Texas oil fieldField 44544333District 03Through August 2026
Inez Jameson (Navarro)Burleson County
The Inez Jameson field sold 1,149 barrels of oil in the last 12 months, from 3 leases.
In this photoBetroRusk EnergySurface spot, no path on record
The story, from 404 months of reports
Oil leads here, except in 2012 and 2013
Inez Jameson (Navarro) is an oil field in Burleson County with three leases and two operators. Oil made more of the field's output than gas in every full calendar year from 1993 to 2025 except 2012 and 2013. The biggest full calendar year was 2012, with 1,579 bbl of oil and 42,757 mcf of gas.
Betro, Inc. runs one producing lease here, and Rusk Energy Operating LLC runs two. Each company has 50.0% of the field's output, counted in barrels of oil equivalent. None of the four wells is horizontal.
Four leases reported in January 1993, when Austin Ridge Energy Corporation, Ferguson-Burns Leasing Co. and Heartland Resources, Inc. each reported one. One of those leases stopped before 2020. Simpson Et Al, lease 15042, is the oldest producing lease in the field, and Betro, Inc. runs it.
Not a forecast, not reserves.
Key moments
- 2004Leases reporting fell from four to three
- 2008Gas reached 3,064 mcf, with oil at 2,166 bbl
- 2012Biggest full calendar year: 42,757 mcf gas, 1,579 bbl oil
- 2014Oil made more than gas again, at 1,795 bbl
- 2020Gas fell to 759 mcf from 1,592 mcf in 2019
- 2024Gas reached 351 mcf after 2 mcf in 2023
SourceRailroad Commission production reports for every lease filed under field 44544333, January 1993 to August 2026. What the field has sold. Not a forecast, not reserves. Reported through August 2026.
Where the field sits
3 wells in Burleson County
Every well the State files under the Inez Jameson, drawn where its records put it. A well with a recorded bottom hole has a line to it. Wells with only a surface location appear as points. Colour the map by the company that operates each well, by how deep it runs, or see where drilling is headed.
BetroRusk Energy
2 operators. Each has a colour. Tap a pad to see whose it is, or pick a county.
About 2 miles from west to east
What is on the map
Drilling locations: counted from the map as it loads
Leases by county
Wells near a town
Open the full well map
- Drilling locations0Permits issued in the last two years
- Producing wells3On a lease reporting production now
- Not producing0Shut in, inactive or no lease on record
- Plugged0The state's wellbore record says plugged
Each dot is a well on a lease the Railroad Commission lists in the Inez Jameson (Navarro) field, where its map puts it, or a drilling permit filed for the field in the last 24 months. Wells of other fields are not on this map. The picture is about 8 miles across. The white counties are the ones with a well or drilling permit of the field on the map. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines, US Census Bureau county outlines.
Use this map on your site
You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.
<a href="https://royaltyclerk.com/texas/fields/inez-jameson-navarro-44544333"><img src="https://royaltyclerk.com/maps/field-wells/inez-jameson-navarro-44544333.svg" alt="Map of the wells of the Inez Jameson (Navarro) field, Texas: 3 wells and 0 recent drilling locations, in a picture about 8 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/fields/inez-jameson-navarro-44544333">Oil and gas wells of the Inez Jameson (Navarro) field, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>SourcesWells, well paths, operators, permits and drilling dates: Railroad Commission of Texas. Map depth bands: true vertical depth from FracFocus. County lines: U.S. Census Bureau. The dashed line is drawn around the wells; the State keeps no outline for a field. Record dated November 16, 2026. Roll-up counted November 18, 2026.
Watch Private covers the land around yours: it tells you the day a permit or a frac lands within a mile.See Watch Private
From each well's Railroad Commission recordNew
Total depth along the wellbore
Total depth measures the full length of the drilled hole, including bends and horizontal sections. Each tick is one well's total depth on its completion record, shallowest first. The field summary has no true vertical depth from FracFocus.
3 wells have a total depth on record, from 3,418 to 3,530 feet as filed; the middle of them is 3,470 feet. Each tick is one well.
feet: the middle of the completed total depths on record, along the hole as filed. That is 0.66 miles of hole.
feet: the deepest completed total depth on record.
of the field's 4 wells have a completed total depth on record.
Why no rock names: the State's well records give a well's total depth in feet and file the well under its field, not under the rock layer it produces from. So the drawing marks depths, never formations.
SourcesCompleted depth: the total depth on each well's own Railroad Commission well record, matched by API number whatever lease lists the well, one per API number, in whole feet as filed. Completed December 19, 1969 to November 8, 1981 (the earliest completion date on each well's record). 3 of the field's 4 wells have a completed total depth on record; a well without one is not drawn.
For mineral owners, from the state record
What Inez Jameson owners ask
- 01What is the Inez Jameson field?
- Inez Jameson (Navarro) is the name the Railroad Commission files these leases under: field 44544333, district 03. The State files every lease under a field. The field on your statement names the rock your wells produce from, not the town they are near.
- Source: Railroad Commission of Texas field list, field 44544333, district 03.
- See wellbore depths
- 02Is my lease in the Inez Jameson?
- 3 leases report to this field, in Burleson County. A lease can report to two fields when its wells reach different rock, and then it has a page under each. Search the lease name on your check stub to see which fields it reports to.
- Source: Railroad Commission production reports, field of record for each lease.
- Find my lease
- 03Who pays royalties in the Inez Jameson?
- Rusk Energy Operating LLC2Betro, Inc.1
- 2 operators reported production from the field in the last 12 months. The one that pays you is the company named on your check stub. Rusk Energy Operating LLC runs the most leases, 2 of the 3.
- Source: Railroad Commission production reports, operator of record.
- See all 2 operators
- 04Why did my Inez Jameson check change?
- Oil sold▲ 6.49%Oil price▲ 10.4%
- Across the field, oil sold is up 6.49% on the 12 months before and the oil price is up 10.4%. A check can move with the field's volume and the price with nothing wrong on the lease. The statement check tells the two apart.
- Source: Railroad Commission production reports; U.S. Energy Information Administration prices.
- Why is my check lower?
- 05Who runs this field now?
- Betro, Inc. runs one producing lease and Rusk Energy Operating LLC runs two. Each company has 50.0% of the field's output, counted in barrels of oil equivalent. Both companies reported oil in the last 12 months.
- 06How much gas did this field make in its biggest full calendar year?
- The biggest full calendar year was 2012. The field made 42,757 mcf of gas and 1,579 bbl of oil that year. Gas made more than oil in 2012 and in 2013, the only full years when it did.
- 07Are the leases in this field old or new?
- Four leases reported in January 1993, and three still produce. Simpson Et Al, lease 15042, is the oldest producing lease in the field. Betro, Inc. runs it.
- Mineral interest finder
- 08Are any wells in this field horizontal?
- 0 located, unplugged wells are recorded as horizontal. 3 other located, unplugged wells have no filed path classification.
- Railroad Commission well and completion records. Roll-up counted November 18, 2026.
- See the mapped wells
404 months against seven other recordsNew
Every month since January 1993, and what else happened that month
The whole field is the line on top. Under it, on the same clock: the weather, the price, how many leases reported, new wells, takeovers, State cut-offs and leases that went silent. Move across it.
Oil averaged $83.90 a barrel · 3 leases reporting
- PriceThe oil price fell 19.8% the month before, to $80.46 a barrel.
Move the pointer or drag across the chart. The numbered buttons jump to each month.
Monthly oil sold from the Inez Jameson (Navarro) field since January 1993, with the record tracks beneath it on the same clock. 404 months from January 1993 to August 2026. The most in one month: 592 barrels, January 1993. The newest month: 87 barrels. Moments marked: 1, Sep 1993; 2, Feb 1994; 3, Jun 1995; 4, Jul 1996; 5, Dec 1997; 6, Nov 1998.
SourcesProduction, leases, new wells, takeovers, cut-offs and silent leases: Railroad Commission of Texas. Weather: NOAA Storm Events (file dated Oct 26, 2026) and NOAA daily county lows observed through Feb 21, 2026. Prices: U.S. Energy Information Administration (WTI for oil, Henry Hub for gas). Nothing on record in these months for: new wells. A record in the same month is not proof of a cause. Reported through August 2026. Roll-up counted November 18, 2026.
Royalty Watch tells you the month your own lease starts to drop, with the records from that month.See Royalty Watch
34 years of state records, 1993 to 2026
Sold since January 1993
$3.4 million
What the field's oil and gas sold for at each month's public prices, before tax and the operators' deductions.
- Oil sold
- 65,237barrels
- Gas sold
- 90.4 millioncubic feet
- Best year
- 2012$267,000 sold
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 1993 | $92,000 | $0 | $92,000 |
| 1994 | $70,000 | $0 | $70,000 |
| 1995 | $67,000 | $0 | $67,000 |
| 1996 | $73,000 | $0 | $73,000 |
| 1997 | $70,000 | $0 | $70,000 |
| 1998 | $35,000 | $0 | $35,000 |
| 1999 | $45,000 | $0 | $45,000 |
| 2000 | $37,000 | $0 | $37,000 |
| 2001 | $25,000 | $0 | $25,000 |
| 2002 | $30,000 | $0 | $30,000 |
| 2003 | $57,000 | $0 | $57,000 |
| 2004 | $93,000 | $0 | $93,000 |
| 2005 | $106,000 | $0 | $106,000 |
| 2006 | $135,000 | $0 | $135,000 |
| 2007 | $154,000 | $3,000 | $157,000 |
| 2008 | $223,000 | $25,000 | $249,000 |
| 2009 | $93,000 | $14,000 | $107,000 |
| 2010 | $123,000 | $21,000 | $145,000 |
| 2011 | $158,000 | $23,000 | $181,000 |
| 2012 | $148,000 | $118,000 | $267,000, sold the most |
| 2013 | $160,000 | $61,000 | $221,000 |
| 2014 | $166,000 | $7,000 | $173,000 |
| 2015 | $78,000 | $4,000 | $82,000 |
| 2016 | $63,000 | $4,000 | $68,000 |
| 2017 | $78,000 | $4,000 | $83,000 |
| 2018 | $92,000 | $5,000 | $98,000 |
| 2019 | $78,000 | $4,000 | $82,000 |
| 2020 | $57,000 | $1,000 | $59,000 |
| 2021 | $86,000 | $2,000 | $88,000 |
| 2022 | $92,000 | $2,000 | $95,000 |
| 2023 | $104,000 | $0 | $104,000 |
| 2024 | $70,000 | $0 | $71,000 |
| 2025 | $77,000 | $0 | $77,000 |
| 2026, to August | $58,000 | $0 | $58,000 |
For research and teaching
Royalty Clerk. “Inez Jameson (Navarro) field, Texas.” Data through August 2026, from Railroad Commission of Texas filings. royaltyclerk.com/texas/fields/inez-jameson-navarro-44544333.
SourcesRailroad Commission Production Data Query, every monthly report since January 1993. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves. Reported through August 2026.
Lease output over 12 months
Which leases make up this field
Most reporting leases are in the smaller size groups. The bars show 3 leases that reported oil or gas during the 12 months through August 2026, grouped by oil output. Pick a lease in the table to highlight its group. The table draws from the 3 leases counted as currently producing based on recent state filings.
| Lease | Operator | County | Oil soldbarrels, 12 months to Aug 2026 | Changeon the 12 before | 24 months | Also on record |
|---|---|---|---|---|---|---|
| SIMPSON ET ALBetro, Inc. · Burleson | Betro, Inc. | Burleson | 575 | ▼ 6.81% | Nothing else | |
| DOSSRusk Energy Operating LLC · Burleson | Rusk Energy Operating LLC | Burleson | 359 | ▲ 22.1% | 2 silent months, 2025Buyer, officer in commonLower tax | |
| COFFIELD-RUSSELL UNITRusk Energy Operating LLC · Burleson | Rusk Energy Operating LLC | Burleson | 215 | ▲ 28.0% | 3 silent months, 2025Buyer, officer in commonLower tax |
Showing 3 of 3.
Search every Texas leaseSourceTexas Railroad Commission Production Data Query, field 44544333, through August 2026, file dated Oct 20, 2026.
2 operators, one county
Who has run this field, and in which county
Each box is one operator's oil from one county in the last 12 months, drawn to size. The two biggest operators keep the colours they have on the map.
By oil in the last 12 months
- 1Betro, Inc.575bbl1 lease · 50.0% of the field's oil · Burleson
- 2Rusk Energy Operating LLC574bbl2 leases · 50.0% of the field's oil · Burleson
SourceTexas Railroad Commission Production Data Query, operator of record for each lease, through August 2026. Record dated October 20, 2026.
Oil prices and taxNew
The State approved a lower tax on 2 of the 3 leases
a barrel, West Texas Intermediate, the average of the 12 months through August 2026, up 10.4% on the 12 before.
The tax office's price for each lease of this field shows here once the Comptroller's records for it arrive. Leases sell at different points and qualities, so their prices differ from the market for ordinary reasons too.
Lower tax approvals in this field
- LOW PRODUCING LEASES
- 2 leases
- Newest approval
- July 2021
66.7% of the field's producing leases
On those leases the tax line on a statement should show the lower rate. Each lease page says which wells and until when.
West Texas Intermediate, the 12 months through August 2026
No operator here reports a price to investors on file.
Not on file here yet. It shows once the Comptroller's records for this field arrive.
The price on your own check stub, set beside these three. Check my statement
SourcesMarket: U.S. Energy Information Administration, West Texas Intermediate. Tax approvals: Texas Comptroller. A lease shows only where the Comptroller's records have arrived. Reported through October 2026. Roll-up counted November 18, 2026.
Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus
Buyers and gatherersNew
2 leases with a gas purchaser on file
The filings name gas purchasers. Reported production and current purchaser allocations do not establish an operator share for the period shown.
Current Form P-4 filings and companies
Gas purchasers
2 leases across 2 current entries on Form P-4.
- BLM PIPELINE, INC. · 2 leases
Common ownership with the operator is unconfirmed in the company records checked.
Latest P-4 source dateOil gatherers
3 leases across 5 current entries on Form P-4.
- 4J ENERGY, LLC · 3 leases
- ENERGY TRANSFER MARKETING & TERM · 2 leases
Common ownership with the operator is unconfirmed in the company records checked.
Latest P-4 source dateGas purchasers buy casinghead gas or gas-well gas. Oil gatherers collect oil for transport. Each lease counts once in each role, even if several companies or gas products are listed. The company lists show up to five parties by lease count. A lease can appear under more than one company.
SourcesRailroad Commission of Texas, Form P-4. Counts measure distinct leases on current filings. Common ownership uses reviewed company filings. Latest P-4 source date .
Royalty Watch tells you the day the buyer of your oil or gas changes.See Royalty Watch
Seen from space, 2025New
No matched night observations on file for the field's leases
Weather satellites pass over Texas every night and record heat on the ground. No night observation in 2025 is matched to this field's leases on file here, and the satellites' coverage of these wells is unverified, so this is not a finding that there was no heat.
Where the field's gas went in 2025, as operators reported it
SourcesHeat: VIIRS active fire readings at night from NOAA-20, NOAA-21 and Suomi NPP (NOAA open data), matched to a lease's wells; a GOES-East reading alone never counts as a night. Satellite record read to Nov 17, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count is a floor. The satellite records heat. It does not say what burned. Roll-up counted November 18, 2026.
Watch Plus checks whether you were paid on gas in the months heat was seen at your lease.See Watch Plus
Well stages
Wells between permit and first production
A comparison of permits, drilling and fracs is unavailable for this field. No drilling permit for this field is among the State permit records read here.
SourceRailroad Commission drilling permits and FracFocus. Checked for the Inez Jameson field. Source date unavailable. Roll-up counted November 18, 2026.
Royalty Watch tells you the day a well on your lease moves to its next stage.See Royalty Watch
Do your Inez Jameson checks match the State?
Own minerals here? Add your leases to My leases and see your share of every month.
Example
A whole month was never paid
The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.
Ask Operator B's owner relations: is that month held in suspense after the change of operator?
$2,277oil and gas
A sample finding, from our example check.
Around this field
Nearby
Fields nearby
- Giddings (Austin Chalk-3)345 leases
- Giddings (Eagleford)251 leases
- Aguila Vado (Eagleford)108 leases
- Hooker Creek (Navarro A)31 leases
- Giddings (Buda)29 leases
Towns
- Rockdale3 wells within 10 miles
Operators here
- Betro, Inc.1 lease
- Rusk Energy Operating LLC2 leases
Related pages
- Simpson Et AlOldest producing lease here, first monthly report January 1993.
- Betro, Inc.Runs the oldest producing lease here and 50.0% of field output.
- Rusk Energy Operating LLCRuns two producing leases here, with 50.0% of field output.
- Burleson CountyHolds all three producing leases in this field.
More
- Texas fields, A to ZEvery field with producing leases in Railroad Commission records.
- Check a stub against a leaseMatch the barrels and mcf on your stub to the state record.
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells, completions, cut-offs
- Texas Comptroller tax approvals
- U.S. Energy Information Administration prices
- NOAA storms and cold
- NOAA open data VIIRS night heat (NOAA-20, NOAA-21, Suomi NPP)
- U.S. Geological Survey photo from the air
- U.S. Census Bureau county shapes