Tom Green County, Texas
Tom Green County drilling permits: what the state recorded
- 10drilling permits
- 7completions
- 5first-production reports
- in the last twelve months
Wells by coordinates
Oil wells and drilling locations in Tom Green County
- Drilling locations14Permits issued in the last two years
- Producing wells633On a lease reporting production now
- Not producing185Shut in, inactive or no lease on record
- Plugged245The state's wellbore record says plugged
Sources: Railroad Commission of Texas well layers and permit files, US Census Bureau county outline, town points from GeoNames (CC BY 4.0), base map from USGS The National Map. A dot is a surface location; a horizontal well runs a mile or more from it.
1,063 wells with a location on the state's map and 14 drilling locations permitted in the last 24 months, each where the Railroad Commission puts it.
A permit is not a well.
Tom Green County is one of the 61 counties of the Permian Basin
Wells near each town in Tom Green County
Wells within 10 miles of each town, on either side of the county line.
Use this map on your site
You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.
<a href="https://royaltyclerk.com/texas-well-watch/tom-green-county-tx"><img src="https://royaltyclerk.com/maps/county-wells/tom-green-county-tx.svg" alt="Map of Tom Green County, Texas, with 1,063 oil and gas wells and 14 recent drilling locations as dots." width="1000" height="910" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas-well-watch/tom-green-county-tx">Tom Green County, Texas oil and gas wells</a> by Royalty Clerk, from Railroad Commission of Texas records</p>The last twelve months
Month by month in Tom Green County
| Month | Permits | Completions | First production |
|---|---|---|---|
| Nov 2026 | 2 | 0 | 0 |
| Oct 2026 | 2 | 0 | 0 |
| Jun 2026 | 0 | 2 | 0 |
| May 2026 | 1 | 2 | 1 |
| Apr 2026 | 2 | 0 | 0 |
| Mar 2026 | 0 | 1 | 2 |
| Feb 2026 | 1 | 0 | 0 |
| Jan 2026 | 0 | 2 | 2 |
| Dec 2025 | 2 | 0 | 0 |
Counted from November 20, 2025 to November 5, 2026, so the first and last months are partial. Source: Railroad Commission of Texas data sets.
Free, no sign-in
The newest drilling permits in Tom Green County
| Issued | Lease and well | Operator | Drilling began | Depth, ft | API number | Coordinates | Permit |
|---|---|---|---|---|---|---|---|
| 2026-11-05 | WARDLAW C 3Hnew drill · horizontalHibernia Resources IV, LLCAPI 42-451-32935 · permit 091972731.53576, -100.714499,000 ft | Hibernia Resources IV, LLC | |||||
| 2026-11-05 | WARDLAW B 2Hnew drill · horizontalHibernia Resources IV, LLCAPI 42-451-32934 · permit 091972431.53582, -100.714499,000 ft | Hibernia Resources IV, LLC | |||||
| 2026-10-08 | MIDWAY UNIT 2Hnew drill · horizontalMoriah Operating,llcAPI 42-451-32933 · permit 091904431.63549, -100.745088,000 ft | Moriah Operating,llc | |||||
| 2026-10-07 | BOUGAINVILLE UNIT 1Hnew drill · horizontalMoriah Operating,llcAPI 42-451-32932 · permit 091904131.64062, -100.76053drilling began 2026-10-26 · 8,000 ft | Moriah Operating,llc | |||||
| 2026-05-04 | WHITEHEAD V 1new drill · verticalTischer Energy, LLCAPI 42-451-32930 · permit 091528631.19684, -100.294324,800 ft | Tischer Energy, LLC | |||||
| 2026-04-08 | CORAL SEA UNIT 1Hnew drill · horizontalMoriah Operating,llcAPI 42-451-32929 · permit 091454131.62428, -100.77297drilling began 2026-05-30 · 8,900 ft | Moriah Operating,llc | |||||
| 2026-04-08 | TARAWA UNIT 1Hnew drill · horizontalMoriah Operating,llcAPI 42-451-32928 · permit 091453531.64215, -100.76578drilling began 2026-05-15 · 8,900 ft | Moriah Operating,llc | |||||
| 2026-02-25 | WARDLAW A 1Hnew drill · horizontalHibernia Resources IV, LLCAPI 42-451-32927 · permit 091364831.53605, -100.72241drilling began 2026-03-04 · 9,000 ft | Hibernia Resources IV, LLC | |||||
| 2025-12-18 | TURNER RANCH WEST 2Hnew drill · horizontalHibernia Resources IV, LLCAPI 42-451-32926 · permit 091214031.55162, -100.74950drilling began 2026-01-20 · 9,000 ft | Hibernia Resources IV, LLC | |||||
| 2025-12-18 | TURNER RANCH WEST 1Hnew drill · horizontalHibernia Resources IV, LLCAPI 42-451-32925 · permit 091213931.55165, -100.74959drilling began 2026-01-19 · 9,000 ft | Hibernia Resources IV, LLC | |||||
| 2025-11-14 | CATHODIC PROTECTION 32new drill · verticalAtmos Pipeline - TexasAPI 42-451-32924 · permit 091139731.52309, -100.36940550 ft | Atmos Pipeline - Texas | |||||
| 2025-08-08 | MIDWAY UNIT 1Hnew drill · horizontalMoriah Operating,llcAPI 42-451-32923 · permit 090973431.61817, -100.75230drilling began 2025-09-12 · 7,500 ft | Moriah Operating,llc | |||||
| 2025-08-08 | GUADALCANAL UNIT 1Hnew drill · horizontalMoriah Operating,llcAPI 42-451-32922 · permit 090973231.61816, -100.75214drilling began 2025-09-27 · 7,500 ft | Moriah Operating,llc | |||||
| 2025-01-17 | CIRCLE MAKER 2Hnew drill · horizontalSixess Energy, LLCAPI 42-451-32921 · permit 090517731.63936, -100.68136drilling began 2025-03-25 · 8,000 ft | Sixess Energy, LLC | |||||
| 2024-10-11 | BUD 1new drill · verticalHW Operating, LLCAPI 42-451-32920 · permit 090318231.10898, -100.18698drilling began 2024-10-17 · 7,200 ft | HW Operating, LLC | |||||
| 2024-09-06 | INEZ MARIE UNIT 1Hnew drill · horizontalMoriah Operating,llcAPI 42-451-32919 · permit 090246431.61815, -100.73864drilling began 2024-10-20 · 8,000 ft | Moriah Operating,llc | |||||
| 2024-07-25 | OPPENHEIMER 1new drill · verticalMoriah Operating,llcAPI 42-451-32918 · permit 090147531.63549, -100.744927,500 ft | Moriah Operating,llc | |||||
| 2024-05-15 | GRACE 7 DEMERE 4recompletion · verticalSixess Energy, LLCAPI 42-451-32769 · permit 089965031.64759, -100.67718drilling began 2012-12-06 · 8,000 ft | Sixess Energy, LLC | |||||
| 2024-04-26 | JAMES UNIT 1Hnew drill · horizontalMoriah Operating,llcAPI 42-451-32917 · permit 089918631.61733, -100.72792drilling began 2024-06-09 · 8,000 ft | Moriah Operating,llc | |||||
| 2024-01-30 | JJE 1WDnew drill · verticalMoriah Operating,llcAPI 42-451-32916 · permit 089687231.61966, -100.74528drilling began 2024-03-06 · 4,500 ft | Moriah Operating,llc | |||||
| 2023-10-06 | JOHN WICK 2new drill · verticalFossil Petroleum LLCAPI 42-451-32915 · permit 089429731.25518, -100.52984drilling began 2023-11-10 · 6,800 ft | Fossil Petroleum LLC | |||||
| 2023-09-22 | MOZELLE UNIT 1Hnew drill · horizontalMoriah Operating,llcAPI 42-451-32914 · permit 089330031.61968, -100.74489drilling began 2023-10-07 · 8,000 ft | Moriah Operating,llc |
A permit is permission to drill, not a well. Source: Railroad Commission of Texas drilling permit files.
Year by year
Drilling permits issued in Tom Green County, by year
| Year | Permits issued |
|---|---|
| 2026 so far | 8 |
| 2025 | 6 |
| 2024 | 6 |
| 2023 | 2 |
Counted from the permit files we hold, which start in 2023; that first year may be partial. Source: Railroad Commission of Texas drilling permit files.
The latest
The most recent records
| Date | What, who and where |
|---|---|
| 2026-11-05 | Permit issued: Hibernia Resources IV, LLCWARDLAW B · A-1790 · permit 0919724 |
| 2026-11-05 | Permit issued: Hibernia Resources IV, LLCWARDLAW C · A-1790 · permit 0919727 |
| 2026-10-08 | Permit issued: Moriah Operating,llcMIDWAY UNIT · A-8241 · permit 0919044 |
| 2026-10-07 | Permit issued: Moriah Operating,llcBOUGAINVILLE UNIT · A-8241 · permit 0919041 |
| 2026-06-12 | Completed: Hibernia Resources IV, LLCTURNER RANCH WEST · A-915 · permit 0912139 |
| 2026-06-12 | Completed: Hibernia Resources IV, LLCTURNER RANCH WEST · A-915 · permit 0912140 |
| 2026-05-26 | Completed: Hibernia Resources IV, LLCTURNER RANCH WEST · A-915 |
| 2026-05-16 | Completed: Hibernia Resources IV, LLCWARDLAW A · A-1790 · permit 0913648 |
| 2026-05-04 | Permit issued: Tischer Energy, LLCWHITEHEAD · A-8644 · permit 0915286 |
| 2026-05-01 | First production: Hibernia Resources IV, LLCWardlaw A · A-1790 · permit 0913648 |
| 2026-04-08 | Permit issued: Moriah Operating,llcCORAL SEA UNIT · A-5090 · permit 0914541 |
| 2026-04-08 | Permit issued: Moriah Operating,llcTARAWA UNIT · A-8241 · permit 0914535 |
| 2026-03-13 | Completed: Hibernia Resources IV, LLCTURNER RANCH WEST · A-913 |
| 2026-03-01 | First production: H&P Oil & Gas LLCWinterbotham "H" |
| 2026-03-01 | First production: Trek Resources, Inc.Duff, A.h. Estate |
Follow it
Watch Tom Green County, or one abstract
What do you want to follow?
Where the land is. Your deed or lease names it.
For example A-1119, or Bush, or T&P 38. Your deed or the tax bill has it.
Other counties
Drilling activity in other counties
Related
Related
- ToolTexas well watchPermit, completion, first production and when the first check is due.
- ToolIs this buyout offer fair?The offer as months of your income, what the acres mean, and the questions to ask.
- ToolIs this lease offer good?Bonus and royalty against the county, and a scan of the lease's clauses.
- Texas dataTexas operator changesWho took over whose leases in the last 24 months.
- ToolLate payment interestDeadlines and the interest a late payment earns.
- Texas dataTexas oil and gas atlas254 counties, every lease, operator and field.
FAQ
Questions people ask
How many wells were permitted in Tom Green County in the last year?
The Railroad Commission issued 10 drilling permits in Tom Green County in the twelve months to November 5, 2026, and recorded 7 completions and 5 first-production reports. A permit is permission to drill, not a well.
How do I get an alert when a permit is issued near my land in Tom Green County?
Choose your abstract on this page, or the whole county, and sign in. You get one email a week, only when something new is recorded after you sign up. The alert says whether an event is on an interest in your Mineral File, on a place you follow, or only nearby.
When is my first royalty check due after a new well?
Natural Resources Code section 91.402(a) says on or before 120 days after the end of the month of first sale of production from the well. The state's first-production month is the closest public marker, so the date on this page is the earliest, not a certainty.
Got a new well on your land?
The first check is due within 120 days after the end of the month of first sale.
Sources
Primary sources, opened on 29 September 2026. Statute text is the current version on statutes.capitol.texas.gov.