Texas oil fieldField 73933420District 08Through July 2026
Quito, West (Cherry Canyon)Ward County
The Quito, West field sold 412 barrels of oil and 3.43 million cubic feet of gas in the last 12 months, from 1 lease.
In this photoSeaboardOther operatorsSurface spot, no path on recordHollow: plugged
The story, from 403 months of reports
How Quito, West turned from oil to gas in 2024
Quito, West (Cherry Canyon) turned from oil to gas in 2024, after oil had led the field from 2010. The field has four leases in Ward County, and only one reports output now. Seaboard Operating Co. runs that one producing lease and holds 100.0% of the field's output, counted in barrels of oil equivalent. The field's biggest full calendar year was 2005, with 19,970 barrels of oil and 569,634 mcf of gas.
Leases reporting fell from five in 2011 to one in 2024. Gas has made more of the field's output than oil in each full calendar year since 2024. One drilling permit was filed in the last 12 months, and it is not horizontal.
Not a forecast, not reserves.
Key moments
- 2005Biggest full calendar year: 19,970 bbl oil and 569,634 mcf gas.
- 2010Oil made more of the output than gas again, ending gas's lead.
- 2018Oil fell to 2,349 bbl from 6,036 the year before.
- 2023Only two leases reported output, down from five in 2011.
- 2024Gas passed oil and has led every full calendar year since.
SourceRailroad Commission production reports for every lease filed under field 73933420, January 1993 to July 2026. What the field has sold. Not a forecast, not reserves. Reported through July 2026.
Where the field sits
11 wells in Ward County
Every well the State files under the Quito, West, drawn where its records put it. A well with a recorded bottom hole has a line to it. Wells with only a surface location appear as points. Colour the map by the company that operates each well, by how deep it runs, or see where drilling is headed.
Seaboard
1 operator. It has a colour. Tap a pad to see whose it is, or pick a county.
About 17 miles from west to east
What is on the map
Drilling locations: counted from the map as it loads
Leases by county
Wells on the wayNewest drilling permitsPut this map on your site
Open the full well map
- Drilling locations1Permits issued in the last two years
- Producing wells1On a lease reporting production now
- Not producing1Shut in, inactive or no lease on record
- Plugged9The state's wellbore record says plugged
Each dot is a well on a lease the Railroad Commission lists in the Quito, West (Cherry Canyon) field, where its map puts it, or a drilling permit filed for the field in the last 24 months. Wells of other fields are not on this map. The picture is about 30 miles across. The white counties are the ones with a well or drilling permit of the field on the map. Sources: Railroad Commission of Texas well layers and drilling permit files, US Census Bureau county outlines, town points from GeoNames (CC BY 4.0).
Use this map on your site
You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.
<a href="https://royaltyclerk.com/texas/fields/quito-west-cherry-canyon-73933420"><img src="https://royaltyclerk.com/maps/field-wells/quito-west-cherry-canyon-73933420.svg" alt="Map of the wells of the Quito, West (Cherry Canyon) field, Texas: 11 wells and 1 recent drilling location, in a picture about 30 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/fields/quito-west-cherry-canyon-73933420">Oil and gas wells of the Quito, West (Cherry Canyon) field, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>SourcesWells, well paths, operators, permits and drilling dates: Railroad Commission of Texas. Map depth bands: true vertical depth from FracFocus. County lines: U.S. Census Bureau. The dashed line is drawn around the wells; the State keeps no outline for a field. Record dated November 20, 2026. Roll-up counted November 18, 2026.
Watch Private covers the land around yours: it tells you the day a permit or a frac lands within a mile.See Watch Private
From each well's Railroad Commission recordNew
Total depth along the wellbore
Total depth measures the full length of the drilled hole, including bends and horizontal sections. Each tick is one well's total depth on its completion record, shallowest first. The field summary has no true vertical depth from FracFocus.
11 wells have a total depth on record, from 6,330 to 6,700 feet as filed; the middle of them is 6,592 feet. Each tick is one well.
feet: the middle of the completed total depths on record, along the hole as filed. That is 1.25 miles of hole.
feet: the deepest completed total depth on record.
wells have a completed total depth on record: every well on the field's leases.
Why no rock names: the State's well records give a well's total depth in feet and file the well under its field, not under the rock layer it produces from. So the drawing marks depths, never formations.
SourcesCompleted depth: the total depth on each well's own Railroad Commission well record, matched by API number whatever lease lists the well, one per API number, in whole feet as filed. Completed November 21, 1979 to August 17, 2007 (the earliest completion date on each well's record). 11 of the field's 11 wells have a completed total depth on record; a well without one is not drawn.
For mineral owners, from the state record
What Quito, West owners ask
- 01What is the Quito, West field?
- Quito, West (Cherry Canyon) is the name the Railroad Commission files these leases under: field 73933420, district 08. The State files every lease under a field. The field on your statement names the rock your wells produce from, not the town they are near.
- Source: Railroad Commission of Texas field list, field 73933420, district 08.
- See wellbore depths
- 02Is my lease in the Quito, West?
- 1 lease reports to this field, in Ward County. A lease can report to two fields when its wells reach different rock, and then it has a page under each. Another 3 leases are on record and not producing. Search the lease name on your check stub to see which fields it reports to.
- Source: Railroad Commission production reports, field of record for each lease.
- Find my lease
- 03Who pays royalties in the Quito, West?
- 1 operator reported production from the field in the last 12 months. The one that pays you is the company named on your check stub. Seaboard Operating Co. runs the field's one producing lease.
- Source: Railroad Commission production reports, operator of record.
- See the operator
- 04Why did my Quito, West check go down?
- Oil sold▼ 22.0%Oil price▲ 6.53%Gas sold▼ 66.1%Gas price▲ 17.5%
- Across the field, oil sold is down 22.0% on the 12 months before and the oil price is up 6.53%. In the same months gas sold is down 66.1% and the gas price up 17.5%. A check can move with the field's volume and the price with nothing wrong on the lease. The statement check tells the two apart.
- Source: Railroad Commission production reports; U.S. Energy Information Administration prices.
- Why is my check lower?
- 05Who runs this field now?
- Seaboard Operating Co. is the only operator on the field's current reports. It runs the one producing lease, in Ward County. Its share of the field's output, counted in barrels of oil equivalent, is 100.0%.
- 06How many leases are in this field, and which is the oldest producing one?
- The field has four leases. The oldest producing lease is Melissa "A", lease 26962, operated by Seaboard Operating Co. Its monthly history runs back to January 1993.
- 07Who operated the leases when the record starts in January 1993?
- Simon, W. D. Oil Co. was the operator on the first report for all four leases on the record in January 1993. Later first reports show Seaboard Oil Company, Southwest Royalties, Inc., Hppc, Inc. and Shell Western E&P.
- 08Is there new drilling in this field?
- The field has one drilling permit in the last 12 months, and it is not horizontal. Its one well on a producing lease is also not horizontal.
403 months against seven other recordsNew
Every month since January 1993, and what else happened that month
The whole field is the line on top. Under it, on the same clock: the weather, the price, how many leases reported, new wells, takeovers, State cut-offs and leases that went silent. Move across it.
Oil averaged $80.46 a barrel · 1 lease reporting
- WeatherFlash flood, July 16.
- PriceThe oil price averaged $80.46 a barrel, down 19.8% on the three months before.
Move the pointer or drag across the chart. The numbered buttons jump to each month.
Monthly oil sold from the Quito, West (Cherry Canyon) field since January 1993, with the record tracks beneath it on the same clock. 403 months from January 1993 to July 2026. The most in one month: 2,257 barrels, February 2006. The newest month: 40 barrels. 1 month with nothing reported. Moments marked: 1, Jul 2005; 2, Apr 2006; 3, Jul 2006; 4, Jan 2007; 5, Aug 2009; 6, Nov 2016.
SourcesProduction, leases, new wells, takeovers, cut-offs and silent leases: Railroad Commission of Texas. Weather: NOAA Storm Events (file dated Oct 26, 2026) and NOAA daily county lows observed through Feb 21, 2026. Prices: U.S. Energy Information Administration (WTI for oil, Henry Hub for gas). Nothing on record in these months for: takeovers. A record in the same month is not proof of a cause. Reported through July 2026. Roll-up counted November 18, 2026.
Royalty Watch tells you the month your own lease starts to drop, with the records from that month.See Royalty Watch
34 years of state records, 1993 to 2026
Sold since January 1993
$24.4 million
What the field's oil and gas sold for at each month's public prices, before tax and the operators' deductions.
- Oil sold
- 206,430barrels
- Gas sold
- 2.08 billioncubic feet
- Best year
- 2005$5.9 million sold
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 1993 | $86,000 | $121,000 | $208,000 |
| 1994 | $75,000 | $84,000 | $160,000 |
| 1995 | $62,000 | $67,000 | $130,000 |
| 1996 | $63,000 | $61,000 | $125,000 |
| 1997 | $70,000 | $125,000 | $195,000 |
| 1998 | $47,000 | $108,000 | $155,000 |
| 1999 | $64,000 | $179,000 | $243,000 |
| 2000 | $98,000 | $251,000 | $350,000 |
| 2001 | $80,000 | $207,000 | $288,000 |
| 2002 | $109,000 | $190,000 | $300,000 |
| 2003 | $83,000 | $242,000 | $325,000 |
| 2004 | $438,000 | $569,000 | $1 million |
| 2005 | $1.1 million | $4.7 million | $5.9 million, sold the most |
| 2006 | $1 million | $1.4 million | $2.5 million |
| 2007 | $721,000 | $474,000 | $1.1 million |
| 2008 | $1.4 million | $1 million | $2.4 million |
| 2009 | $781,000 | $339,000 | $1.1 million |
| 2010 | $965,000 | $287,000 | $1.2 million |
| 2011 | $899,000 | $175,000 | $1 million |
| 2012 | $935,000 | $142,000 | $1 million |
| 2013 | $961,000 | $180,000 | $1.1 million |
| 2014 | $849,000 | $198,000 | $1 million |
| 2015 | $419,000 | $70,000 | $490,000 |
| 2016 | $358,000 | $66,000 | $425,000 |
| 2017 | $305,000 | $82,000 | $388,000 |
| 2018 | $154,000 | $35,000 | $190,000 |
| 2019 | $126,000 | $13,000 | $139,000 |
| 2020 | $73,000 | $2,000 | $76,000 |
| 2021 | $135,000 | $6,000 | $142,000 |
| 2022 | $154,000 | $10,000 | $165,000 |
| 2023 | $57,000 | $2,000 | $60,000 |
| 2024 | $38,000 | $9,000 | $48,000 |
| 2025 | $30,000 | $28,000 | $58,000 |
| 2026, to July | $21,000 | $6,000 | $28,000 |
For research and teaching
Royalty Clerk. “Quito, West (Cherry Canyon) field, Texas.” Data through July 2026, from Railroad Commission of Texas filings. royaltyclerk.com/texas/fields/quito-west-cherry-canyon-73933420.
SourcesRailroad Commission Production Data Query, every monthly report since January 1993. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves. Reported through July 2026.
1 producing lease
Which four leases make up this field
The lease, its operator and county, and what else the records hold for it.
| Lease | Operator | County | Oil soldbarrels, 12 months to Jul 2026 | Changeon the 12 before | 24 months | Also on record |
|---|---|---|---|---|---|---|
| MELISSA "A"Seaboard Operating Co. · Ward | Seaboard Operating Co. | Ward | 424 bbl | ▼ 22.0% | 30 silent months, 1994Lower tax |
Showing 1 of 1.
Search every Texas leaseSourceTexas Railroad Commission Production Data Query, field 73933420, through July 2026, file dated Oct 20, 2026. 3 more leases are on record and not producing.
1 operator, one county
Who has operated the leases in this field
Seaboard Operating Co. operates every lease that reported oil in the last 12 months, all in Ward County.
By oil in the last 12 months
- 1Seaboard Operating Co.412bbl1 lease · 100% of the field's oil · Ward
SourceTexas Railroad Commission Production Data Query, operator of record for each lease, through July 2026. Record dated October 20, 2026.
Oil prices and taxNew
The State approved a lower tax on 1 of the 1 leases
a barrel, West Texas Intermediate, the average of the 12 months through July 2026, up 6.53% on the 12 before.
The tax office's price for each lease of this field shows here once the Comptroller's records for it arrive. Leases sell at different points and qualities, so their prices differ from the market for ordinary reasons too.
Lower tax approvals in this field
- LOW PRODUCING LEASES
- 1 lease
- Newest approval
- June 2016
100% of the field's producing leases
On those leases the tax line on a statement should show the lower rate. Each lease page says which wells and until when.
West Texas Intermediate, the 12 months through July 2026
No operator here reports a price to investors on file.
Not on file here yet. It shows once the Comptroller's records for this field arrive.
The price on your own check stub, set beside these three. Check my statement
SourcesMarket: U.S. Energy Information Administration, West Texas Intermediate. Tax approvals: Texas Comptroller. A lease shows only where the Comptroller's records have arrived. Reported through October 2026. Roll-up counted November 18, 2026.
Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus
Buyers and gatherersNew
1 lease with a gas purchaser on file
The filings name gas purchasers. Reported production and current purchaser allocations do not establish an operator share for the period shown.
Current Form P-4 filings and companies
Gas purchasers
1 lease across 1 current entry on Form P-4.
- ENERGY TRANSFER COMPANY · 1 lease
Common ownership with the operator is unconfirmed in the company records checked.
Latest P-4 source dateOil gatherers
4 leases across 5 current entries on Form P-4.
- ENERGY TRANS CRUDE MARKETING LLC · 4 leases
- SUNOCO PTNRS. MKTG.&TERMINALS LP · 1 lease
Common ownership with the operator is unconfirmed in the company records checked.
Latest P-4 source dateGas purchasers buy casinghead gas or gas-well gas. Oil gatherers collect oil for transport. Each lease counts once in each role, even if several companies or gas products are listed. The company lists show up to five parties by lease count. A lease can appear under more than one company.
SourcesRailroad Commission of Texas, Form P-4. Counts measure distinct leases on current filings. Common ownership uses reviewed company filings. Latest P-4 source date .
Royalty Watch tells you the day the buyer of your oil or gas changes.See Royalty Watch
Seen from space, 2025New
No matched night observations on file for the field's leases
Weather satellites pass over Texas every night and record heat on the ground. No night observation in 2025 is matched to this field's leases on file here, and the satellites' coverage of these wells is unverified, so this is not a finding that there was no heat.
Where the field's gas went in 2025, as operators reported it
SourcesHeat: VIIRS active fire readings at night from NOAA-20, NOAA-21 and Suomi NPP (NOAA open data), matched to a lease's wells; a GOES-East reading alone never counts as a night. Satellite record read to Nov 16, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count is a floor. The satellite records heat. It does not say what burned. Roll-up counted November 18, 2026.
Watch Plus checks whether you were paid on gas in the months heat was seen at your lease.See Watch Plus
Permits, drilling and fracsNew
1 well on the way
The State approved 1 drilling location in this field in two years. These are the wells the stage records held between a permit and a first month of production on November 18, 2026, one dot for each, at the stage the records showed that day.
Approved, not started
None identified in these stage recordsDrilling started, no frac on record
Middle wait: 127 daysFracked, waiting on a report
None identified in these stage recordsCompletion filed, no production yet
None identified in these stage recordsSourcesPermits, drilling dates and completions: Railroad Commission of Texas. Frac dates: FracFocus chemical disclosure registry. Newest field permit issued Sep 29, 2025. Record dated November 17, 2026. Counted November 18, 2026.
Royalty Watch tells you the day a well on your lease moves to its next stage.See Royalty Watch
Do your Quito, West checks match the State?
Own minerals here? Add your leases to My leases and see your share of every month.
Example
A whole month was never paid
The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.
Ask Operator B's owner relations: is that month held in suspense after the change of operator?
$2,277oil and gas
A sample finding, from our example check.
Around this field
Nearby
Fields nearby
- Phantom (Wolfcamp)971 leases
- Sandbar (Bone Spring)57 leases
- Two Georges (Bone Spring)48 leases
- Collie (Delaware)47 leases
- Ward, South37 leases
Newest drilling permits
- JOHNSON 54-2-40 LOV 3DPDEH LLC · new drill · RRC permit 0910688 · approved Sep 29, 2025 · Loving County
Related pages
- Seaboard Operating Co.Seaboard Operating Co. runs the field's one producing lease and holds all its current output.
- Melissa "A"The field's oldest producing lease, lease 26962, has monthly history back to January 1993.
More
- Texas fields, A to ZEvery field with producing leases in Railroad Commission records.
- Check a stub against a leaseMatch the barrels and mcf on your stub to the state record.
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells, completions, cut-offs
- Texas Comptroller tax approvals
- U.S. Energy Information Administration prices
- FracFocus frac dates and depths
- NOAA storms and cold
- NOAA open data VIIRS night heat (NOAA-20, NOAA-21, Suomi NPP)
- U.S. Geological Survey photo from the air
- U.S. Census Bureau county shapes