Masterson "A" is an oil lease in Potter County, Texas, in the Panhandle (Red Cave) field. It stopped producing after July 2017: nothing has been reported for 9 years 1 month since. Reneau Oil Co was its last operator.
This lease has stopped
Jul 2017last month with oil or gas
Nothing reported for 9 years 1 month since, through Aug 2026.
Its whole life in the Railroad Commission’s monthly reports, which start in January 1993; it was already producing then. Royalty owners and their heirs can still be on the county roll after the checks stop.
What its oil and gas sold for each year since 1993$ a year, at each month's pricessilent
Masterson "A": what its oil and gas sold for each year, 1993 to 2026Masterson "A": what its oil and gas sold for each year, 1993 to 2026. The best year was 1997, with $33,000 sold. It stopped producing after July 2017; nothing since, through August 2026.SILENT9 YR 1 MOBest year 1997 · $33.3kLast production Jul 2017199319972001200520092013201720212025
Masterson "A": what its oil and gas sold for each year, 1993 to 2026Masterson "A": what its oil and gas sold for each year, 1993 to 2026. The best year was 1997, with $33,000 sold. It stopped producing after July 2017; nothing since, through August 2026.SILENT9 YR 1 MOBest year 1997 · $33.3kLast production Jul 201719932002201120202026
Already producing1993when the state's records start
Best year1997$33,000 sold
Last operatorReneau Oil Co.from Jan 2020
Last productionJul 2017
Silent for9 years 1 monththrough Aug 2026
Oil sold since 1993
9,621barrels
Gas sold since 1993
32,014thousand cubic feet (mcf)
Sold for, in all
$416,000at each month's public prices, 100% of the lease
Source: Texas Railroad Commission production reports since January 1993 (oil and gas sold); EIA prices, through August 2026.
Every year as a table
Masterson "A": oil and gas sold each year
Year
Months
Oil sold, bbl
Gas sold, mcf
Sold for
2026 *
0
0
0
$0
2025
0
0
0
$0
2024
0
0
0
$0
2023
0
0
0
$0
2022
0
0
0
$0
2021
9
0
0
$0
2020
12
0
0
$0
2019
12
0
0
$0
2018
12
0
0
$0
2017
12
98
300
$6,146
2016
12
338
1,075
$13,734
2015
12
0
1,740
$4,521
2014
12
84
2,091
$17,662
2013
12
170
1,342
$21,424
2012
12
82
601
$8,301
2011
12
220
180
$21,436
2010
12
178
35
$14,070
2009
12
339
198
$21,633
2008
12
169
328
$20,828
2007
12
104
144
$7,794
2006
12
213
144
$15,094
2005
12
286
504
$21,022
2004
12
289
393
$14,037
2003
12
394
500
$14,715
2002
12
491
880
$14,908
2001
12
839
3,351
$32,368
2000
12
541
1,315
$22,051
1999
12
192
701
$4,677
1998
12
682
9,575
$30,229
1997
12
939
5,744
$33,291
1996
12
265
386
$6,732
1995
12
1,242
487
$23,778
1994
12
1,249
0
$22,454
1993
12
217
0
$4,003
* Part of the year: the records run through August 2026.
For families and heirs
What an heir can do next
1
Search the family name
Type the name from an old check stub, a deed or the will. We search every county roll we hold and the state's records.
Where the state's map puts this lease's 2 wells, and what has been drilled or permitted within about 2 miles of them.
This lease2Its wells, ringed on the map: none producing
Drilling locations0Permits issued in the last two years
Producing wells199On a lease reporting production now
Not producing77Shut in, inactive or no lease on record
Plugged47The state's wellbore record says plugged
The 2 ringed dots are this lease's wells, each where the Railroad Commission's map puts it. The other dots are wells and drilling permits of the last 24 months on the land around it; the counts are for everything in the picture, which is about 6 miles across. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines, base map from USGS The National Map.
A one-page map of this lease to print, for a lawyer, a buyer or a probate file.
Use this map on your site
You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.
<a href="https://royaltyclerk.com/texas/leases/masterson-a-10-05933"><img src="https://royaltyclerk.com/maps/lease-wells/masterson-a-10-05933.svg" alt="Map of the Masterson "A" lease in Potter County, Texas: its 2 wells ringed, among 323 wells and 0 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/masterson-a-10-05933">Wells on the Masterson "A" lease, Potter County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>
Other leases named Masterson "A"
3 leases share this name in district 10. The Railroad Commission gives each gas well its own number and each oil lease another, so one unit often shows up as several of these.
9 leases in Potter County in the same field or with the same operator carry the Masterson name. Operators often name the leases on one family's land alike, with a letter or unit number after the name. Sharing a name proves no tie: your division order says which ones pay you.
The state shows zero oil and zero gas for all 21 months we hold (Jan 2020 to Sep 2021). A lease that is shut in or newly reported looks like this. The ledger below lists each month. Its whole life is charted at the top of the page.
Where the gas went
No gas disposition reported for this lease
The operator has not reported where the gas went in the months we hold.
2 wells on this lease
Wells on MASTERSON "A"
API number
Well
Status
Completed
42-375-31121
Masterson "A" 1103
Shut in
Sep 6, 1984
42-375-31123
Masterson "A" 1104
Shut in
Sep 21, 1984
SourceTexas Railroad Commission production records and full wellbore file.
Buyers and gatherers
Companies named on the Form P-4, by product
Company
Product
Role
Share%
From
Cp Energy, L.l.c.
Oil
Gathers
100
Feb 1, 2015
Pioneer Natural Res. Usa, Inc.
Casinghead gas
Buys
100
Jan 24, 2011
Pioneer Natural Res. Usa, Inc.
Casinghead gas
Gathers
100
Jan 24, 2011
SourceRailroad Commission Form P-4 file, Oct 24, 2026 (source).