Skip to content
Royalty Clerk

Texas gas well · RRC district 06 · Lease 264654

Producing

KODIAK

Kodiak is a gas well in San Augustine County, Texas, operated by Rockcliff Energy Operating III in the Carthage (Haynesville Shale) field. The Railroad Commission shows 19,013 mcf of gas in the 12 months through Jul 2026.

Gas well dossier · 1 well

19,013mcf gas, last 12 months−45% vs prior year
RRC lease
06-264654

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

San Augustine CountySan AugustineNacogdochesShelbySabineAngelinaSan Augustine County
San Augustine County · RRC district 06Open San Augustine County →
Gas in Jul 2026
246 mcf
Reporting to the state
since Jan 2020
Wells
1
Data through
Jul 2026

Production

Month by month, from the state record

What the Railroad Commission says this gas well produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Gas output fell 45% over the last 12 months

19,013 mcf in the 12 months through Jul 2026, against 34,519 mcf in the 12 months before.

  • Gas (bars, left axis)
  • Last 12 months
Gas output fell 45% over the last 12 monthsMonthly gas production for KODIAK, Aug 2023 to Jul 2026. Gas output fell 45% over the last 12 months. 19,013 mcf in the 12 months through Jul 2026, against 34,519 mcf in the 12 months before.Last 12 months: 19,013 mcfmcf per month02,5005,0007,50010kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Gas output fell 45% over the last 12 monthsMonthly gas production for KODIAK, Aug 2023 to Jul 2026. Gas output fell 45% over the last 12 months. 19,013 mcf in the 12 months through Jul 2026, against 34,519 mcf in the 12 months before.Last 12 monthsmcf per month02,5005,0007,50010kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas well 264654, district 06. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

All of the gas went to a processing plant in the last 12 months

Each bar is one month. Colors are the disposition codes the operator reported.

All of the gas went to a processing plant in the last 12 monthsShare of KODIAK gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a processing plant in the last 12 months. Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
All of the gas went to a processing plant in the last 12 monthsShare of KODIAK gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a processing plant in the last 12 months. Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 264654, district 06. Reported through Jul 2026.

Processing plant (3)

Sent to a gas plant that pulls out natural gas liquids. Your statement should show plant products, and may show processing fees.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed 3 times, most recently in Dec 2025

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeContango Resources, Inc., Jan 2020 to Apr 2021; Fortune Resources LLC, May 2021 to Apr 2022; Pine Wave Energy Partners Op,llc, May 2022 to Nov 2025; Rockcliff Energy Operating III, Dec 2025 to Jul 20262020202120222023202420252026Changed May 2021Changed May 2022Changed Dec 2025Contango Resources, Inc.Jan 2020 to Apr 2021Fortune Resources LLCMay 2021 to Apr 2022Pine Wave Energy Partners Op,…May 2022 to Nov 2025Rockcliff Energy Operating IIIDec 2025 to now
Operators of this lease over timeContango Resources, Inc., Jan 2020 to Apr 2021; Fortune Resources LLC, May 2021 to Apr 2022; Pine Wave Energy Partners Op,llc, May 2022 to Nov 2025; Rockcliff Energy Operating III, Dec 2025 to Jul 20262020202120222023202420252026Changed May 2021Changed May 2022Changed Dec 2025Contango Resources, Inc.Jan 2020 to Apr 2021Fortune Resources LLCMay 2021 to Apr 2022Pine Wave Energy Partners Op,llcMay 2022 to Nov 2025Rockcliff Energy Operating IIIDec 2025 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to gas well 264654 in district 06. The API number is the state’s ID for a well.
Wells on KODIAK
API numberWell no.Status
42-405-303621HActive

SourceTexas Railroad Commission Wellbore Query, district 06, lease 264654.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Gas from gas wells

    Enterprise Products Operating LLC buys it; Energy Transfer Company gathers it.

    Enterprise Products Operating LLC buys it: 100% of it, on the list since Dec 1, 2025 · Energy Transfer Company gathers it: 100% of it, on the list since Apr 16, 2011

Companies that used to be listed: Etc Texas P/L, LTD (buys it, until Dec 1, 2025).

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

112.59 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
1
First completion
Apr 16, 2011
Latest permit
Jul 5, 2010
Wells and acres on the permits for Kodiak
API numberWell no.Acreson the permit
42-405-303621H112.59

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says KODIAK sold each month.

For example 0.00097656, or a fraction like 1/1024.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Gas sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for KODIAK
MonthGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Rockcliff Energy2462460$80.46$2.89
Jun 2026Rockcliff Energy33330$84.81$3.15
May 2026Rockcliff Energy2,6252,6250$102.13$2.94
Apr 2026Rockcliff Energy7,9847,9840$100.32$2.77
Mar 2026Rockcliff Energy000$91.38$3.04
Feb 2026Rockcliff Energy000$64.51$3.62
Jan 2026Rockcliff Energy5875870$60.04$7.72
Dec 2025Rockcliff Energy2,0592,0590$57.97$4.26
Nov 2025Pine Wave4,6194,6190$60.06$3.79
Oct 2025Pine Wave6686680$60.89$3.19
Sep 2025Pine Wave1311310$63.96$2.97
Aug 2025Pine Wave61610$64.86$2.91
Jul 2025Pine Wave1931930$68.39$3.20
Jun 2025Pine Wave1701700$68.17$3.02
May 2025Pine Wave1511510$62.17$3.12
Apr 2025Pine Wave3913910$63.54$3.42
Mar 2025Pine Wave2,0702,0700$68.24$4.12
Feb 2025Pine Wave1,7201,7200$71.53$4.19
Jan 2025Pine Wave4,3074,3070$75.74$4.13
Dec 2024Pine Wave8,2418,2410$70.12$3.01
Nov 2024Pine Wave1,2441,2440$69.95$2.12
Oct 2024Pine Wave9,1259,1250$71.99$2.20
Sep 2024Pine Wave5,4845,4840$70.24$2.28
Aug 2024Pine Wave1,4231,4230$76.68$1.99
Jul 2024Pine Wave3563560$81.80$2.07
Jun 2024Pine Wave6,2006,2000$79.77$2.54
May 2024Pine Wave5,7395,7390$80.02$2.12
Apr 2024Pine Wave6,7096,7090$85.35$1.60
Mar 2024Pine Wave6,2716,2710$81.28$1.49
Feb 2024Pine Wave5,5765,5760$77.25$1.72
Jan 2024Pine Wave7,1957,1950$74.15$3.18
Dec 2023Pine Wave9,7919,7910$71.90$2.52
Nov 2023Pine Wave7,7757,7750$77.69$2.71
Oct 2023Pine Wave9,4169,4160$85.64$2.98
Sep 2023Pine Wave6,0546,0540$89.43$2.64
Aug 2023Pine Wave6,6136,6130$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for KODIAK. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Rockcliff Energy Operating III.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Rockcliff Energy Operating III in San Augustine County

All Rockcliff Energy Operating III leases →

Carthage (Haynesville Shale) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Gas sold” volume for the month the check covers and multiply it by your decimal. The answer should match the mcf on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, gas well 264654, district 06, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.

FAQ

Questions about KODIAK

Who operates the KODIAK lease?

The Railroad Commission lists Rockcliff Energy Operating III (operator number 103732) as the operator of this lease in San Augustine County, Texas. The operator history on this page shows earlier operators and when the record changed.

How much has the KODIAK lease produced?

The lease reported 19,013 mcf of gas in the last 12 months through Jul 2026. Monthly figures for 36 months are in the ledger on this page, taken from the Railroad Commission's production data.

Does this page show who owns the royalty?

No. Railroad Commission records show who operates a lease and what it reported, not who owns the minerals or receives royalty. Your division order and royalty stub name the lease and your decimal interest.

How do I check my royalty stub against this lease?

Multiply the lease's volume for a month by your decimal interest and compare it with the barrels and mcf on your stub for the same month. The two are seldom identical, since sales and reporting months can differ, but a large gap is worth a question to the operator.

Check my statement