Texas oil lease · RRC district 7B · Lease 32844
ProducingCHERRY WRIGHT
Cherry Wright is an oil lease in Nolan County, Texas, operated by TDC Engineering, Inc. in the Cherry on Top (Strawn Reef) field. The Railroad Commission shows 17,194 bbl of oil in the 12 months through Jul 2026.
Oil lease dossier · 1 well
- Operator
- TDC Engineering, Inc.
- County
- Nolan County
- RRC lease
- 7B-32844
Own a share of this lease?
Is your check right?
Upload a check stub or a phone photo. We compare every month with the state numbers on this page.
Free. No account needed. Two to four pages.
Where it sits
This county
- Oil in Jul 2026
- 1,294 bbl
- Reporting to the state
- since Jun 2025
- Wells
- 1
- Data through
- Jul 2026
Production
Month by month, from the state record
Oil output rose 45% since Jun 2025
Monthly average of 1,388 bbl in the latest 3 months, against 955 bbl in the first 3.
SourceTexas Railroad Commission Production Data Query, oil lease 32844, district 7B. Reported through Jul 2026. The state revises recent months.
Gas disposition
Where the gas went
No gas disposition reported for this lease
Operator history
Who has run this lease
TDC Engineering, Inc. has reported this lease for the whole period
No change of operator in the months we hold.
- TDC Engineering, Inc. Jun 2025 to now
SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.
Wells
1 well on this lease
| API number | Well no. | Status | Total depthft |
|---|---|---|---|
| 42-353-32638 | 1 | Active | – |
SourceTexas Railroad Commission Wellbore Query, district 7B, lease 32844.
Who buys and gathers
Who moves and buys this lease's production
Oil
Energy Trans Crude Marketing LLC gathers it.
100% of it, on the list since Jun 26, 2025
SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.
Unit and wells
160 acres on the newest permit
- Wells on the permits
- 11 not plugged
- Horizontal
- 0
- First completion
- Jun 26, 2025
- Latest permit
- Apr 1, 2025
| API number | Well no. | Permit issued | Completed | Acreson the permit |
|---|---|---|---|---|
| 42-353-32638 | 1 | Apr 1, 2025 | Jun 26, 2025 | 160 |
Estimator
Estimate your royalty for this lease
Estimator
What could your check be?
Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says CHERRY WRIGHT sold each month.
For example 0.00097656, or a fraction like 1/1024.
Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.
Your estimate appears here
An estimate, not your check
Ledger
14 months, newest first
| Month | Oil producedbbl | Oil soldbbl | WTI$ per bbl | Henry Hub$ per MMBtu |
|---|---|---|---|---|
| Jul 2026TDC Engineering, | 1,294 | 1,255 | $80.46 | $2.89 |
| Jun 2026TDC Engineering, | 1,365 | 1,427 | $84.81 | $3.15 |
| May 2026TDC Engineering, | 1,505 | 1,427 | $102.13 | $2.94 |
| Apr 2026TDC Engineering, | 1,444 | 1,438 | $100.32 | $2.77 |
| Mar 2026TDC Engineering, | 1,638 | 1,643 | $91.38 | $3.04 |
| Feb 2026TDC Engineering, | 1,513 | 1,458 | $64.51 | $3.62 |
| Jan 2026TDC Engineering, | 1,041 | 1,090 | $60.04 | $7.72 |
| Dec 2025TDC Engineering, | 1,502 | 1,455 | $57.97 | $4.26 |
| Nov 2025TDC Engineering, | 1,461 | 1,463 | $60.06 | $3.79 |
| Oct 2025TDC Engineering, | 1,636 | 1,627 | $60.89 | $3.19 |
| Sep 2025TDC Engineering, | 1,454 | 1,441 | $63.96 | $2.97 |
| Aug 2025TDC Engineering, | 1,341 | 1,286 | $64.86 | $2.91 |
| Jul 2025TDC Engineering, | 1,079 | 1,085 | $68.39 | $3.20 |
| Jun 2025TDC Engineering, | 444 | 360 | $68.17 | $3.02 |
No report filed More than 3% of gas flared
SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).
Check your statements
Do your checks match this lease?
Upload your statements for CHERRY WRIGHT. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask TDC Engineering, Inc.
- A month that was never paid
- Your share of the barrels and mcf
- The price against WTI and Henry Hub
- Fees taken on gas
- Late payment interest
Around this lease
Walk the neighborhood
This lease belongs to
TDC Engineering, Inc. in Nolan County
No other producing leases from this operator in this county are in our data yet.
Cherry on Top (Strawn Reef) field
No other producing leases in this field are in our data yet.
Leases within 10 km
Found by the location of their wells.
- KILLGORE
0 bbl last 12 months · 1.5 km away
- KILLGORE 140
0 bbl last 12 months · 2 km away
- ADAMS, JOHN G. SR
1,396 bbl last 12 months · 2.3 km away
- CALDWELL
0 bbl last 12 months · 3 km away
- WILKS, JOHN
0 bbl last 12 months · 3.3 km away
Drilling permits within 10 km
MRS KILGORE #1
new drill · TDC Engineering, Inc. · Nolan County · 0.4 km away
Permit 0916168 · Jul 21, 2026
LIGHT CRUDE #1
new drill · TDC Engineering, Inc. · Nolan County · 1.4 km away
Permit 0915733 · Jun 15, 2026
ALDERMAN #1
new drill · LPR Energy, LLC · Nolan County · 8.6 km away
Permit 0912035 · Jan 5, 2026
KCRA RECT #1
new drill · Atmos Energy Corp., Mid-Tex Div. · Nolan County · 3.9 km away
Permit 0911585 · Dec 4, 2025
CHERRY WRIGHT #1
new drill · TDC Engineering, Inc. · Nolan County · 0 km away
Permit 0907002 · Apr 1, 2025
How to read this page
Questions owners ask
What is a decimal interest?
It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.
How do I use this page to check a royalty check?
Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.
Why is the newest month Jul 2026?
The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.
Does this page show what my check should be?
No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.
Sources and method
Where these numbers come from
- Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 32844, district 7B, reported through Jul 2026.
- Wells: Texas Railroad Commission Wellbore Query.
- Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
- Page updated Sep 28, 2026.
We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.