Skip to content

Texas gas well · RRC district 06 · Lease 132267

Producing

MURPHY

Murphy is a gas well in Smith County, Texas, operated by Flint Pipeline Company in the S.w. Bullard (Rodessa) field. The Railroad Commission shows 1,213 mcf of gas in the 12 months through Jun 2026.

Gas well dossier · 1 well

1,213mcf gas, last 12 months−8% vs prior year
RRC lease
06-132267

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Smith CountySmithVan ZandtGreggUpshurWoodRuskCampRainsHendersonSmith County
Smith County · RRC district 06Open Smith County →
Oil, last 12 months
746 bbl
Gas in Jun 2026
101 mcf
Reporting to the state
since Jan 2020
Wells
1

Production

Month by month, from the state record

What the Railroad Commission says this gas well produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Gas output fell 8% over the last 12 months

1,112 mcf in the 12 months through Jul 2026, against 1,209 mcf in the 12 months before. Jul 2026 was not reported. A red cross marks each one.

  • Gas (bars, left axis)
  • Oil (line, right axis)
  • Last 12 months
Gas output fell 8% over the last 12 monthsMonthly gas production and oil for MURPHY, Aug 2023 to Jul 2026. Gas output fell 8% over the last 12 months. 1,112 mcf in the 12 months through Jul 2026, against 1,209 mcf in the 12 months before.Last 12 months: 1,112 mcfmcf per monthbbl per month0025505010075150100200125250Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Gas output fell 8% over the last 12 monthsMonthly gas production and oil for MURPHY, Aug 2023 to Jul 2026. Gas output fell 8% over the last 12 months. 1,112 mcf in the 12 months through Jul 2026, against 1,209 mcf in the 12 months before.Last 12 monthsmcf per monthbbl per month0025505010075150100200125250Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas well 132267, district 06. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

All of the gas went to lease fuel in the last 12 months

Each bar is one month. Colors are the disposition codes the operator reported.

All of the gas went to lease fuel in the last 12 monthsShare of MURPHY gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to lease fuel in the last 12 months. Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
All of the gas went to lease fuel in the last 12 monthsShare of MURPHY gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to lease fuel in the last 12 months. Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 132267, district 06. Reported through Jul 2026.

Lease fuel (1)

Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

Flint Pipeline Company has reported this lease for the whole period

No change of operator in the months we hold.

Operators of this lease over timeFlint Pipeline Company, Jan 2020 to Jun 20262020202120222023202420252026Flint Pipeline CompanyJan 2020 to nowthrough Jul 2026
Operators of this lease over timeFlint Pipeline Company, Jan 2020 to Jun 20262020202120222023202420252026Flint Pipeline CompanyJan 2020 to nowthrough Jul 2026

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to gas well 132267 in district 06. The API number is the state’s ID for a well.
Wells on MURPHY
API numberWell no.Status
42-423-311752Active

SourceTexas Railroad Commission Wellbore Query, district 06, lease 132267.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Condensate

    Plains Marketing, L.p. gathers it.

    100% of it, on the list since Jul 1, 2000

  • Gas from gas wells

    Centerpoint Energy Entex buys and gathers it; Nominator Not Required / Swr 31 nominates it.

    Centerpoint Energy Entex buys it: 100% of it, on the list since Jul 1, 2003 · Centerpoint Energy Entex gathers it: 100% of it, on the list since Jul 1, 2003 · Nominator Not Required / Swr 31 nominates it: 100% of it, on the list since Apr 1, 1994

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

680.69 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
0
First completion
Sep 10, 1989
Latest permit
Oct 20, 1989

A pooling certificate was filed

Your tract may share its production with neighbours in a pooled unit. The unit acres the operator uses to divide production can differ from the acreage on one permit.

Wells and acres on the permits for Murphy
API numberWell no.Acreson the permit
42-423-311752680.69

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says MURPHY sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Gas sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for MURPHY
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026No report–––––$80.46$2.89
Jun 2026Flint Pipeline41010100$84.81$3.15
May 2026Flint Pipeline55010200$102.13$2.94
Apr 2026Flint Pipeline2712310200$100.32$2.77
Mar 2026Flint Pipeline0010100$91.38$3.04
Feb 2026Flint Pipeline75010200$64.51$3.62
Jan 2026Flint Pipeline80010100$60.04$7.72
Dec 2025Flint Pipeline7117110100$57.97$4.26
Nov 2025Flint Pipeline90010000$60.06$3.79
Oct 2025Flint Pipeline8419410000$60.89$3.19
Sep 2025Flint Pipeline100010100$63.96$2.97
Aug 2025Flint Pipeline7317510100$64.86$2.91
Jul 2025Flint Pipeline50010100$68.39$3.20
Jun 2025Flint Pipeline50010000$68.17$3.02
May 2025Flint Pipeline5013810100$62.17$3.12
Apr 2025Flint Pipeline50010100$63.54$3.42
Mar 2025Flint Pipeline50010200$68.24$4.12
Feb 2025Flint Pipeline6518510100$71.53$4.19
Jan 2025Flint Pipeline105010000$75.74$4.13
Dec 2024Flint Pipeline5419410100$70.12$3.01
Nov 2024Flint Pipeline115010000$69.95$2.12
Oct 2024Flint Pipeline10213210100$71.99$2.20
Sep 2024Flint Pipeline12918010100$70.24$2.28
Aug 2024Flint Pipeline100010000$76.68$1.99
Jul 2024Flint Pipeline2218110100$81.80$2.07
Jun 2024Flint Pipeline35010100$79.77$2.54
May 2024Flint Pipeline50010000$80.02$2.12
Apr 2024Flint Pipeline4019010100$85.35$1.60
Mar 2024Flint Pipeline30010000$81.28$1.49
Feb 2024Flint Pipeline10010200$77.25$1.72
Jan 2024Flint Pipeline5010000$74.15$3.18
Dec 2023Flint Pipeline10010100$71.90$2.52
Nov 2023Flint Pipeline5010000$77.69$2.71
Oct 2023Flint Pipeline5010100$85.64$2.98
Sep 2023Flint Pipeline10010000$89.43$2.64
Aug 2023Flint Pipeline9010000$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for MURPHY. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Flint Pipeline Company.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Flint Pipeline Company in Smith County

All Flint Pipeline Company leases →

S.w. Bullard (Rodessa) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Gas sold” volume for the month the check covers and multiply it by your decimal. The answer should match the mcf on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jun 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, gas well 132267, district 06, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.