A-436 · SEC. 5 · BLK 2 · I&GN RR CO10HA-436SEC. 5 · BLK 2 · I&GN RR COARNOLD A UNIT · 640 ACRESN500 m28.5412° N 99.2903° W · PHOTO: U.S. GEOLOGICAL SURVEY

Texas gas wellRRC 01-290976Producing

Arnold A Unit

The lease produced 3,483 thousand cubic feet of gas in the last 12 months, through August 2026.

Is your family on this lease?

Email me when this lease changesI own here

1 location is linked by a filed completion. The primary well record can name a different lease.

County
La Salle
On record since
July 2012
Newest report on file
August 2026
Unit on the newest permit
640 acres

Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.

Eight things the public record says about this lease. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

The story, from 170 monthly reports

2012 to 2026: it sold the most in 2012

Gas sold each month since July 2012The numbers match the paragraphs below
2014201620182020202220242026120122May 20133Jul 20234Feb 20255May 20256August 2026Jul 2012 onward

2012: the year the lease sold the most, $4.62 million of oil and gas at public prices.

May 2013: the first month the lease sold gas on record, 4,198 thousand cubic feet.

July 2023: Ridgemar Energy Operating, LLC took over from Callon (Eagle Ford) LLC.

February 2025: Javelin Energy Partners Mgmt LLC took over from Ridgemar Energy Operating, LLC.

May 2025 to June 2025: two months in a row with no oil and no gas reported.

August 2026 is the newest monthly production report on file.

SourceRailroad Commission production reports, July 2012 through August 2026. Not a forecast, not reserves.

Checks stopped on this lease?

Operator

Operator changed: Javelin Energy Partners Mgmt LLC took over from Ridgemar Energy Operating, LLC in Feb 2025.

P-5

The previous operator's P-5 registration is listed as delinquent (last P-5 filed Jun 3, 2025).

Buyer

Buyer changed: SILVERBOW RESOURCES OPER, LLC replaced UPSTREAM ENERGY SERVICES as the buyer of this lease's gas from gas wells on Feb 1, 2025.

SourceRailroad Commission production, P-5 and P-4 records, data through August 2026.See why checks stop on this lease

170 months against 7 other recordsNew

Every month since July 2012, and what else happened that month

The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.

Sep 2016
353 mcf · up 288% on the three months before
Gas averaged $2.99 an mcf · Callon (Eagle Ford) LLC
  • Nothing else on record this month.
SINCEJUL 2012201420162018202020222024202601,0002,0003,0004,000MCF A MONTHLAST 12 MONTHS12345678WEATHERTHE STATEGAS PRICENEXT DOOROPERATORBUYERSTHE FIELDCallon (Eagle Ford) LLCRidgemarJavelin2017201820192020202120222023202420252026
The eight largest of 21 drops

Move the pointer or drag across the chart. The numbered buttons jump to each drop.

Monthly gas sold from this lease since July 2012, with eight record tracks beneath it. Use the left and right arrow keys to move month by month.. 170 months from July 2012 to August 2026. The most in one month: 11,796 mcf, July 2013. The newest month: 321 mcf. 29 months with nothing reported. Moments marked: 1, Jan 2013; 2, Apr 2013; 3, May 2013; 4, Jun 2013; 5, Nov 2013; 6, Dec 2013; 7, Nov 2015; 8, Apr 2016.

SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through August 2026.

Royalty Watch tells you the month a drop starts, with the records from that month.Watch this lease

167 months, one line eachNew

Two months of silence in 2025

A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.

2

months in a row with nothing reported, May to June 2025. Of the 2 months, 1 with a report on file showing no oil and no gas and 1 with a report on file showing a sale and nothing produced. The only silence on record here.

321

thousand cubic feet of gas and 68 barrels of oil on the newest report on file with oil or gas, for August 2026, the State's newest month.

163

of 167 months with oil or gas reported since July 2012.

9.54

thousand cubic feet of gas a day on average from September 2025 through August 2026, counting a month with no report on file as zero.

July 2012Taller line, more gas soldMay 2026
2014201620182020202220242026ENLARGED BELOW
2024 to 2026, enlarged
20242025J20262 months, nothing reported

A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.

SourceRailroad Commission production reports, July 2012 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.

Royalty Watch tells you when a silent month starts, and drafts the letter asking whether the lease is still in force.Watch this lease

15 years of state records, 2012 to 2026

Sold since July 2012

$16.8million

Sales at public prices before tax and deductions. Multiply by your decimal interest to estimate your share.

Oil sold
216,088barrels
Gas sold
203,219thousand cubic feet
Best year
2012$4.62 million sold
Sold each year, at that month's pricesOilGas
What the oil and gas from this lease sold for each year, 2012 to 2026, at each month's public prices.
YearOil, dollarsGas, dollarsTotal
2012$4.62 million$0$4.62 million, sold the most
2013$3.46 million$170,000$3.63 million
2014$1.7 million$75,300$1.77 million
2015$654,000$39,000$693,000
2016$577,000$12,700$589,000
2017$855,000$2,030$857,000
2018$804,000$56,200$860,000
2019$610,000$48,900$658,000
2020$471,000$37,100$508,000
2021$497,000$65,800$563,000
2022$422,000$97,200$519,000
2023$280,000$45,600$326,000
2024$509,000$24,700$534,000
2025$472,000$7,560$480,000
2026, 2026 so far$178,000$7,790$185,000

Did a relative own a share of this lease?

The bars show every year. Pick one to add up what the lease has sold since.

SourcesRailroad Commission Production Data Query, every monthly report since July 2012. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.

Who has run this lease

The operator changed two times, most recently in February 2025

The company named on each monthly report to the State. The operator is not always the company that pays.

  1. Javelin Energy Partners Mgmt LLCFebruary 2025 to now
  2. Ridgemar Energy Operating, LLCJuly 2023 to January 2025
  3. Callon (Eagle Ford) LLCJuly 2012 to June 2023

SourcesRailroad Commission production reports, the operator on each month’s report, July 2012 through August 2026.

The newest well, seen from the side

No well on the way.

No dated well completion is on file for this lease.

  1. Permit filedNot on file
  2. Drilling startedNot on file
  3. FrackedNot on file
  4. Completion filedNot on file
  5. First production on the leaseNot on file
  6. First checkNot on file

SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 17, 2026.

Royalty Watch follows new well permits and completions on this lease.Watch this lease

About 6 miles across

Wells on this lease and around it

1this lease, ringed
107producing
4fracked and waiting
4permits, last 24 months
0plugged
41original land surveys

For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/arnold-a-unit-01-290976-g"><img src="https://royaltyclerk.com/maps/lease-wells/arnold-a-unit-01-290976-g.svg" alt="Map of the Arnold A Unit lease in La Salle County, Texas: its well ringed, among 116 wells and 4 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/arnold-a-unit-01-290976-g">Wells on the Arnold A Unit lease, La Salle County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

From the State's well records

Wells on this lease

No wells are linked to this lease in the State’s well records. Production is still reported at lease level.

SourceRailroad Commission wellbore and completion records.

Other leases on these wells

The Railroad Commission files the same API numbers under one more lease too: a well keeps its number when it moves into a unit or is recompleted under another lease. A deed older than the unit may name one of them.

Arnold A Unit (La Salle County, 1 shared well)

What the drilling permits say

640acres on the newest permit

640 ACRES
  • 640 acres, on the 2011 permits
Check your decimal on this lease

Gas, August 2026, dollars per thousand cubic feet New

Four prices for the same gas

What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.

$2.78
The marketHenry Hub, August 2026
none on file
Told its investorsno public parent's filing on record
not on file yet
Told the tax officeTexas Comptroller, this lease
?
Your statementonly you hold this one
On recordA lower tax is on record

The State approved a lower tax for this lease

Kind
Low Producing Wells
Wells
The whole lease
Runs
February 2023 to no end date on file
Rate
Not given in the file

Look at the tax line on your statement for this lease. The record says which rate applies.

Estimate your royalty

Type the decimal from your division order

The starting decimal is an example. Nothing you type here leaves this page.

$107a month

At these prices the whole lease’s reported sales were about $328,000 over 12 reported months. Your estimated share is $1,280 before taxes and deductions.

Monthly owner volumes and values
Estimated share before tax and deductions
MonthOil (bbl)Oil valueGas (mcf)Gas valueTotal
August 20260.2656$22.291.2539$3.49$25.77
July 20261.0898$87.692.0977$6.06$93.75
June 20260.8242$69.901.3828$4.36$74.26
May 20261.6953$173.140.9219$2.71$175.85
April 20261.5195$152.440.9688$2.68$155.12
March 20261.5273$139.570.7539$2.29$141.86
February 20260.2266$14.620.2773$1.00$15.62
January 20260.5742$34.481.0156$7.84$42.32
December 20250.9805$56.841.6367$6.97$63.81
November 20251.9648$118.011.25$4.74$122.75
October 20252.8008$170.541.0273$3.28$173.82
September 20253.0156$192.880.7305$2.17$195.05

SourcesMarket: U.S. Energy Information Administration (Henry Hub for gas, taken per thousand cubic feet; WTI Cushing for oil). Investors: no public parent's filing is on record for the operator. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.

Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus

Who takes the oil and gasNew

The gas buyer and the operator share an officer

The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.

GAS
ON RECORDThe companies list an officer in common
Runs the leaseJavelin Energy Partners Mgmt LLCsince February 2025
Gathers 50%CAMINO REAL GATHERING CO. L.L.C.since June 2012
Buys 100%SILVERBOW RESOURCES OPER, LLCsince February 2025

Also on the P-4: DCP OPERATING COMPANY, LP gathers 50%.

OIL
Runs the leaseJavelin Energy Partners Mgmt LLCsince February 2025
Gathers 100%PLAINS PIPELINE L.P.since February 2025

No shared owner, officer or address on record between the oil buyers and the operator.

Selling to a related company is common and legal. It is also the first thing an auditor looks at, because the price between the two is set inside one company.

Earlier buyers and gatherers, back to 1993
Earlier companies named on the Form P-4
CompanyProductRoleFromUntil
IRONWOOD MIDST ENERGY PTNRS LLCOilGathersJan 2023Feb 2025
EASTEX CRUDE COMPANY, LLCOilGathersJan 2023Feb 2025
UPSTREAM ENERGY SERVICESGasBuysJan 2023Feb 2025
RIO ENERGY INTERNATIONAL, INC.OilGathersJun 2012Jan 2023
EASTEX CRUDE COMPANYOilGathersJun 2012Jan 2023
UPSTREAM ENERGY SERVICESGasBuysJun 2012Jan 2023

SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.

Royalty Watch tells you the day the buyer of your oil or gas changes.Watch this lease

Seen from space, 2025New

No satellite heat at this pad in 2025

Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.

A-436 · SEC. 5 · BLK 2 · I&GN RR COONE SATELLITE PIXEL, ABOUT 375 M
DAYNIGHT, 2025
Each dot is a nightFlaring reported
JAN0none
FEB0none
MAR0none
APR03 mcf
MAY0none
JUN0none
JUL01 mcf
AUG0none
SEP01 mcf
OCT02 mcf
NOV02 mcf
DEC027 mcf

A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.

0

nights with heat recorded at this pad, 2025.

6

months in which flaring was reported, 36 thousand cubic feet in all.

0

months with heat seen and no flaring reported.

Where the gas went in 2025, as the operator reported it

20.7%Sold2,049 thousand cubic feet
78.9%Used on the lease7,806 thousand cubic feet
0.36%Flared or vented36 thousand cubic feet

SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 16, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.

Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus

Where the gas went, month by month

98% of the gas went to a transmission line in the last 12 months

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

98% of the gas went to a transmission line in the last 12 monthsShare of Arnold A Unit gas by disposition code each month, September 2023 to August 2026. 98% of the gas went to a transmission line in the last 12 months. 2.1% of the gas was flared in the last 12 months. 6 months above 3%, the most 6.4% in April 2024.Share of the lease’s gas by disposition code, per month0%50%100%Flared 6.4%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
98% of the gas went to a transmission line in the last 12 monthsShare of Arnold A Unit gas by disposition code each month, September 2023 to August 2026. 98% of the gas went to a transmission line in the last 12 months. 2.1% of the gas was flared in the last 12 months. 6 months above 3%, the most 6.4% in April 2024.Share of gas by disposition code0%50%100%Flared 6.4%Jan 24JulJan 25JulJan 26Jul
  • Transmission line (2)98% · 3,409 mcf
  • Flared (4)2.1% · 74 mcf

2.1% of the gas was flared in the last 12 months. 6 months above 3%, the most 6.4% in April 2024.

SourcesRailroad Commission production reports, gas disposition by code, September 2023 to August 2026.

The county appraisal roll

No public roll figures

County mineral roll

No public roll figures

There are no publishable figures for this lease from the 2026 county mineral roll.

Royalty Clerk has mineral rolls for 158 Texas counties.

Source County appraisal district mineral rolls.

From the state record

What owners ask about Arnold A Unit

01When is the check for August 2026 due?
August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Oct 30, 2026 and the gas by Nov 29, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
See your next three checks
02Which Texas production tax rate applies?
The Texas Comptroller lists low producing wells for this lease, from Feb 1, 2023. Its file does not give the rate, so we compare your stub with the full 7.5%. That is for August 2026.
Source: Texas Comptroller, approved severance tax exemptions.
Check the tax on your stub
03Who buys the oil and gas?
CONDPlains Pipeline L.p.100%
GASSilverbow Resources Oper, LLC100%
Condensate: Plains Pipeline L.p. gathers it. Gas from gas wells: Silverbow Resources Oper, LLC buys it; Camino Real Gathering Co. L.l.c. and Dcp Operating Company, LP gather it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
See every buyer and past buyers
04How many 1099s should an owner expect for 2025?
2January to December 2025: 2 operators of record
Two companies filed this lease's reports behind 2025 checks: Ridgemar Energy Operating, LLC and Javelin Energy Partners Mgmt LLC. An owner paid by more than one of them gets a form from each. The operator is not always the company that pays, so go by the names on the stubs.
Source: Railroad Commission production reports, operator of record by month.
Check your 1099 against it

Every monthly report the State holds

170 months, newest first

Ledger for Arnold A Unit
MonthOil soldbarrelsGas soldthousand cubic feetFlared or ventedthousand cubic feetSold forat public pricesOperator
AugustAug 2026683211$6,600Javelin Energy Partners Mgmt LLC
JulyJul 20262795372$24,000Javelin Energy Partners Mgmt LLC
JuneJun 202621135416 · 4.52%$19,000Javelin Energy Partners Mgmt LLC
MayMay 20264342361$45,000Javelin Energy Partners Mgmt LLC
AprilApr 20263892480$39,700Javelin Energy Partners Mgmt LLC
MarchMar 20263911931$36,300Javelin Energy Partners Mgmt LLC
FebruaryFeb 202658714 · 5.63%$4,000Javelin Energy Partners Mgmt LLC
JanuaryJan 202614726017 · 6.54%$10,800Javelin Energy Partners Mgmt LLC
DecemberDec 202525141927 · 6.44%$16,300Javelin Energy Partners Mgmt LLC
NovemberNov 20255033202$31,400Javelin Energy Partners Mgmt LLC
OctoberOct 20257172632$44,500Javelin Energy Partners Mgmt LLC
SeptemberSep 20257721871$49,900Javelin Energy Partners Mgmt LLC
AugustAug 20251,2002360$78,500Javelin Energy Partners Mgmt LLC
JulyJul 2025398641$27,400Javelin Energy Partners Mgmt LLC
JuneJun 2025No oil or gas reportedJavelin Energy Partners Mgmt LLC
MayMay 20251000$622Javelin Energy Partners Mgmt LLC
AprilApr 2025616703 · 4.29%$39,400Javelin Energy Partners Mgmt LLC
MarchMar 20256121380$42,300Javelin Energy Partners Mgmt LLC

SourcesTexas Railroad Commission Production Data Query, through August 2026. Prices: EIA.

Do your checks match this lease?

Check my statement

Likely owed Jan 2025

A whole month was never paid

The state shows 28,175 bbl of oil sold from this lease in January 2025, so your share is 27.51 bbl. No statement covers January 2025. That is the month the operator changed from Endeavor Energy Resources to Diamondback.

Ask Diamondback owner relations: is January 2025 being held in suspense after the change of operator?

$2,277oil + gas

A sample finding, from our example check. The full example found $3,328 likely owed.

Around this lease

Nearby

Javelin Energy Partners Mgmt LLC in La Salle County

All Javelin Energy Partners Mgmt LLC leases

Eagleville (Eagle Ford-1) field

All leases in this field

New drilling permits in La Salle County

  • BROWNLOW #3Hfield transfer · horizontal · Ineos USA Oil & Gas LLC · Nov 19, 2026
  • BROWNLOW #1Hfield transfer · horizontal · Ineos USA Oil & Gas LLC · Nov 19, 2026
  • DEER VALLEY C #3Hnew drill · horizontal · EOG Resources, Inc. · Nov 19, 2026
  • DEER VALLEY B #2Hnew drill · horizontal · EOG Resources, Inc. · Nov 19, 2026
  • DEER VALLEY A #1Hnew drill · horizontal · EOG Resources, Inc. · Nov 19, 2026

Same name in district 01

Sister leases

Where it sits

This county

La Salle CountyLa SalleZavalaAtascosaMcMullenDimmitFrioLa Salle County
La Salle County

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells
  • Texas Comptroller tax approvals, lease values
  • U.S. Energy Information Administration prices
  • SEC EDGAR company filings
  • NOAA storms and cold
  • NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
  • U.S. Geological Survey photos