Skip to content

Texas oil lease

Producing

HUBBERT UNIT

Hubbert Unit is an oil lease in Karnes County, Texas, operated by EOG Resources, Inc. in the Eagleville (Eagle Ford-2) field.

1 well

1,758bbl oil, last 12 months+13% vs prior year
RRC lease
02-10668

Is your family on this lease?

Email me when this lease changes
Gas, last 12 months
1,557 mcf
Oil in Aug 2026
135 bbl

Did a relative own a share of this lease?

Pick the year they passed and see what the lease has sold since.

Wells on this lease and around it

Where the state's map puts this lease's well, and what has been drilled or permitted within about 2 miles of it.
Map of the Hubbert Unit lease in Karnes County, Texas: its well ringed, among 66 wells and 4 recent drilling locations in a picture about 6 miles across.
  • This lease1Its well, ringed on the map: producing
  • Drilling locations4Permits issued in the last two years
  • Producing wells64On a lease reporting production now
  • Not producing0Shut in, inactive or no lease on record
  • Plugged2The state's wellbore record says plugged

The ringed dot is this lease's well, where the Railroad Commission's map puts it. The other dots are wells and drilling permits of the last 24 months on the land around it; the counts are for everything in the picture, which is about 6 miles across. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines, US Census Bureau county outlines, base map from USGS The National Map.

See the whole Texas well map

A one-page map of this lease to print, for a lawyer, a buyer or a probate file.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/hubbert-unit-02-10668"><img src="https://royaltyclerk.com/maps/lease-wells/hubbert-unit-02-10668.svg" alt="Map of the Hubbert Unit lease in Karnes County, Texas: its well ringed, among 66 wells and 4 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/hubbert-unit-02-10668">Wells on the Hubbert Unit lease, Karnes County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

Production by month

Oil output rose 13% over the last 12 months

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output rose 13% over the last 12 monthsMonthly oil production and gas for HUBBERT UNIT, Sep 2023 to Aug 2026. Oil output rose 13% over the last 12 months. 1,758 bbl in the 12 months through Aug 2026, against 1,555 bbl in the 12 months before.Last 12 months: 1,758 bblbbl per monthmcf per month00100100200200300300400400Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output rose 13% over the last 12 monthsMonthly oil production and gas for HUBBERT UNIT, Sep 2023 to Aug 2026. Oil output rose 13% over the last 12 months. 1,758 bbl in the 12 months through Aug 2026, against 1,555 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month00100100200200300300400400Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Aug 2026.

From the state record

What owners ask about Hubbert Unit

When is the check for August 2026 due?
August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the gas by Nov 29, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
See your next three checks
Which Texas production tax rate applies?
The Texas Comptroller lists no approved exemption or reduced rate for this lease for August 2026, so the full 7.5% on gas applies.
Source: Texas Comptroller, approved severance tax exemptions.
Check the tax on your stub
Who buys the oil and gas?
Oil: Eog Resources Marketing LLC gathers it. Gas from oil wells: Eog Resources, Inc. buys and gathers it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
See every buyer and past buyers
How many 1099s should an owner expect for 2025?
One company, EOG Resources, Inc., filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
Source: Railroad Commission production reports, operator of record by month.
Check your 1099 against it

33 years of state records, 1993–2026

HUBBERT UNIT since 2013

We read every monthly report the Railroad Commission holds, back to January 1993. This lease first reported in September 2013. It filed 156 monthly reports through August 2026.

Sold since 2013

$12.6 million

What the whole lease’s oil and gas sold for at each month’s public prices, before tax and the operator’s deductions. A royalty owner’s share is their decimal of it.

A relative owned a share? See what it earned after they died
Oil sold
159,011 bbl
Gas sold
7,845 mcf
Best year
2014$4.7 million sold
Last report
Aug 2026First: Sep 2013

Its best year was 2014: $4.7 million of oil and gas sold

Each bar is what the lease’s oil and gas sold for that year, at that month’s prices. 2026 is only part of a year in the records, drawn lighter.

  • Oil
  • Gas
Its best year was 2014: $4.7 million of oil and gas soldHubbert Unit: oil and gas sold each year from 2013 to 2026, at each month's prices. Its best year was 2014: $4.7 million of oil and gas sold.Sold each year, at each month’s prices$0$1M$2M$3M$4M$5MPeak 2014: $4.7M20132014201520162017201820192020202120222023202420252026
Its best year was 2014: $4.7 million of oil and gas soldHubbert Unit: oil and gas sold each year from 2013 to 2026, at each month's prices. Its best year was 2014: $4.7 million of oil and gas sold.Sold each year, at each month’s prices$0$1M$2M$3M$4M$5MPeak 2014: $4.7M'13'15'20'26

SourceTexas Railroad Commission Production Data Query, every monthly report since January 1993; EIA monthly WTI and Henry Hub prices (before 1997, EIA's yearly Texas natural gas wellhead price), through August 2026.

Every year as a table
Hubbert Unit: oil and gas sold each year
YearMonthsOil sold, bblGas sold, mcfSold for
2026 *8924386$78,530
2025121,653612$108,044
2024121,703103$132,574
2023122,225547$172,883
2022121,6381,111$166,995
2021122,416639$164,296
2020122,245101$93,307
2019122,9340$166,791
2018124,1490$266,684
2017127,2800$374,344
20161214,1020$595,138
20151222,2990$1,094,618
20141249,6970$4,748,353
2013445,7464,346$4,518,050

* Part of the year: the records run through August 2026.

Where the gas went

Since Jul 2026 the lease's gas goes to a processing plant instead of lease fuel

Flaring peaked at 46.5% of the gas in Aug 2024.

  • Processing plant (3)
  • Lease fuel (1)
  • Flared (4)
Since Jul 2026 the lease's gas goes to a processing plant instead of lease fuelShare of HUBBERT UNIT gas by disposition code each month, Sep 2023 to Aug 2026. Since Jul 2026 the lease's gas goes to a processing plant instead of lease fuel. Flaring peaked at 46.5% of the gas in Aug 2024.Share of the lease’s gas by disposition code, per month0%50%100%Jul 2026: fuel to plantFlared 46.5%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Jul 2026 the lease's gas goes to a processing plant instead of lease fuelShare of HUBBERT UNIT gas by disposition code each month, Sep 2023 to Aug 2026. Since Jul 2026 the lease's gas goes to a processing plant instead of lease fuel. Flaring peaked at 46.5% of the gas in Aug 2024.Share of gas by disposition code0%50%100%Jul 26: fuel to plantFlared 46.5%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Aug 2026.

  • Processing plant (3)

    55% · 851 mcf

  • Flared (4)

    25% · 388 mcf

  • Lease fuel (1)

    20% · 318 mcf

24.9% of the gas flared in the last 12 months. 33 months above 3%.

1 well on this lease

Wells on HUBBERT UNIT
API numberWellStatusCompleted
42-255-33080Hubbert Unit 1HActiveSep 10, 2013

SourceTexas Railroad Commission production records and full wellbore file.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%From
Eog Resources Marketing LLCOilGathers100Apr 1, 2015
Eog Resources, Inc.Casinghead gasBuys100Sep 10, 2013
Eog Resources, Inc.Casinghead gasGathers100Sep 10, 2013

SourceRailroad Commission Form P-4 file, Oct 24, 2026 (source).

1,038.34 acres on the newest permit

Permits for Hubbert Unit
API numberWell no.Acreson the permit
42-255-330801H1,038.34

SourceRailroad Commission drilling permits, Nov 14, 2026 (source 1, source 2).

What EOG Resources, Inc. told investors it received

EOG Resources, Inc. is linked to EOG Resources, Inc. (EOG).
Realized prices reported by EOG Resources, Inc.
QuarterOil$ per bblFiling
Q3 2026$86.72SEC filing
Q2 2026$98.15SEC filing
Q1 2026$72.47SEC filing
Q3 2025$65.95SEC filing
Q2 2025$64.82SEC filing
Q1 2025$72.87SEC filing

SourceEOG Resources, Inc. quarterly reports, SEC EDGAR, company-wide averages before hedging.

Estimate your royalty

36 months, newest first

Ledger for HUBBERT UNIT
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Aug 202613501116135$83.90$2.78
Jul 20261381861125941$80.46$2.89
Jun 2026114190146028$84.81$3.15
May 20261490956133$102.13$2.94
Apr 20261231871135734$100.32$2.77
Mar 20261711801175334$91.38$3.04
Feb 202610101004828$64.51$3.62
Jan 20261501811324739$60.04$7.72
Dec 20251561891449128$57.97$4.26
Nov 202515018114110928$60.06$3.79
Oct 202519518720815141$60.89$3.19
Sep 202517619013811419$63.96$2.97
Aug 202536853322512421$64.86$2.91
Jul 2025174031503$68.39$3.20
Jun 20250029200$68.17$3.02
May 20250038700$62.17$3.12
Apr 202512818218307$63.54$3.42
Mar 20257609004$68.24$4.12
Feb 20253404602$71.53$4.19
Jan 20251541911262317$75.74$4.13
Dec 2024195240208016$70.12$3.01
Nov 2024164175208012$69.95$2.12
Oct 202496052129$71.99$2.20
Sep 20241661781006026$70.24$2.28
Aug 202410918243020$76.68$1.99
Jul 202414719243911$81.80$2.07
Jun 2024160041011$79.77$2.54
May 202417418545012$80.02$2.12
Apr 2024243377571317$85.35$1.60
Mar 20241431743399$81.28$1.49
Feb 202495018907$77.25$1.72
Jan 202462020807$74.15$3.18
Dec 20231681911041417$71.90$2.52
Nov 20231781921557116$77.69$2.71
Oct 20231471831828816$85.64$2.98
Sep 20231521831866315$89.43$2.64

Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Aug 2026. Prices: EIA.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Check my statement

Nearby

EOG Resources, Inc. in Karnes County

All EOG Resources, Inc. leases →

Eagleville (Eagle Ford-2) field

All leases in this field →

Leases within 10 km

Drilling permits within 10 km