Skip to content

Texas field · RRC field 90007830 · District 7C

Tillery (Strawn Lime)

3 producing leases run by 3 operators in 1 Texas county. The field reported 501 barrels of oil and 819 mcf of gas in the 12 months through Jul 2026.

Field dossier · 1 county

501bbl oil, last 12 months−32% vs prior year
Producing leases
3
Operators
3
Counties
1
Biggest operator
Lone Star Operations LLC

Own minerals in this field?

Upload a royalty check stub or a phone photo. We compare each month with the state numbers for your lease and tell you what to ask your operator.

Where the field sits

This county

Schleicher County: 3 producing leasesSchleicherTom GreenIrionSuttonMenardConchoSchleicher County
1 countyClick a county to open it
Gas, last 12 months
819 mcf
RRC field no.
90007830
RRC district
7C
Data through
Jul 2026

Production

Five years of output in Tillery (Strawn Lime)

Monthly totals across the leases the Railroad Commission assigns to this field.

Oil output in the Tillery (Strawn Lime) field fell 32% over the last 12 months

501 bbl in the 12 months through Jul 2026, against 732 bbl in the 12 months before. Peak month: May 2022, 130 bbl.

Oil output in the Tillery (Strawn Lime) field fell 32% over the last 12 months501 bbl in the 12 months through Jul 2026, against 732 bbl in the 12 months before. Peak month: May 2022, 130 bbl.Oil, bbl per month050100150Peak 130 (May 22)2920222023202420252026
Oil output in the Tillery (Strawn Lime) field fell 32% over the last 12 months501 bbl in the 12 months through Jul 2026, against 732 bbl in the 12 months before. Peak month: May 2022, 130 bbl.Oil, bbl per month050100150Peak 130 (May 22)29'22'23'24'25'26

Gas output in the Tillery (Strawn Lime) field: 819 mcf in the last 12 months

819 mcf in the 12 months through Jul 2026. Peak month: Jun 2026, 757 mcf.

Gas output in the Tillery (Strawn Lime) field: 819 mcf in the last 12 months819 mcf in the 12 months through Jul 2026. Peak month: Jun 2026, 757 mcf.Gas, mcf per month0200400600800Peak 757 (Jun 26)020222023202420252026
Gas output in the Tillery (Strawn Lime) field: 819 mcf in the last 12 months819 mcf in the 12 months through Jul 2026. Peak month: Jun 2026, 757 mcf.Gas, mcf per month0200400600800Peak 757 (Jun 26)0'22'23'24'25'26

SourceTexas Railroad Commission, Production Data Query, summed over the leases assigned to field 90007830. Reported through Jul 2026, file dated Sep 18, 2026. The newest month is often revised as operators file late.

Leases

Leases in the Tillery (Strawn Lime) field

Ranked by last-12-month output. Filter by operator, and open any lease for its month-by-month ledger.

SourceTexas Railroad Commission, Production Data Query. Ranked by an approximate value of last-12-month output, so oil and gas wells sort together.

In the Tillery (Strawn Lime) field

Who operates here, and where

Each operator and county links to its own page, so you can see the rest of what they run.

Recent drilling permits in the Tillery (Strawn Lime) field

No recent drilling permits in this field are in our data yet.

For owners

What a field is, and why it matters to your check

RRC field number
90007830
RRC district
7C
Leases on record
3
Producing leases
3

The Railroad Commission assigns each lease to a field: the underground pool or formation it produces from. A field can cross county lines and hold leases from many operators. Leases in the same field often move together, because they draw on the same rock.

That makes the field a fair yardstick. If your lease fell sharply and the rest of Tillery (Strawn Lime) did not, that is worth a question to your operator. If the whole field fell, the cause is probably geology or price, not your check.

The field trend above sums every lease in the field, so it is a good comparison for the lease page of any lease listed here.