Skip to content

Texas oil lease · RRC district 06 · Lease 16137

Producing

KICKAPOO 'TP' 4

Kickapoo 'TP' 4 is an oil lease in Smith County, Texas, operated by Faulconer Energy, LLC in the Overton (Travis Peak) field. The Railroad Commission shows 9,670 bbl of oil in the 12 months through Jul 2026.

Oil lease dossier · 1 well

9,670bbl oil, last 12 months
RRC lease
06-16137

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Smith CountySmithVan ZandtGreggUpshurWoodRuskCampRainsHendersonSmith County
Smith County · RRC district 06Open Smith County →
Gas, last 12 months
39,720 mcf
Oil in Jul 2026
449 bbl
Reporting to the state
since May 2025
Wells
1

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Oil output fell 82% since May 2025

Monthly average of 512 bbl in the latest 3 months, against 2,855 bbl in the first 3.

  • Oil (bars, left axis)
  • Gas (line, right axis)
Oil output fell 82% since May 2025Monthly oil production and gas for KICKAPOO 'TP' 4, May 2025 to Jul 2026. Oil output fell 82% since May 2025. Monthly average of 512 bbl in the latest 3 months, against 2,855 bbl in the first 3.bbl per monthmcf per month001,0005,0002,00010k3,00015k4,00020k5,00025kJul 25OctJan 26AprJul
Oil output fell 82% since May 2025Monthly oil production and gas for KICKAPOO 'TP' 4, May 2025 to Jul 2026. Oil output fell 82% since May 2025. Monthly average of 512 bbl in the latest 3 months, against 2,855 bbl in the first 3.bbl per monthmcf per month001,0005,0002,00010k3,00015k4,00020k5,00025kJul 25Jan 26Jul

SourceTexas Railroad Commission Production Data Query, oil lease 16137, district 06. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

94% of the gas went to a transmission line in the last 12 months

Each bar is one month. Colors are the disposition codes the operator reported.

  • Transmission line (2)
  • Lease fuel (1)
94% of the gas went to a transmission line in the last 12 monthsShare of KICKAPOO 'TP' 4 gas by disposition code each month, May 2025 to Jul 2026. 94% of the gas went to a transmission line in the last 12 months. Share of the lease’s gas by disposition code, per month0%50%100%Jul 25OctJan 26AprJul
94% of the gas went to a transmission line in the last 12 monthsShare of KICKAPOO 'TP' 4 gas by disposition code each month, May 2025 to Jul 2026. 94% of the gas went to a transmission line in the last 12 months. Share of gas by disposition code0%50%100%Jul 25Jan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 16137, district 06. Reported through Jul 2026.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

Lease fuel (1)

Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

Faulconer Energy, LLC has reported this lease for the whole period

No change of operator in the months we hold.

Operators of this lease over timeFaulconer Energy, LLC, May 2025 to Jul 20262026Faulconer Energy, LLCMay 2025 to nowthrough Jul 2026
Operators of this lease over timeFaulconer Energy, LLC, May 2025 to Jul 20262026Faulconer Energy, LLCMay 2025 to nowthrough Jul 2026

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to oil lease 16137 in district 06. The API number is the state’s ID for a well.
Wells on KICKAPOO 'TP' 4
API numberWell no.Status
42-423-315751Active

SourceTexas Railroad Commission Wellbore Query, district 06, lease 16137.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Oil

    Dk Trading & Supply, LLC gathers it.

    100% of it, on the list since May 7, 2025

  • Gas from oil wells

    Faulconer Energy, LLC buys it; Midcoast Pipelines (E Tx) L.p. gathers it.

    Faulconer Energy, LLC buys it: 100% of it, on the list since May 7, 2025 · Midcoast Pipelines (E Tx) L.p. gathers it: 100% of it, on the list since May 7, 2025

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

40 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
0
First completion
May 7, 2025
Latest permit
Apr 7, 2025

A pooling certificate was filed

Your tract may share its production with neighbours in a pooled unit. The unit acres the operator uses to divide production can differ from the acreage on one permit.

Wells and acres on the permits for Kickapoo 'TP' 4
API numberWell no.Acreson the permit
42-423-31575140

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says KICKAPOO 'TP' 4 sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

15 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for KICKAPOO 'TP' 4
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Faulconer Energy,4495201,8491,7260$80.46$2.89
Jun 2026Faulconer Energy,5005202,0421,9080$84.81$3.15
May 2026Faulconer Energy,5886532,2752,1460$102.13$2.94
Apr 2026Faulconer Energy,6027872,3332,2000$100.32$2.77
Mar 2026Faulconer Energy,9426942,7642,5960$91.38$3.04
Feb 2026Faulconer Energy,4415222,3462,1870$64.51$3.62
Jan 2026Faulconer Energy,7906893,2183,0030$60.04$7.72
Dec 2025Faulconer Energy,7498222,8252,6470$57.97$4.26
Nov 2025Faulconer Energy,9171,0044,1203,8680$60.06$3.79
Oct 2025Faulconer Energy,1,0971,0415,0284,7240$60.89$3.19
Sep 2025Faulconer Energy,1,1631,2224,9674,6680$63.96$2.97
Aug 2025Faulconer Energy,1,4321,2175,9535,6000$64.86$2.91
Jul 2025Faulconer Energy,2,0122,12411,91611,2210$68.39$3.20
Jun 2025Faulconer Energy,1,9952,06412,33811,7180$68.17$3.02
May 2025Faulconer Energy,4,5594,25224,40923,2610$62.17$3.12

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for KICKAPOO 'TP' 4. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Faulconer Energy, LLC.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Faulconer Energy, LLC in Smith County

All Faulconer Energy, LLC leases →

Overton (Travis Peak) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 16137, district 06, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.