- Status
- Active
- Mailing address
- 2882 N. Mechanic St.
El Campo, TX 77437 - Phone
- (512) 924-9187
- Last filing received
- Dec 11, 2025
- Leases on record
- 1, of which 1 producing
- First production report
- March 2022
- Railroad Commission district
- 02
- Organization type
- Limited liability company (code not in the RRC's 2014 layout; inferred from the names)
This is the address of record with the State. It can be a regulatory office and not the desk that pays royalties.
SourceRailroad Commission of Texas, organization (P-5) file. Record dated October 22, 2026. No address is shown for a person who operates under their own name. Royalty Clerk is not affiliated with Stone Edge Energy, LLC.
From the state record
What owners ask about Stone
- 01When is the check for August 2026 due?
- Aug 31sale month endsOct 30oil dueNov 29gas dueTODAY, NOV 21
- August 2026 is the newest month the State has posted for Stone's leases. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by October 30, 2026 and the gas by November 29, 2026, unless the lease sets another time.
- Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
- See your next three checks
- 02Do Stone's leases pay the full production tax?
- Gas, full rate, 1 lease7.50%Oil, all 1 lease4.60%
- The Comptroller lists no approved lower tax on its producing leases, so the full 4.60% for oil and 7.50% for gas apply.
- Source: Texas Comptroller, approved severance tax exemptions.
- Check the tax on your stub
- 03Who runs the lease now, and since when?
- The Railroad Commission lists Stone Edge Energy, LLC as the operator of its one producing lease in Jackson County. The company first reported output on a lease in 2022. Its one well is active.
- 04Why did the oil output drop after 2023?
- Oil output was 8,431 barrels in 2023, 4,690 barrels in 2024 and 4,379 barrels in 2025. The state shows no gas from the lease in those full years. The tool below splits a drop from one check to the next.
- Why is my royalty check lower?
- 05Has this operator filed new drilling permits here?
- The state shows one drilling permit filed by this operator in 2025. None of its one well is horizontal. The well was completed in 2022.
- 06Who buys the oil from this lease?
- The Railroad Commission lists the buyers and gatherers for each lease. The tool below shows who is listed for this operator's lease in Jackson County, and since when.
- Who buys my oil and gas?
From the State’s records through July 2026.
Do your Stone checks match the State?
Paid by Stone? Add your leases to My leases and see your share of every month.
Example
A whole month was never paid
The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.
Ask Operator B's owner relations: is that month held in suspense after the change of operator?
$2,277oil and gas
A sample finding, from our example check.
Around this operator
Nearby
Other operators in Jackson County
- Hilcorp Energy Company928K bbl, 12 months
- KD Energy, LLC37K bbl, 12 months
- Forza Operating, LLC5,541 bbl, 12 months
- Decker Operating Co., L.L.C.12K bbl, 12 months
- McGowan Working Partners, Inc.25K bbl, 12 months
Counties where Stone works
- Jackson County1 Stone lease
Fields where Stone works
- Cordele (M-3)1 Stone lease
Drilling permits this operator has filed recently
- Rose-Sample 2approved Mar 25, 2025 · Jackson · re-entry · no. 0906360
Related pages
- Jackson CountyJackson County, where this operator's one lease produces oil.
- Cordele (M-3)Cordele (M-3) field, the only field where its lease produces.
Where this page comes from
- Railroad Commission of Texas production, Form P-4, Form P-5, permits, wells
- Texas Comptroller tax approvals, lease prices
- U.S. Energy Information Administration prices
- SEC EDGAR company filings
- FracFocus frac dates
- NOAA storms and cold
- NOAA VIIRS night heat
- U.S. Census Bureau county shapes