Skip to content

Texas oil lease · RRC district 01 · Lease 16364

Producing

NORTHCUT B

Northcut B is an oil lease in LA Salle County, Texas, operated by Javelin Energy Partners Mgmt LLC in the Eagleville (Eagle Ford-1) field. The Railroad Commission shows 13,825 bbl of oil in the 12 months through Jul 2026.

Oil lease dossier · 7 wells

13,825bbl oil, last 12 months−9% vs prior year
RRC lease
01-16364

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

LA Salle CountyLA SalleZavalaAtascosaMcMullenDimmitFrioLA Salle County
LA Salle County · RRC district 01Open LA Salle County →
Gas, last 12 months
19,220 mcf
Oil in Jul 2026
710 bbl
Reporting to the state
since Jan 2020
Wells
7

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Oil output fell 9% over the last 12 months

13,825 bbl in the 12 months through Jul 2026, against 15,136 bbl in the 12 months before.

  • Oil (bars, left axis)
  • Gas (line, right axis)
  • Last 12 months
Oil output fell 9% over the last 12 monthsMonthly oil production and gas for NORTHCUT B, Aug 2023 to Jul 2026. Oil output fell 9% over the last 12 months. 13,825 bbl in the 12 months through Jul 2026, against 15,136 bbl in the 12 months before.Last 12 months: 13,825 bblbbl per monthmcf per month005001,0001,0002,0001,5003,0002,0004,0002,5005,000Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 9% over the last 12 monthsMonthly oil production and gas for NORTHCUT B, Aug 2023 to Jul 2026. Oil output fell 9% over the last 12 months. 13,825 bbl in the 12 months through Jul 2026, against 15,136 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month005001,0001,0002,0001,5003,0002,0004,0002,5005,000Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, oil lease 16364, district 01. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

Since Feb 2026 the lease's gas goes to a transmission line instead of lease fuel

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

  • Processing plant (3)
  • Transmission line (2)
  • Lease fuel (1)
Since Feb 2026 the lease's gas goes to a transmission line instead of lease fuelShare of NORTHCUT B gas by disposition code each month, Aug 2023 to Jul 2026. Since Feb 2026 the lease's gas goes to a transmission line instead of lease fuel. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of the lease’s gas by disposition code, per month0%50%100%Feb 2026: fuel to lineOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Feb 2026 the lease's gas goes to a transmission line instead of lease fuelShare of NORTHCUT B gas by disposition code each month, Aug 2023 to Jul 2026. Since Feb 2026 the lease's gas goes to a transmission line instead of lease fuel. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of gas by disposition code0%50%100%Feb 26: fuel to lineJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 16364, district 01. Reported through Jul 2026.

Processing plant (3)

Sent to a gas plant that pulls out natural gas liquids. Your statement should show plant products, and may show processing fees.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

Lease fuel (1)

Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed 2 times, most recently in Feb 2025

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeMatador Production Company, Jan 2020 to Jul 2024; Ridgemar Energy Operating, LLC, Aug 2024 to Jan 2025; Javelin Energy Partners Mgmt LLC, Feb 2025 to Jul 20262020202120222023202420252026Changed Aug 2024Changed Feb 2025Matador Production CompanyJan 2020 to Jul 2024Ridgemar Energy Operating, LLCAug 2024 to Jan 2025Javelin Energy Partners Mgmt…Feb 2025 to now
Operators of this lease over timeMatador Production Company, Jan 2020 to Jul 2024; Ridgemar Energy Operating, LLC, Aug 2024 to Jan 2025; Javelin Energy Partners Mgmt LLC, Feb 2025 to Jul 20262020202120222023202420252026Changed Aug 2024Changed Feb 2025Matador Production CompanyJan 2020 to Jul 2024Ridgemar Energy Operating, LLCAug 2024 to Jan 2025Javelin Energy Partners Mgmt LLCFeb 2025 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

7 wells on this lease

Every well the Railroad Commission links to oil lease 16364 in district 01. The API number is the state’s ID for a well.
Wells on NORTHCUT B
API numberWell no.Status
42-283-332101HActive
42-283-332682HActive
42-283-335183HActive
42-283-335614HActive
42-283-344597HActive
42-283-346705HActive
42-283-346716HActive

SourceTexas Railroad Commission Wellbore Query, district 01, lease 16364.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Oil

    Plains Marketing, L.p. and Plains Pipeline L.p. gather it.

    Plains Marketing, L.p. gathers it: 60% of it, on the list since Aug 1, 2024 · Plains Pipeline L.p. gathers it: 40% of it, on the list since Aug 1, 2024

  • Gas from oil wells

    Enterprise Hydrocarbons, L.p. buys it; Enterprise Products Operating LLC gathers it.

    Enterprise Hydrocarbons, L.p. buys it: 100% of it, on the list since Jun 1, 2014 · Enterprise Products Operating LLC gathers it: 100% of it, on the list since Jun 1, 2014

Companies that used to be listed: Plains Marketing, L.p. (gathers it, until Aug 1, 2024); Plains Pipeline L.p. (gathers it, until Aug 1, 2024); Eastex Crude Company (gathers it, until May 1, 2020); Enterprise Crude Oil LLC (gathers it, until May 1, 2020); Plains Marketing, L.p. (gathers it, until May 1, 2020); Plains Pipeline L.p. (gathers it, until May 1, 2020).

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

330.46 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
77 not plugged
Horizontal
7
First completion
Sep 6, 2012
Latest permit
Apr 7, 2014

The wells on this lease state different acreage

The permits state between 330.46 and 360.46 acres. Use the acres from your own division order for the well you are paid on.

7 wells are listed on this lease

Each well can have its own unit. The decimal for one well does not have to equal the decimal for another.

Wells and acres on the permits for Northcut B
API numberWell no.Acreson the permit
42-283-346705H330.46
42-283-346716H330.46
42-283-344597H360.46
42-283-335614H330.46
42-283-335183H330.46
42-283-332682H330.46
42-283-332101H330.46

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says NORTHCUT B sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for NORTHCUT B
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Javelin Energy7107751,3111,3110$80.46$2.89
Jun 2026Javelin Energy7817061,2591,2430$84.81$3.15
May 2026Javelin Energy6897861,2331,1430$102.13$2.94
Apr 2026Javelin Energy7649021,5961,2510$100.32$2.77
Mar 2026Javelin Energy8867951,3601,0150$91.38$3.04
Feb 2026Javelin Energy9788711,3237600$64.51$3.62
Jan 2026Javelin Energy9361,0731,5601280$60.04$7.72
Dec 2025Javelin Energy1,6461,6702,4103160$57.97$4.26
Nov 2025Javelin Energy1,4121,4961,3805540$60.06$3.79
Oct 2025Javelin Energy1,5021,4131,2351,2350$60.89$3.19
Sep 2025Javelin Energy1,3771,6721,8321,8320$63.96$2.97
Aug 2025Javelin Energy2,1441,8962,7212,7210$64.86$2.91
Jul 2025Javelin Energy2,1901,9912,7652,7650$68.39$3.20
Jun 2025Javelin Energy00000$68.17$3.02
May 2025Javelin Energy80000$62.17$3.12
Apr 2025Javelin Energy5586327887880$63.54$3.42
Mar 2025Javelin Energy1,1571,1541,5641,5640$68.24$4.12
Feb 2025Javelin Energy1,2661,2421,9771,9770$71.53$4.19
Jan 2025Ridgemar Energy1,7721,8203,0663,0660$75.74$4.13
Dec 2024Ridgemar Energy1,7041,8992,8292,8290$70.12$3.01
Nov 2024Ridgemar Energy1,8171,7282,8522,7890$69.95$2.12
Oct 2024Ridgemar Energy1,4971,5102,8492,7230$71.99$2.20
Sep 2024Ridgemar Energy1,5561,6423,1502,9880$70.24$2.28
Aug 2024Ridgemar Energy1,6111,6173,4003,2670$76.68$1.99
Jul 2024Matador Production1,7561,5873,3623,2120$81.80$2.07
Jun 2024Matador Production1,5391,5372,9182,7970$79.77$2.54
May 2024Matador Production1,7061,7383,3243,1970$80.02$2.12
Apr 2024Matador Production1,5741,5713,0152,8950$85.35$1.60
Mar 2024Matador Production1,8201,7853,3873,2220$81.28$1.49
Feb 2024Matador Production1,6721,8593,2843,0900$77.25$1.72
Jan 2024Matador Production1,7641,7603,6633,4540$74.15$3.18
Dec 2023Matador Production2,0642,1134,4354,2860$71.90$2.52
Nov 2023Matador Production1,9842,0494,2974,1800$77.69$2.71
Oct 2023Matador Production2,2002,1534,4674,3720$85.64$2.98
Sep 2023Matador Production1,9301,9514,1024,0240$89.43$2.64
Aug 2023Matador Production2,2822,3984,6114,5330$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for NORTHCUT B. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Javelin Energy Partners Mgmt LLC.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Javelin Energy Partners Mgmt LLC in LA Salle County

All Javelin Energy Partners Mgmt LLC leases →

Eagleville (Eagle Ford-1) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

  • NORTHCUT BA SA

    3,864 bbl last 12 months · 0 km away

  • NORTHCUT A

    16,163 bbl last 12 months · 0.2 km away

  • JEA A

    12,894 bbl last 12 months · 0.9 km away

  • NEWMAN

    141,918 bbl last 12 months · 1.1 km away

  • JEA B

    13,037 bbl last 12 months · 1.1 km away

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 16364, district 01, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.