Texas gas wellRRC 08-299873
Billy Bobs State A
The lease produced 585,419 thousand cubic feet of gas in its last 12 months on record, through July 2026. No report after July 2026 is on file; the State's newest month is August 2026.
1 location is linked by a filed completion. The primary well record can name a different lease.
- Operator
- Jetta Operating Company, Inc.
- County
- Ward
- Field
- Phantom (Wolfcamp)
- On record since
- April 2025
- Newest report on file
- July 2026
- Unit on the newest permit
- 1,063 acres
Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.
The story, from 16 monthly reports
2025 to 2026: it sold the most in 2025
April 2025: the first month the lease sold gas on record, 12,554 thousand cubic feet.
2025: the year the lease sold the most, $12 million of oil and gas at public prices.
July 2026 is the newest monthly production report on file.
SourceRailroad Commission production reports, April 2025 through August 2026. Not a forecast, not reserves.
17 months against 7 other recordsNew
Every month since April 2025, and what else happened that month
The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.
Gas averaged $2.78 an mcf · Jetta Operating Company, Inc.
- Nothing else on record this month.
Move the pointer or drag across the chart.
Monthly gas sold from this lease since April 2025, with eight record tracks beneath it. Use the left and right arrow keys to move month by month.. 17 months from April 2025 to August 2026. The most in one month: 93,990 mcf, June 2025. The newest month: 0 mcf. 1 month with nothing reported.
No month fell far below the three months before it.
SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through August 2026. The newest report on file for this lease is for July 2026; no report after it is on file.
Royalty Watch tells you the month a drop starts, with the records from that month.Watch this lease
14 months, one line eachNew
No silent months since April 2025
A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.
runs of two or more months with nothing reported, since April 2025.
thousand cubic feet of gas and 8,556 barrels of oil on the newest report on file with oil or gas, for July 2026. No report after July 2026 is on file; the State's newest month is August 2026.
of 14 months with oil or gas reported since April 2025.
thousand cubic feet of gas a day on average from September 2025 through August 2026, counting a month with no report on file as zero.
A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.
SourceRailroad Commission production reports, April 2025 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.
Royalty Watch tells you when a silent month starts, and drafts the letter asking whether the lease is still in force.Watch this lease
2 years of state records, 2025 to 2026
Sold since April 2025
$18.5million
Sales at public prices before tax and deductions. Multiply by your decimal interest to estimate your share.
- Oil sold
- 224,228barrels
- Gas sold
- 839,021thousand cubic feet
- Best year
- 2025$12 million sold
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 2025 | $10.2 million | $1.82 million | $12 million, sold the most |
| 2026, 2026 so far | $5.42 million | $1.06 million | $6.48 million |
Did a relative own a share of this lease?
SourcesRailroad Commission Production Data Query, every monthly report since April 2025. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.
The newest well, seen from the side
No well on the way. The completion of Well 3472H was filed on April 20, 2025.
- Permit filedNot on file
- Drilling startedNot on file
- FrackedNot on file
- Completion filedApril 20, 2025
- First production on the leaseApril 2025
- First checkNot on file
SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Source records through November 16, 2026.
Royalty Watch follows new well permits and completions on this lease.Watch this lease
About 6 miles across
Wells on this lease and around it
For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.
From the State's well records
Wells on this lease
No wells are linked to this lease in the State’s well records. Production is still reported at lease level.
SourceRailroad Commission wellbore and completion records.
The Railroad Commission files the same API numbers under one more lease too: a well keeps its number when it moves into a unit or is recompleted under another lease. A deed older than the unit may name one of them.
Billy Bobs State A (Ward County, 1 shared well)
What the drilling permits say
1,063acres on the newest permit
- 1,063 acres, on the 2024 permits
An allocation well is on this lease A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.
Gas, August 2026, dollars per thousand cubic feet New
Four prices for the same gas
What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.
The State approved a lower tax for this lease
- Kind
- High Cost Gas Reduced Tax Rate
- Wells
- The whole lease
- Runs
- April 2025 to March 2035
- Rate
- 2.50%
7.50%
Look at the tax line on your statement for this lease. The record says which rate applies.
Estimate your royalty
Type the decimal from your division order
The starting decimal is an example. Nothing you type here leaves this page.
$4,030a month
At these prices the whole lease’s reported sales were about $12.4 million over 12 reported months. Your estimated share is $48,300 before taxes and deductions.
Monthly owner volumes and values
| Month | Oil (bbl) | Oil value | Gas (mcf) | Gas value | Total |
|---|---|---|---|---|---|
| July 2026 | 33.4219 | $2,689.12 | 149.7461 | $432.77 | $3,121.89 |
| June 2026 | 33.5039 | $2,841.47 | 132.9844 | $418.90 | $3,260.37 |
| May 2026 | 36.0508 | $3,681.87 | 160.9688 | $473.25 | $4,155.11 |
| April 2026 | 30.957 | $3,105.61 | 130.9648 | $362.77 | $3,468.38 |
| March 2026 | 42.4336 | $3,877.58 | 189.4766 | $576.01 | $4,453.59 |
| February 2026 | 39.5156 | $2,549.15 | 167.5625 | $606.58 | $3,155.73 |
| January 2026 | 40.5469 | $2,434.43 | 163.2383 | $1,260.20 | $3,694.63 |
| December 2025 | 50.3672 | $2,919.79 | 197.8477 | $842.83 | $3,762.62 |
| November 2025 | 52.7031 | $3,165.35 | 205.5859 | $779.17 | $3,944.52 |
| October 2025 | 59.5938 | $3,628.66 | 234.1406 | $746.91 | $4,375.57 |
| September 2025 | 65.6094 | $4,196.38 | 247.1836 | $734.14 | $4,930.51 |
| August 2025 | 80.7969 | $5,240.49 | 266.4219 | $775.29 | $6,015.77 |
SourcesMarket: U.S. Energy Information Administration (Henry Hub for gas, taken per thousand cubic feet; WTI Cushing for oil). Investors: no public parent's filing is on record for the operator. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.
Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus
Who takes the oil and gasNew
No buyer shares an owner with the operator
The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.
No shared owner, officer or address on record between the gas buyers and the operator.
No shared owner, officer or address on record between the oil buyers and the operator.
Who buys my oilOil price check
SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.
Royalty Watch tells you the day the buyer of your oil or gas changes.Watch this lease
Seen from space, 2025New
No satellite heat at this pad in 2025
Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.
A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.
nights with heat recorded at this pad, 2025.
months in which flaring was reported, 12,106 thousand cubic feet in all.
months with heat seen and no flaring reported.
Where the gas went in 2025, as the operator reported it
SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 16, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.
Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus
Where the gas went, month by month
98% of the gas went to a processing plant in the last 12 months
Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.
- Processing plant (3)98% · 575,007 mcf
- Flared (4)1.8% · 10,412 mcf
1.8% of the gas was flared in the last 12 months. 4 months above 3%, the most 11.4% in June 2026.
SourcesRailroad Commission production reports, gas disposition by code, April 2025 to July 2026.
The county appraisal roll
No public roll figures
County mineral roll
No public roll figures
There are no publishable figures for this lease from the 2026 county mineral roll.
Royalty Clerk has mineral rolls for 163 Texas counties.
Source County appraisal district mineral rolls.
From the state record
What owners ask about Billy Bobs State A
- 01When is the check for July 2026 due?
- Jul 31sale month endsSept 29oil dueOct 29gas due
- July 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Sep 29, 2026 and the gas by Oct 29, 2026, unless the lease sets another time.
- Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
- See your next three checks
- 02Which Texas production tax rate applies?
- Gas, full rate7.50%Gas, this lease2.50%Oil4.60%
- The Texas Comptroller lists high cost gas reduced tax rate for this lease, from Apr 1, 2025 to Mar 31, 2035, at 2.5% in place of 7.5%. That is for July 2026.
- Source: Texas Comptroller, approved severance tax exemptions.
- Check the tax on your stub
- 03Who buys the oil and gas?
- CONDPlains Marketing, L.p.100%GASBrazos Midstream Operating, LLC100%
- Condensate: Plains Marketing, L.p. gathers it. Gas from gas wells: Brazos Midstream Operating, LLC buys and gathers it. The buyer's price is what a royalty check is figured on.
- Source: Railroad Commission Form P-4, gatherers and purchasers.
- See every buyer and past buyers
- 04How many 1099s should an owner expect for 2025?
- One company, Jetta Operating Company, Inc., filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
- Source: Railroad Commission production reports, operator of record by month.
- Check your 1099 against it
Every monthly report the State holds
17 months, newest first
| Month | Oil soldbarrels | Gas soldthousand cubic feet | Flared or ventedthousand cubic feet | Sold forat public prices |
|---|---|---|---|---|
| AugustAug 2026 | No report on file | |||
| JulyJul 2026 | 8,556 | 38,335 | 538 | $799,000 |
| JuneJun 2026 | 8,577 | 34,044 | 4,377 · 12.9% | $835,000 |
| MayMay 2026 | 9,229 | 41,208 | 464 | $1.06 million |
| AprilApr 2026 | 7,925 | 33,527 | 321 | $888,000 |
| MarchMar 2026 | 10,863 | 48,506 | 196 | $1.14 million |
| FebruaryFeb 2026 | 10,116 | 42,896 | 524 | $808,000 |
| JanuaryJan 2026 | 10,380 | 41,789 | 673 | $946,000 |
| DecemberDec 2025 | 12,894 | 50,649 | 741 | $963,000 |
| NovemberNov 2025 | 13,492 | 52,630 | 760 | $1.01 million |
| OctoberOct 2025 | 15,256 | 59,940 | 264 | $1.12 million |
| SeptemberSep 2025 | 16,796 | 63,279 | 719 | $1.26 million |
| AugustAug 2025 | 20,684 | 68,204 | 835 | $1.54 million |
| JulyJul 2025 | 24,193 | 77,443 | 3,727 · 4.81% | $1.9 million |
| JuneJun 2025 | 29,555 | 93,990 | 1,108 | $2.3 million |
| MayMay 2025 | 23,334 | 80,027 | 2,683 · 3.35% | $1.7 million |
| AprilApr 2025 | 2,378 | 12,554 | 1,269 · 10.1% | $194,000 |
SourcesTexas Railroad Commission Production Data Query, through August 2026. Prices: EIA.
Likely owed Jan 2025
A whole month was never paid
The state shows 28,175 bbl of oil sold from this lease in January 2025, so your share is 27.51 bbl. No statement covers January 2025. That is the month the operator changed from Endeavor Energy Resources to Diamondback.
Ask Diamondback owner relations: is January 2025 being held in suspense after the change of operator?
$2,277oil + gas
A sample finding, from our example check. The full example found $3,328 likely owed.
Around this lease
Nearby
Jetta Operating Company, Inc. in Ward County
- Worsham -42-214,071 bbl last 12 months
- Sundance B612,788 mcf last 12 months
- Stockyards C157,894 bbl last 12 months
- Stockyards State B631,627 mcf last 12 months
- Sundance A378,962 mcf last 12 months
- Shell 'B'95,504 bbl last 12 months
- Barstow -13-91,461 bbl last 12 months
- Stockyards State A292,181 mcf last 12 months
- Shell74,604 bbl last 12 months
- State of Texas "DL"74,905 bbl last 12 months
Phantom (Wolfcamp) field
- Ul Dino Juice 18-41-40-45 Wa6159,539 bbl last 12 months
- Boz 55-2-6 Unit502,967 mcf last 12 months
- Dunigan State Unit E 53-6-17125,190 bbl last 12 months
- Collins State A157,615 bbl last 12 months
- Link VJ Ranch West 30-311,384,967 mcf last 12 months
- Gar Unit1,924,696 mcf last 12 months
- Geller 54-2-37 Lov Unit153,629 bbl last 12 months
- CBR 12-1M-56-1465,924 mcf last 12 months
- Ul 18 Wild Thing East I157,443 bbl last 12 months
- Sigler State 57-T2-15X22 Ba873,858 mcf last 12 months
New drilling permits in Ward County
- VULCAN 2-3 H #303HRnew drill · horizontal · MCM Operating, LLC · Nov 12, 2026
- EAGER BEAVER 58/47 A #F101DAnew drill · horizontal · Mewbourne Oil Company · Nov 2, 2026
- ALL AMERICAN 57/48 A #F101MPnew drill · horizontal · Mewbourne Oil Company · Nov 2, 2026
- SEALY RANCH #5703Hnew drill · horizontal · Halcon Operating Co., Inc. · Oct 30, 2026
- SEALY RANCH #5602Hnew drill · horizontal · Halcon Operating Co., Inc. · Oct 30, 2026
Same name in district 08
- Billy Bobs State Ano production in the last 12 months
Where it sits
This county
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells
- Texas Comptroller tax approvals, lease values
- U.S. Energy Information Administration prices
- NOAA storms and cold
- NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
- U.S. Geological Survey photos