The Hidalgo field's leases are in Hidalgo County, outlined.
The State’s records hold no located well for this field, so the map shows the counties its leases are in.
Texas gas fieldField 41078806District 04Through August 2026
Hidalgo (6500)Hidalgo County
The Hidalgo field sold 66.9 million cubic feet of gas and 279 barrels of oil in the last 12 months, from 1 lease.
- Gas, last 12 months
- 66.9 million cu ft
- Oil, last 12 months
- 279 bbl
- Producing leases
- 1
- Operator
- 1
- County
- 1
The story, from 404 months of reports
Gas has made more than oil every full year
Hidalgo (6500) is a field of one producing lease in Hidalgo County, and BZG E&P LLC runs it now. The lease is the Kelly, J. C., Unit, lease number 010828. Its first report in January 1993 names South Texas Limited Partnership as operator.
It made more of the field's output than oil in every full calendar year from 1993 to 2025, counted in barrels of oil equivalent. The biggest full calendar year was 1994, with 326 bbl of oil and 102,373 mcf of gas.
Oil stayed small. It reached 575 bbl in 1999 and was 0 bbl in 2009. Gas was 25,576 mcf in 2024 and 22,228 mcf in 2025. The field has one gas well and no horizontal wells.
Not a forecast, not reserves.
Key moments
- 1994Biggest full calendar year: 326 bbl oil, 102,373 mcf gas.
- 1999Oil reached 575 bbl, with 83,994 mcf gas that year.
- 2009Oil recorded 0 bbl; gas was 79,729 mcf.
- 2011Oil rose to 157 bbl after 4 bbl in 2010.
- 2024Gas dropped to 25,576 mcf from 56,631 the year before.
SourceRailroad Commission production reports for every lease filed under field 41078806, January 1993 to August 2026. What the field has sold. Not a forecast, not reserves. Reported through August 2026.
Where the field sits
Wells and drilling locations
No mapped well or permit location is on file for this field.
SourceRailroad Commission well locations and drilling permits. Checked for the Hidalgo field. Record dated November 13, 2026. Roll-up counted November 18, 2026.
Watch Private covers the land around yours: it tells you the day a permit or a frac lands within a mile.See Watch Private
From each well's Railroad Commission recordNew
How deep the wells go
A field is a body of rock, not a place on the map. The field roll-up supplies no frac disclosure depth for the Hidalgo's wells, so this section reads each well's own Railroad Commission records. Each tick is one well's total depth on its completion record, shallowest first. The one well on its leases is not on record as sideways, but the public record gives no path for it either, so it is not drawn as a line. A total depth is how far the hole runs, measured along it; a hole that leans or turns reaches less deep than that.
One well has a total depth on record: 6,803 feet as filed. No path is on record for it, so it is a tick at its depth, not a line.
feet: the well's completed total depth on record, along the hole as filed. That is 1.29 miles of hole.
well has a completed total depth on record: every well on the field's leases.
Why no rock names: the State's well records give a well's total depth in feet and file the well under its field, not under the rock layer it produces from. So the drawing marks depths, never formations.
SourcesCompleted depth: the total depth on each well's own Railroad Commission well record, matched by API number whatever lease lists the well, one per API number, in whole feet as filed. A total depth is measured along the hole; it is not a true vertical depth, and none has been loaded here for these wells. Completed March 18, 1957 (the earliest completion date on the well's record). Path: no well here is on record as sideways or has a bottom hole on file, and no record on file gives a path for these wells. 1 of the field's 1 well has a completed total depth on record; a well without one is not drawn.
For mineral owners, from the state record
What Hidalgo owners ask
- 01What is the Hidalgo field?
- Hidalgo (6500) is the name the Railroad Commission files these leases under: field 41078806, district 04. The State files every lease under a field. The field on your statement names the rock your wells produce from, not the town they are near.
- Source: Railroad Commission of Texas field list, field 41078806, district 04.
- How deep the wells go
- 02Is my lease in the Hidalgo?
- 1 lease reports to this field, in Hidalgo County. A lease can report to two fields when its wells reach different rock, and then it has a page under each. Search the lease name on your check stub to see which fields it reports to.
- Source: Railroad Commission production reports, field of record for each lease.
- Find my lease
- 03Who pays royalties in the Hidalgo?
- 1 operator reported production from the field in the last 12 months. The one that pays you is the company named on your check stub. BZG E&P LLC runs the field's one producing lease.
- Source: Railroad Commission production reports, operator of record.
- See the operator
- 04Who runs this field now, and who ran it at the start?
- BZG E&P LLC is the only operator on the record now. It runs the one producing lease, the Kelly, J. C., Unit, and its one gas well. The first report in January 1993 names South Texas Limited Partnership as the operator of that lease.
- 05Why is gas the larger product in this field?
- Gas made more of the field's output than oil in every full calendar year from 1993 to 2025, counted in barrels of oil equivalent. Oil was 0 bbl in 2009, and gas was 79,729 mcf that year.
- Gas royalty calculator
- 06Is there more than one lease in this field?
- No. The field record shows one producing lease, Kelly, J. C., Unit, lease number 010828, in Hidalgo County. It has one well, a gas well, and no horizontal wells.
- Unit decimal checker
- 07How much gas has the field produced in recent full years?
- Gas was 56,631 mcf in 2023, 25,576 mcf in 2024 and 22,228 mcf in 2025. These are full calendar years. 2026 has 7 months so far, with 38,733 mcf of gas.
- Royalty calculator
404 months against seven other recordsNew
Every month since January 1993, and what else happened that month
The whole field is the line on top. Under it, on the same clock: the weather, the price, how many leases reported, new wells, takeovers, State cut-offs and leases that went silent. Move across it.
Gas averaged $2.54 an mcf · 1 lease reporting
- No public record explains this drop.
- No storm, no State cut-off, no takeover and no market price fall on record this month.
Move the pointer or drag across the chart. The numbered buttons jump to each month.
Monthly gas sold from the Hidalgo (6500) field since January 1993, with the record tracks beneath it on the same clock. 404 months from January 1993 to August 2026. The most in one month: 12,029 mcf, December 2010. The newest month: 5,985 mcf. 25 months with nothing reported. Moments marked: 1, Jan 1994; 2, Jan 2005; 3, Jul 2010; 4, Jul 2012; 5, Jul 2022; 6, Jun 2024.
SourcesProduction, leases, new wells, takeovers, cut-offs and silent leases: Railroad Commission of Texas. Weather: NOAA Storm Events (file dated Oct 26, 2026) and NOAA daily county lows observed through Feb 21, 2026. Prices: U.S. Energy Information Administration (WTI for oil, Henry Hub for gas). Nothing on record in these months for: new wells and cut-offs. A record in the same month is not proof of a cause. Reported through August 2026. Roll-up counted November 18, 2026.
Royalty Watch tells you the month your own lease starts to drop, with the records from that month.See Royalty Watch
34 years of state records, 1993 to 2026
Sold since January 1993
$9.6 million
What the field's oil and gas sold for at each month's public prices, before tax and the operators' deductions.
- Oil sold
- 6,079barrels
- Gas sold
- 2.41 billioncubic feet
- Best year
- 2008$733,000 sold
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 1993 | $6,000 | $146,000 | $153,000 |
| 1994 | $5,000 | $193,000 | $199,000 |
| 1995 | $6,000 | $155,000 | $162,000 |
| 1996 | $8,000 | $224,000 | $232,000 |
| 1997 | $11,000 | $238,000 | $249,000 |
| 1998 | $5,000 | $146,000 | $152,000 |
| 1999 | $10,000 | $191,000 | $201,000 |
| 2000 | $11,000 | $381,000 | $393,000 |
| 2001 | $7,000 | $333,000 | $340,000 |
| 2002 | $9,000 | $247,000 | $257,000 |
| 2003 | $1,000 | $477,000 | $478,000 |
| 2004 | $3,000 | $496,000 | $499,000 |
| 2005 | $5,000 | $713,000 | $718,000 |
| 2006 | $6,000 | $547,000 | $553,000 |
| 2007 | $1,000 | $569,000 | $570,000 |
| 2008 | $6,000 | $726,000 | $733,000, sold the most |
| 2009 | $0 | $313,000 | $313,000 |
| 2010 | $0 | $273,000 | $273,000 |
| 2011 | $14,000 | $370,000 | $384,000 |
| 2012 | $1,000 | $169,000 | $171,000 |
| 2013 | $0 | $255,000 | $255,000 |
| 2014 | $1,000 | $285,000 | $286,000 |
| 2015 | $0 | $150,000 | $150,000 |
| 2016 | $3,000 | $168,000 | $171,000 |
| 2017 | $4,000 | $190,000 | $195,000 |
| 2018 | $2,000 | $201,000 | $203,000 |
| 2019 | $0 | $162,000 | $162,000 |
| 2020 | $5,000 | $119,000 | $124,000 |
| 2021 | $11,000 | $221,000 | $233,000 |
| 2022 | $23,000 | $308,000 | $331,000 |
| 2023 | $24,000 | $145,000 | $169,000 |
| 2024 | $12,000 | $51,000 | $63,000 |
| 2025 | $3,000 | $83,000 | $87,000 |
| 2026, to August | $18,000 | $174,000 | $192,000 |
For research and teaching
Royalty Clerk. “Hidalgo (6500) field, Texas.” Data through August 2026, from Railroad Commission of Texas filings. royaltyclerk.com/texas/fields/hidalgo-6500-41078806.
SourcesRailroad Commission Production Data Query, every monthly report since January 1993. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves. Reported through August 2026.
1 producing lease
Which lease makes up this field
The lease, its operator and county, and what else the records hold for it.
| Lease | Operator | County | Gas soldmcf, 12 months to Aug 2026 | Changeon the 12 before | 24 months | Also on record |
|---|---|---|---|---|---|---|
| KELLY, J. C., UNITBZG E&P LLC · Hidalgo | BZG E&P LLC | Hidalgo | 66,946 mcf | 15 silent months, 2024Lower tax |
Showing 1 of 1.
Search every Texas leaseSourceTexas Railroad Commission Production Data Query, field 41078806, through August 2026, file dated Oct 20, 2026.
1 operator, one county
Who runs this field's lease now
BZG E&P LLC operates every lease that reported gas in the last 12 months, all in Hidalgo County.
By gas in the last 12 months
- 1BZG E&P LLC66,946mcf1 lease · 100% of the field's gas · Hidalgo
SourceTexas Railroad Commission Production Data Query, operator of record for each lease, through August 2026. Record dated October 20, 2026.
Gas prices and taxNew
The State approved a lower tax on 1 of the 1 leases
an mcf, Henry Hub, the average of the 12 months through August 2026, up 14.3% on the 12 before.
The tax office's price for each lease of this field shows here once the Comptroller's records for it arrive. Leases sell at different points and qualities, so their prices differ from the market for ordinary reasons too.
Lower tax approvals in this field
- LOW PRODUCING WELLS
- 1 lease
- Newest approval
- December 2012
100% of the field's producing leases
On those leases the tax line on a statement should show the lower rate. Each lease page says which wells and until when.
Henry Hub, the 12 months through August 2026
No operator here reports a price to investors on file.
Not on file here yet. It shows once the Comptroller's records for this field arrive.
The price on your own check stub, set beside these three. Check my statement
SourcesMarket: U.S. Energy Information Administration, Henry Hub. Tax approvals: Texas Comptroller. A lease shows only where the Comptroller's records have arrived. Reported through October 2026. Roll-up counted November 18, 2026.
Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus
Who buys the gasNew
Who buys the field's gas
The State lists who buys from each lease. Company filings list who owns whom. Each bar is one operator's gas allocated to its current buyer rows, split by buyer. Each lease's reported production over the field's last 12 months is allocated by the buyer's percent on the Form P-4; where no percent is filed, the lease's current buyers are given equal shares, an estimate. This is an allocation, not a sales record or a metered volume: where a lease has some percents filed and some missing, its allocations can add to more than its production. A lease with no current buyer on file is not counted, so these shares are of the 66,946 mcf allocated across current buyer rows, not of the whole field.
No company filing on file here names a buyer and its operator in the same company, so whether they share an owner is unknown, not none. Buyers as of the Form P-4 record dated Oct 24, 2026.
SourcesBuyers and gatherers: Railroad Commission Form P-4 current purchaser rows, with each lease's reported production over the last 12 months (Railroad Commission production reports) allocated by the buyer's filed percent, or an equal split of the lease where none is filed; only gas on leases with a current buyer on file is counted. An allocation, not a sales record. Ownership: U.S. Securities and Exchange Commission filings and State organization reports. Record dated October 24, 2026. Roll-up counted November 18, 2026.
Royalty Watch tells you the day the buyer of your oil or gas changes.See Royalty Watch
Night observations
Heat seen from space and flaring reported
No matched night observations on file for this field's leases; coverage unverified, so this is not a finding of no heat.
SourceNOAA open data: VIIRS active fire readings at night from NOAA-20, NOAA-21 and Suomi NPP (a GOES-East reading alone never counts as a night), and Railroad Commission production reports. Checked for the Hidalgo field. Record dated November 16, 2026. Roll-up counted November 18, 2026.
Watch Plus checks whether you were paid on gas in the months heat was seen at your lease.See Watch Plus
Well stages
Wells between permit and first production
A comparison of permits, drilling and fracs is unavailable for this field. No drilling permit for this field is among the State permit records read here.
SourceRailroad Commission drilling permits and FracFocus. Checked for the Hidalgo field. Source date unavailable. Roll-up counted November 18, 2026.
Royalty Watch tells you the day a well on your lease moves to its next stage.See Royalty Watch
Do your Hidalgo checks match the State?
Own minerals here? Add your leases to My leases and see your share of every month.
Example
A whole month was never paid
The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.
Ask Operator B's owner relations: is that month held in suspense after the change of operator?
$2,277oil and gas
A sample finding, from our example check.
Around this field
Nearby
Fields nearby
- Javelina (Vicksburg Cons.)179 leases
- McAllen Ranch (Vksbg L-V, N Cons116 leases
- McAllen Ranch (Vksbg P-V,S Cons)52 leases
- McAllen-Pharr (Consolidated)44 leases
- Tabasco (Consolidated)40 leases
Related pages
- BZG E&P LLCBZG E&P LLC runs this field's one lease and its gas well.
- Hidalgo CountyHidalgo County holds this field's only producing lease.
- Kelly, J. C., UnitOldest producing lease here, with first report in January 1993.
More
- Texas fields, A to ZEvery field with producing leases in Railroad Commission records.
- Check a stub against a leaseMatch the barrels and mcf on your stub to the state record.
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells, completions, cut-offs
- Texas Comptroller tax approvals
- U.S. Energy Information Administration prices
- NOAA storms and cold
- U.S. Census Bureau county shapes