Skip to content
Royalty Clerk

Texas oil lease

Producing

LAZY M 1-30

Lazy M 1-30 is an oil lease in Ward County, Texas, operated by Apache Corporation in the Two Georges (Bone Spring) field.

2 wells

12,250bbl oil, last 12 months−58% vs prior year
RRC lease
08-42893

Is your check right?

Check my statement

Where it sits

This county

Ward CountyWardWinklerCraneLovingReevesEctorWard County
Ward County
Gas, last 12 months
24,793 mcf
Oil in Jul 2026
1,015 bbl

Production by month

Oil output fell 58% over the last 12 months

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output fell 58% over the last 12 monthsMonthly oil production and gas for LAZY M 1-30, Aug 2023 to Jul 2026. Oil output fell 58% over the last 12 months. 12,250 bbl in the 12 months through Jul 2026, against 28,824 bbl in the 12 months before.Last 12 months: 12,250 bblbbl per monthmcf per month001,0002,5002,0005,0003,0007,5004,00010kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 58% over the last 12 monthsMonthly oil production and gas for LAZY M 1-30, Aug 2023 to Jul 2026. Oil output fell 58% over the last 12 months. 12,250 bbl in the 12 months through Jul 2026, against 28,824 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month001,0002,5002,0005,0003,0007,5004,00010kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

Since Jul 2024 the lease's gas goes to a processing plant instead of lease fuel

Flaring peaked at 100.0% of the gas in Jan 2026.

  • Processing plant (3)
  • Lease fuel (1)
  • Flared (4)
Since Jul 2024 the lease's gas goes to a processing plant instead of lease fuelShare of LAZY M 1-30 gas by disposition code each month, Aug 2023 to Jul 2026. Since Jul 2024 the lease's gas goes to a processing plant instead of lease fuel. Flaring peaked at 100.0% of the gas in Jan 2026.Share of the lease’s gas by disposition code, per month0%50%100%Jul 2024: fuel to plantFlared 100.0%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Jul 2024 the lease's gas goes to a processing plant instead of lease fuelShare of LAZY M 1-30 gas by disposition code each month, Aug 2023 to Jul 2026. Since Jul 2024 the lease's gas goes to a processing plant instead of lease fuel. Flaring peaked at 100.0% of the gas in Jan 2026.Share of gas by disposition code0%50%100%Jul 24: fuel to plantFlared 100.0%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Processing plant (3)

    91% · 22,602 mcf

  • Flared (4)

    8.8% · 2,191 mcf

8.8% of the gas flared in the last 12 months. 4 months above 3%.

Who has run this lease

The operator changed once, most recently in Aug 2024

Operators of this lease over timeCallon Petroleum Operating Co, Jan 2020 to Jul 2024; Apache Corporation, Aug 2024 to Jul 20262020202120222023202420252026Changed Aug 2024Callon Petroleum Operating CoJan 2020 to Jul 2024Apache CorporationAug 2024 to now
Operators of this lease over timeCallon Petroleum Operating Co, Jan 2020 to Jul 2024; Apache Corporation, Aug 2024 to Jul 20262020202120222023202420252026Changed Aug 2024Callon Petroleum Operating CoJan 2020 to Jul 2024Apache CorporationAug 2024 to now

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

2 wells on this lease

Wells on LAZY M 1-30
API numberWell no.Status
42-475-357221HActive
42-475-358822HActive

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Enterprise Crude Pipeline LLCOilGathers80Sep 11, 2019–
Enterprise Crude Oil LLCOilGathers10Sep 11, 2019–
Rio Energy International, Inc.OilGathers10Sep 17, 2018–
Targa Midstream Services LLCCasinghead gasBuys100Sep 17, 2018–
Targa Midstream Services LLCCasinghead gasGathers100Aug 25, 2011–
Enterprise Crude Pipeline LLCOilGathers90Sep 17, 2018Sep 11, 2019

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

323.77 acres on the newest permit

Permits for Lazy M 1-30
API numberWell no.Acreson the permit
42-475-358822H323.77
42-475-357221H323.77

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

What APA Corporation told investors it received

Apache Corporation is linked to APA Corporation (APA).
Realized prices reported by APA Corporation
QuarterOil$ per bblFiling
Q2 2026$98.24SEC filing
Q1 2026$78.69SEC filing
Q4 2025$61.03SEC filing
Q3 2025$67.43SEC filing
Q2 2025$65.58SEC filing
Q1 2025$73.73SEC filing

SourceAPA Corporation quarterly reports, SEC EDGAR, company-wide averages before hedging.

Estimate your royalty

36 months, newest first

Ledger for LAZY M 1-30
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 2026Apache Corporation1,0151,1751,5691,138431$80.46$2.89
Jun 2026Apache Corporation9098032,3882,32365$84.81$3.15
May 2026Apache Corporation8068741,7761,7697$102.13$2.94
Apr 2026Apache Corporation6795051,5241,46163$100.32$2.77
Mar 2026Apache Corporation1,5111,7802,7931,1881,605$91.38$3.04
Feb 2026Apache Corporation3421121,0531,0530$64.51$3.62
Jan 2026Apache Corporation07420020$60.04$7.72
Dec 2025Apache Corporation8818871,6021,6020$57.97$4.26
Nov 2025Apache Corporation1,5311,9722,6992,6990$60.06$3.79
Oct 2025Apache Corporation1,7471,5442,9232,9230$60.89$3.19
Sep 2025Apache Corporation1,1981,1842,9652,9650$63.96$2.97
Aug 2025Apache Corporation1,6311,1773,4813,4810$64.86$2.91
Jul 2025Apache Corporation1892641,5761,5760$68.39$3.20
Jun 2025Apache Corporation2537001,6631,6630$68.17$3.02
May 2025Apache Corporation1,7561,7504,8434,8430$62.17$3.12
Apr 2025Apache Corporation2,7542,5507,2277,2261$63.54$3.42
Mar 2025Apache Corporation3,0993,0627,6017,6001$68.24$4.12
Feb 2025Apache Corporation2,9592,8886,6876,6834$71.53$4.19
Jan 2025Apache Corporation3,0733,2597,2957,2950$75.74$4.13
Dec 2024Apache Corporation3,2183,1307,2827,2820$70.12$3.01
Nov 2024Apache Corporation2,9632,7996,9576,9570$69.95$2.12
Oct 2024Apache Corporation3,1273,1887,0677,0670$71.99$2.20
Sep 2024Apache Corporation3,2443,1656,3736,3730$70.24$2.28
Aug 2024Apache Corporation2,1892,1586,4616,4610$76.68$1.99
Jul 2024Callon Petroleum1,7291,7934,9574,3990$81.80$2.07
Jun 2024Callon Petroleum6705749624220$79.77$2.54
May 2024Callon Petroleum1144000$80.02$2.12
Apr 2024Callon Petroleum2,1902,2965,4124,8720$85.35$1.60
Mar 2024Callon Petroleum3,9213,8137,5647,0060$81.28$1.49
Feb 2024Callon Petroleum2,4002,3344,8324,3100$77.25$1.72
Jan 2024Callon Petroleum3,0713,1925,4654,88918$74.15$3.18
Dec 2023Callon Petroleum3,8423,8398,3447,7815$71.90$2.52
Nov 2023Callon Petroleum3,7173,7197,5537,0076$77.69$2.71
Oct 2023Callon Petroleum3,2563,2286,7626,2040$85.64$2.98
Sep 2023Callon Petroleum3,4653,3596,9246,9240$89.43$2.64
Aug 2023Callon Petroleum2,0722,1914,5584,0000$81.39$2.58

Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Apache Corporation in Ward County

All Apache Corporation leases →

Two Georges (Bone Spring) field

All leases in this field →

Leases within 10 km

Drilling permits within 10 km