Skip to content
A-171 · SEC. 14 · BLK 8 · I&GN RR COA-174 · SEC. 17 · BLK 8 · I&GN RR COA-403 · SEC. 1267 · AB&MA-674 · SEC. 2209 · ELLEY, GA-175 · SEC. 18 · BLK 8 · I&GN RR COA-435 · SEC. 24 · I&GN RR COA-705 · SEC. 2220 · STAPP, H SU 4HA-171SEC. 14 · BLK 8 · I&GN RR COA-174SEC. 17 · BLK 8 · I&GN RR COA-403SEC. 1267 · AB&MA-674SEC. 2209 · ELLEY, GA-175SEC. 18 · BLK 8 · I&GN RR COA-435SEC. 24 · I&GN RR COA-705SEC. 2220 · STAPP, H SPGE DOS · 15,729 ACRESN1 mile28.0825° N 99.8575° W · PHOTO: U.S. GEOLOGICAL SURVEY

Texas gas wellRRC 01-286804Producing

Pge Dos

One well on 15,729 acres in Webb County. The lease produced 358,067 thousand cubic feet of gas in the last 12 months, through August 2026.

Is your family on this lease?

Email me when this lease changesI own here

County
Webb
On record since
October 2018
Newest report on file
August 2026
Unit on the newest permit
15,729 acres

Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.

Eight things the public record says about this lease. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

The story, from 95 monthly reports

2018 to 2026: it sold the most in 2022

Gas sold each month since October 2018The numbers match the paragraphs below
201920202021202220232024202520261Oct 2018220223Nov 20234May 20265August 2026Oct 2018 onward

October 2018: the first month the lease sold gas on record, 19,541 thousand cubic feet.

2022: the year the lease sold the most, $10.2 million of oil and gas at public prices.

November 2023: Silverbow Resources Oper, LLC took over from Chesapeake Operating, L.L.C..

May 2026: Crescent Energy Operating, LLC took over from Silverbow Resources Oper, LLC.

August 2026 is the newest monthly production report on file.

SourceRailroad Commission production reports, October 2018 through August 2026. Not a forecast, not reserves.

Checks stopped on this lease?

Operator

Operator changed: Crescent Energy Operating, LLC took over from Silverbow Resources Oper, LLC in May 2026.

Sales

Sales over the last 3 months fell to 0% of the 9 months before.

SourceRailroad Commission production, P-5 and P-4 records, data through August 2026.See why checks stop on this lease

95 months against 7 other recordsNew

Every month since October 2018, and what else happened that month

The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.

Mar 2025
27,214 mcf · down 43.6% on the three months before
Gas averaged $4.12 an mcf · Silverbow Resources Oper, LLC
  • No public record explains this drop.
SINCEOCT 20182020202220242026040K80K120K160KMCF A MONTH1 NEW WELLLAST 12 MONTHS123456WEATHERTHE STATEGAS PRICENEXT DOOROPERATORBUYERSTHE FIELDChesapeake Operating, L.L.C.Silverbow Resources Oper, LLC20192020202120222023202420252026
Six drops

Move the pointer or drag across the chart. The numbered buttons jump to each drop.

Monthly gas sold from this lease since October 2018, with eight record tracks beneath it. Use the left and right arrow keys to move month by month.. 95 months from October 2018 to August 2026. The most in one month: 135,864 mcf, January 2020. The newest month: 115 mcf. 5 months with nothing reported. Moments marked: 1, Jan 2019; 2, Apr 2022; 3, Jan 2024; 4, Feb 2024; 5, Mar 2024; 6, Mar 2025.

SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through August 2026.

Royalty Watch tells you the month a drop starts, with the records from that month.Watch this lease

92 months, one line eachNew

No consecutive silent months from October 2018 through May 2026

A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.

0

runs of two or more months with nothing reported, from October 2018 through May 2026. The reports on file for June 2026 and July 2026 show no oil and no gas.

115

thousand cubic feet of gas and 40 barrels of oil on the newest report on file with oil or gas, for August 2026, the State's newest month.

91

of 92 months with oil or gas reported since October 2018.

981

thousand cubic feet of gas a day on average from September 2025 through August 2026, counting a month with no report on file as zero.

October 2018Taller line, more gas soldMay 2026
20192020202120222023202420252026

A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.

SourceRailroad Commission production reports, October 2018 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.

Royalty Watch tells you when a silent month starts, and drafts the letter asking whether the lease is still in force.Watch this lease

9 years of state records, 2018 to 2026

Sold since October 2018

$44million

Sales at public prices before tax and deductions. Multiply by your decimal interest to estimate your share.

Oil sold
361,262barrels
Gas sold
6,218,588thousand cubic feet
Best year
2022$10.2 million sold
Sold each year, at that month's pricesOilGas
What the oil and gas from this lease sold for each year, 2018 to 2026, at each month's public prices.
YearOil, dollarsGas, dollarsTotal
2018$421,000$259,000$680,000
2019$5.3 million$2.77 million$8.06 million
2020$2.95 million$2.59 million$5.54 million
2021$3.35 million$3.57 million$6.93 million
2022$4.16 million$6 million$10.2 million, sold the most
2023$2.89 million$1.81 million$4.7 million
2024$1.94 million$1.08 million$3.02 million
2025$1.56 million$1.79 million$3.35 million
2026, 2026 so far$751,000$783,000$1.53 million

Did a relative own a share of this lease?

The bars show every year. Pick one to add up what the lease has sold since.

SourcesRailroad Commission Production Data Query, every monthly report since October 2018. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.

Who has run this lease

The operator changed two times, most recently in May 2026

The company named on each monthly report to the State. The operator is not always the company that pays.

  1. Crescent Energy Operating, LLCMay 2026 to now
  2. Silverbow Resources Oper, LLCNovember 2023 to April 2026
  3. Chesapeake Operating, L.L.C.October 2018 to October 2023

SourcesRailroad Commission production reports, the operator on each month’s report, October 2018 through August 2026.

The newest well, seen from the side

No well on the way. Well U 4H was completed in October 2018.

ground2,000 ft4,000 ft6,000 ftU 4H7,748 ft deep15,549 ft sideways
  1. Permit filedNot on file
  2. Drilling startedNot on file
  3. FrackedNot on file
  4. Completion filedOctober 16, 2018
  5. First production on the leaseNot on file
  6. First checkNot on file

SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 17, 2026.

Royalty Watch follows new well permits and completions on this lease.Watch this lease

About 6 miles across

Wells on this lease and around it

1this lease, ringed
58producing
5fracked and waiting
16permits, last 24 months
28plugged
30original land surveys

For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/pge-dos-01-286804-g"><img src="https://royaltyclerk.com/maps/lease-wells/pge-dos-01-286804-g.svg" alt="Map of the Pge Dos lease in Webb County, Texas: its well ringed, among 148 wells and 16 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/pge-dos-01-286804-g">Wells on the Pge Dos lease, Webb County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

From the State's well records

One well on this lease

Wells on Pge Dos
WellAPI numberCompletedSidewaysfeetDepthfeetToday
U 4H42-479-43953October 201815,5497,748Shut in

SourceRailroad Commission wellbore and completion records.

What the drilling permits say

15,729acres on the newest permit

15,729 ACRES
  • 15,729 acres, on the 2018 permits
Check your decimal on this lease

Gas, August 2026, dollars per thousand cubic feet New

Four prices for the same gas

What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.

$2.78
The marketHenry Hub, August 2026
$2.35
−$0.4315.5% lower
Told its investorsCrescent Energy Company, July to September 2026
not on file yet
Told the tax officeTexas Comptroller, this lease
?
Your statementonly you hold this one
On recordA lower tax is on record

The State approved a lower tax for this lease

Kind
High Cost Gas Reduced Tax Rate
Wells
The whole lease
Runs
October 2018 to September 2028
Rate
0.00% 7.50%

Look at the tax line on your statement for this lease. The record says which rate applies.

Estimate your royalty

Type the decimal from your division order

The starting decimal is an example. Nothing you type here leaves this page.

$851a month

At these prices the whole lease’s reported sales were about $2.61 million over 12 reported months. Your estimated share is $10,200 before taxes and deductions.

Monthly owner volumes and values
Estimated share before tax and deductions
MonthOil (bbl)Oil valueGas (mcf)Gas valueTotal
August 20260.1563$13.110.4492$1.25$14.36
July 20260$0.000$0.00$0.00
June 20260$0.000$0.00$0.00
May 20265.2539$536.58102.2461$300.60$837.18
April 20267.3516$737.51157.1602$435.33$1,172.84
March 20267.4766$683.21157.7813$479.66$1,162.86
February 20267.2344$466.69152.6875$552.73$1,019.42
January 20268.2891$497.68167.0156$1,289.36$1,787.04
December 20258.5977$498.41165.125$703.43$1,201.84
November 20257.1914$431.92161.9961$613.97$1,045.88
October 20257.9375$483.31166.0234$529.61$1,012.93
September 20257.3125$467.71164.5039$488.58$956.28

SourcesMarket: U.S. Energy Information Administration (Henry Hub for gas, taken per thousand cubic feet; WTI Cushing for oil). Investors: Crescent Energy Company, Form 10-Q, Q3 2026, company-wide. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.

Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus

Who takes the oil and gasNew

No buyer shares an owner with the operator

The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.

GAS
Runs the leaseCrescent Energy Operating, LLCsince May 2026
Gathers 100%WILLIAMS MLP OPERATING LLCsince October 2018
Buys 100%CHESAPEAKE ENERGY MKTG, L.L.C.since October 2018

No shared owner, officer or address on record between the gas buyers and the operator.

OIL
Runs the leaseCrescent Energy Operating, LLCsince May 2026
Gathers 100%CHESAPEAKE ENERGY MKTG, L.L.C.since October 2018

No shared owner, officer or address on record between the oil buyers and the operator.

SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.

Royalty Watch tells you the day the buyer of your oil or gas changes.Watch this lease

Seen from space, 2025New

No satellite heat at this pad in 2025

Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.

A-171 · SEC. 14 · BLK 8 · I&GN RR COA-174 · SEC. 17 · BLK 8 · I&GN RR COA-403 · SEC. 1267 · AB&MA-674 · SEC. 2209 · ELLEY, GA-175 · SEC. 18 · BLK 8 · I&GN RR COA-435 · SEC. 24 · I&GN RR COA-705 · SEC. 2220 · STAPP, H SONE SATELLITE PIXEL, ABOUT 375 M
DAYNIGHT, 2025
Each dot is a nightFlaring reported
JAN0110 mcf
FEB011 mcf
MAR07 mcf
APR02 mcf
MAY054 mcf
JUN03 mcf
JUL0904 mcf
AUG093 mcf
SEP0122 mcf
OCT0112 mcf
NOV0104 mcf
DEC0202 mcf

A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.

0

nights with heat recorded at this pad, 2025.

12

months in which flaring was reported, 1,724 thousand cubic feet in all.

0

months with heat seen and no flaring reported.

Where the gas went in 2025, as the operator reported it

94.8%Sold510,305 thousand cubic feet
4.87%Used on the lease26,188 thousand cubic feet
0.32%Flared or vented1,724 thousand cubic feet

SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 16, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.

Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus

Where the gas went, month by month

Since Sep 2024 the lease's gas goes to a transmission line instead of a processing plant

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

Since Sep 2024 the lease's gas goes to a transmission line instead of a processing plantShare of Pge Dos gas by disposition code each month, September 2023 to August 2026. Since Sep 2024 the lease's gas goes to a transmission line instead of a processing plant. 0.4% of the gas was flared in the last 12 months. No month above 3%.Share of the lease’s gas by disposition code, per month0%50%100%Sep 2024: plant to lineOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Sep 2024 the lease's gas goes to a transmission line instead of a processing plantShare of Pge Dos gas by disposition code each month, September 2023 to August 2026. Since Sep 2024 the lease's gas goes to a transmission line instead of a processing plant. 0.4% of the gas was flared in the last 12 months. No month above 3%.Share of gas by disposition code0%50%100%Sep 24: plant to lineJan 24JulJan 25JulJan 26Jul
  • Transmission line (2)100% · 438,178 mcf
  • Flared (4)0.4% · 1,845 mcf
  • Lease fuel (1)0.0% · 106 mcf

0.4% of the gas was flared in the last 12 months. No month above 3%.

SourcesRailroad Commission production reports, gas disposition by code, September 2023 to August 2026.

The county appraisal roll

No public roll figures

County mineral roll

No public roll figures

There are no publishable figures for this lease from the 2026 county mineral roll.

Royalty Clerk has mineral rolls for 158 Texas counties.

Source County appraisal district mineral rolls.

From the state record

What owners ask about Pge Dos

01When is the check for August 2026 due?
August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Oct 30, 2026 and the gas by Nov 29, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
See your next three checks
02Which Texas production tax rate applies?
The Texas Comptroller lists high cost gas reduced tax rate for this lease, from Oct 1, 2018 to Sep 30, 2028, at 0% in place of 7.5%. That is for August 2026.
Source: Texas Comptroller, approved severance tax exemptions.
Check the tax on your stub
03Who buys the oil and gas?
CONDChesapeake Energy Mktg, L.l.c.100%
GASChesapeake Energy Mktg, L.l.c.100%
Condensate: Chesapeake Energy Mktg, L.l.c. gathers it. Gas from gas wells: Chesapeake Energy Mktg, L.l.c. buys it; Williams Mlp Operating LLC gathers it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
See every buyer and past buyers
04How many 1099s should an owner expect for 2025?
1January to December 2025: one operator of record in all 12 months
One company, Silverbow Resources Oper, LLC, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
Source: Railroad Commission production reports, operator of record by month.
Check your 1099 against it

Every monthly report the State holds

95 months, newest first

Ledger for Pge Dos
MonthOil soldbarrelsGas soldthousand cubic feetFlared or ventedthousand cubic feetSold forat public pricesOperator
AugustAug 2026401150$3,680Crescent Energy Operating, LLC
JulyJul 2026No oil or gas reportedCrescent Energy Operating, LLC
JuneJun 2026No oil or gas reportedCrescent Energy Operating, LLC
MayMay 20261,34526,17527$214,000Crescent Energy Operating, LLC
AprilApr 20261,88240,23365$300,000Silverbow Resources Oper, LLC
MarchMar 20261,91440,39282$298,000Silverbow Resources Oper, LLC
FebruaryFeb 20261,85239,08832$261,000Silverbow Resources Oper, LLC
JanuaryJan 20262,12242,756102$457,000Silverbow Resources Oper, LLC
DecemberDec 20252,20142,272202$308,000Silverbow Resources Oper, LLC
NovemberNov 20251,84141,471104$268,000Silverbow Resources Oper, LLC
OctoberOct 20252,03242,502112$259,000Silverbow Resources Oper, LLC
SeptemberSep 20251,87242,113122$245,000Silverbow Resources Oper, LLC
AugustAug 20252,04546,14093$267,000Silverbow Resources Oper, LLC
JulyJul 20251,26034,921904$198,000Silverbow Resources Oper, LLC
JuneJun 20252,02645,3903$275,000Silverbow Resources Oper, LLC
MayMay 20252,19046,69954$282,000Silverbow Resources Oper, LLC
AprilApr 20252,23250,1432$313,000Silverbow Resources Oper, LLC
MarchMar 20251,28627,2147$200,000Silverbow Resources Oper, LLC

SourcesTexas Railroad Commission Production Data Query, through August 2026. Prices: EIA.

Do your checks match this lease?

Check my statement

Likely owed Jan 2025

A whole month was never paid

The state shows 28,175 bbl of oil sold from this lease in January 2025, so your share is 27.51 bbl. No statement covers January 2025. That is the month the operator changed from Endeavor Energy Resources to Diamondback.

Ask Diamondback owner relations: is January 2025 being held in suspense after the change of operator?

$2,277oil + gas

A sample finding, from our example check. The full example found $3,328 likely owed.

Around this lease

Nearby

Crescent Energy Operating, LLC in Webb County

All Crescent Energy Operating, LLC leases

Briscoe Ranch (Eagleford) field

All leases in this field

Leases within 10 km

Drilling permits within 10 km

  • LOMA BLANCA #202Hnew drill · horizontal · Fasken Oil and Ranch, Ltd. · Sept 17, 2026 · 7.6 km
  • LOMA BLANCA #201Hnew drill · horizontal · Fasken Oil and Ranch, Ltd. · Sept 17, 2026 · 7.6 km
  • GATES 07-DR #1023Hnew drill · horizontal · Lewis Petro Properties, Inc. · Aug 6, 2026 · 9.6 km
  • GATES 07-DR #1021Hnew drill · horizontal · Lewis Petro Properties, Inc. · Aug 6, 2026 · 9.6 km
  • GATES 07-DR #1020Hnew drill · horizontal · Lewis Petro Properties, Inc. · Aug 6, 2026 · 9.6 km

Same name in district 01

Sister leases

Where it sits

This county

Webb CountyWebbLa SalleDimmitWebb County
Webb County

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells
  • Texas Comptroller tax approvals, lease values
  • U.S. Energy Information Administration prices
  • SEC EDGAR company filings
  • FracFocus frac dates
  • NOAA storms and cold
  • NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
  • U.S. Geological Survey photos