Skip to content

Texas oil lease · RRC district 7C · Lease 18145

Producing

ARLEDGE

Arledge is an oil lease in Nolan County, Texas, operated by Daylight Petroleum LLC in the Bloodworth, Ne. (6120 Canyon) field. The Railroad Commission shows 765 bbl of oil in the 12 months through Jul 2026.

Oil lease dossier · 1 well

765bbl oil, last 12 months+11% vs prior year
RRC lease
7C-18145

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Nolan CountyNolanTaylorMitchellFisherJonesCokeScurryNolan County
Nolan County · RRC district 7COpen Nolan County →
Gas, last 12 months
1,035 mcf
Oil in Jul 2026
35 bbl
Reporting to the state
since Jan 2020
Wells
1

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Oil output rose 11% over the last 12 months

765 bbl in the 12 months through Jul 2026, against 691 bbl in the 12 months before.

  • Oil (bars, left axis)
  • Gas (line, right axis)
  • Last 12 months
Oil output rose 11% over the last 12 monthsMonthly oil production and gas for ARLEDGE, Aug 2023 to Jul 2026. Oil output rose 11% over the last 12 months. 765 bbl in the 12 months through Jul 2026, against 691 bbl in the 12 months before.Last 12 months: 765 bblbbl per monthmcf per month0050100100200150300200400Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output rose 11% over the last 12 monthsMonthly oil production and gas for ARLEDGE, Aug 2023 to Jul 2026. Oil output rose 11% over the last 12 months. 765 bbl in the 12 months through Jul 2026, against 691 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month0050100100200150300200400Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, oil lease 18145, district 7C. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

All of the gas went to a processing plant in the last 12 months

Each bar is one month. Colors are the disposition codes the operator reported.

All of the gas went to a processing plant in the last 12 monthsShare of ARLEDGE gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a processing plant in the last 12 months. Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
All of the gas went to a processing plant in the last 12 monthsShare of ARLEDGE gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a processing plant in the last 12 months. Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 18145, district 7C. Reported through Jul 2026.

Processing plant (3)

Sent to a gas plant that pulls out natural gas liquids. Your statement should show plant products, and may show processing fees.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed once, most recently in Jun 2021

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeJ V A Operating Company, Inc., Jan 2020 to May 2021; Daylight Petroleum LLC, Jun 2021 to Jul 20262020202120222023202420252026Changed Jun 2021J V A Operating Company, Inc.Jan 2020 to May 2021Daylight Petroleum LLCJun 2021 to now
Operators of this lease over timeJ V A Operating Company, Inc., Jan 2020 to May 2021; Daylight Petroleum LLC, Jun 2021 to Jul 20262020202120222023202420252026Changed Jun 2021J V A Operating Company, Inc.Jan 2020 to May 2021Daylight Petroleum LLCJun 2021 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to oil lease 18145 in district 7C. The API number is the state’s ID for a well.
Wells on ARLEDGE
API numberWell no.Status
42-353-332604Active

SourceTexas Railroad Commission Wellbore Query, district 7C, lease 18145.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Oil

    Energy Transfer Company gathers it.

    100% of it, on the list since Aug 1, 2024

  • Gas from oil wells

    Etc Gas Processing, LLC buys it; Energy Transfer Company gathers it.

    Etc Gas Processing, LLC buys it: 100% of it, on the list since Aug 1, 2024 · Energy Transfer Company gathers it: 100% of it, on the list since Aug 1, 2024

Companies that used to be listed: Wtg Gas Processing, L.p. (gathers it, until Aug 1, 2024); Wtg Gas Processing, L.p. (buys it, until Aug 1, 2024); Energy Transfer Marketing & Term (gathers it, until Aug 1, 2024); Sunoco Ptnrs. Mktg.&terminals LP (gathers it, until Dec 1, 2022).

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

320 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
0
First completion
Sep 21, 2012
Latest permit
Oct 21, 2011
Wells and acres on the permits for Arledge
API numberWell no.Acreson the permit
42-353-332604320

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says ARLEDGE sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for ARLEDGE
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Daylight Petroleum35421331330$80.46$2.89
Jun 2026Daylight Petroleum4043000$84.81$3.15
May 2026Daylight Petroleum3452000$102.13$2.94
Apr 2026Daylight Petroleum6671000$100.32$2.77
Mar 2026Daylight Petroleum8582880$91.38$3.04
Feb 2026Daylight Petroleum55591321320$64.51$3.62
Jan 2026Daylight Petroleum67781031030$60.04$7.72
Dec 2025Daylight Petroleum89771531530$57.97$4.26
Nov 2025Daylight Petroleum877331310$60.06$3.79
Oct 2025Daylight Petroleum576244440$60.89$3.19
Sep 2025Daylight Petroleum73901871870$63.96$2.97
Aug 2025Daylight Petroleum77752442440$64.86$2.91
Jul 2025Daylight Petroleum1181092292290$68.39$3.20
Jun 2025Daylight Petroleum937975750$68.17$3.02
May 2025Daylight Petroleum60452182180$62.17$3.12
Apr 2025Daylight Petroleum42492162160$63.54$3.42
Mar 2025Daylight Petroleum46462242240$68.24$4.12
Feb 2025Daylight Petroleum45371971970$71.53$4.19
Jan 2025Daylight Petroleum50551071070$75.74$4.13
Dec 2024Daylight Petroleum51471031030$70.12$3.01
Nov 2024Daylight Petroleum44551261260$69.95$2.12
Oct 2024Daylight Petroleum48391771770$71.99$2.20
Sep 2024Daylight Petroleum46551121120$70.24$2.28
Aug 2024Daylight Petroleum48471591590$76.68$1.99
Jul 2024Daylight Petroleum47531961960$81.80$2.07
Jun 2024Daylight Petroleum48662152150$79.77$2.54
May 2024Daylight Petroleum521422222220$80.02$2.12
Apr 2024Daylight Petroleum1261763673670$85.35$1.60
Mar 2024Daylight Petroleum1911311981980$81.28$1.49
Feb 2024Daylight Petroleum00000$77.25$1.72
Jan 2024Daylight Petroleum00000$74.15$3.18
Dec 2023Daylight Petroleum00000$71.90$2.52
Nov 2023Daylight Petroleum00000$77.69$2.71
Oct 2023Daylight Petroleum00000$85.64$2.98
Sep 2023Daylight Petroleum00000$89.43$2.64
Aug 2023Daylight Petroleum00000$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for ARLEDGE. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Daylight Petroleum LLC.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Daylight Petroleum LLC in Nolan County

All Daylight Petroleum LLC leases →

Bloodworth, Ne. (6120 Canyon) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 18145, district 7C, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.