Skip to content
Royalty Clerk

Texas oil lease

Producing

PITZER 8

Pitzer 8 is an oil lease in Ward County, Texas, operated by Apache Corporation in the Phantom (Wolfcamp) field.

3 wells

24bbl oil, last 12 months−100% vs prior year
RRC lease
08-42260

Is your check right?

Check my statement

Where it sits

This county

Ward CountyWardWinklerCraneLovingReevesEctorWard County
Ward County
Gas, last 12 months
3 mcf
Oil in Jul 2026
6 bbl

Production by month

Oil output fell 100% over the last 12 months

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output fell 100% over the last 12 monthsMonthly oil production and gas for PITZER 8, Aug 2023 to Jul 2026. Oil output fell 100% over the last 12 months. 24 bbl in the 12 months through Jul 2026, against 6,522 bbl in the 12 months before.Last 12 months: 24 bblbbl per monthmcf per month002502505005007507501,0001,0001,2501,250Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 100% over the last 12 monthsMonthly oil production and gas for PITZER 8, Aug 2023 to Jul 2026. Oil output fell 100% over the last 12 months. 24 bbl in the 12 months through Jul 2026, against 6,522 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month002502505005007507501,0001,0001,2501,250Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plant

Flaring peaked at 100.0% of the gas in May 2025.

  • Processing plant (3)
  • Transmission line (2)
  • Flared (4)
Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plantShare of PITZER 8 gas by disposition code each month, Aug 2023 to Jul 2026. Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plant. Flaring peaked at 100.0% of the gas in May 2025.Share of the lease’s gas by disposition code, per month0%50%100%Aug 2024: plant to lineFlared 100.0%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plantShare of PITZER 8 gas by disposition code each month, Aug 2023 to Jul 2026. Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plant. Flaring peaked at 100.0% of the gas in May 2025.Share of gas by disposition code0%50%100%Aug 24: plant to lineFlared 100.0%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Processing plant (3)

    84% · 3,108 mcf

  • Transmission line (2)

    15% · 553 mcf

  • Flared (4)

    1.0% · 37 mcf

1.0% of the gas flared in the last 12 months. One month above 3%.

Who has run this lease

The operator changed once, most recently in Aug 2024

Operators of this lease over timeCallon Petroleum Operating Co, Jan 2020 to Jul 2024; Apache Corporation, Aug 2024 to Jul 20262020202120222023202420252026Changed Aug 2024Callon Petroleum Operating CoJan 2020 to Jul 2024Apache CorporationAug 2024 to now
Operators of this lease over timeCallon Petroleum Operating Co, Jan 2020 to Jul 2024; Apache Corporation, Aug 2024 to Jul 20262020202120222023202420252026Changed Aug 2024Callon Petroleum Operating CoJan 2020 to Jul 2024Apache CorporationAug 2024 to now

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

3 wells on this lease

Wells on PITZER 8
API numberWell no.Status
42-475-356441HActive
42-475-358862HActive
42-475-362943HShut-in

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Enterprise Crude Pipeline LLCOilGathers80Sep 11, 2019–
Enterprise Crude Oil LLCOilGathers10Sep 11, 2019–
Rio Energy International, Inc.OilGathers10Sep 17, 2018–
Targa Midstream Services LLCCasinghead gasBuys100Sep 17, 2018–
Targa Midstream Services LLCCasinghead gasGathers100Jul 1, 2011–
Enterprise Crude Pipeline LLCOilGathers90Sep 17, 2018Sep 11, 2019

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

400.90 acres on the newest permit

The wells on this lease state different acreage

The permits state between 400.9 and 652.9 acres.

Permits for Pitzer 8
API numberWell no.Acreson the permit
42-475-362943H400.90
42-475-358862H652.90
42-475-356441H612.90

SourceRailroad Commission drilling permits, Sep 26, 2026 (source 1, source 2).

What APA Corporation told investors it received

Apache Corporation is linked to APA Corporation (APA).
Realized prices reported by APA Corporation
QuarterOil$ per bblFiling
Q2 2026$98.24SEC filing
Q1 2026$78.69SEC filing
Q4 2025$61.03SEC filing
Q3 2025$67.43SEC filing
Q2 2025$65.58SEC filing
Q1 2025$73.73SEC filing

SourceAPA Corporation quarterly reports, SEC EDGAR, company-wide averages before hedging.

Estimate your royalty

36 months, newest first

Ledger for PITZER 8
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 2026Apache Corporation60000$80.46$2.89
Jun 2026Apache Corporation00000$84.81$3.15
May 2026Apache Corporation80000$102.13$2.94
Apr 2026Apache Corporation00000$100.32$2.77
Mar 2026Apache Corporation00000$91.38$3.04
Feb 2026Apache Corporation00000$64.51$3.62
Jan 2026Apache Corporation00000$60.04$7.72
Dec 2025Apache Corporation00000$57.97$4.26
Nov 2025Apache Corporation00000$60.06$3.79
Oct 2025Apache Corporation00000$60.89$3.19
Sep 2025Apache Corporation05000$63.96$2.97
Aug 2025Apache Corporation1072330$64.86$2.91
Jul 2025Apache Corporation488620000$68.39$3.20
Jun 2025Apache Corporation401567000$68.17$3.02
May 2025Apache Corporation16315932032$62.17$3.12
Apr 2025Apache Corporation9048946306255$63.54$3.42
Mar 2025Apache Corporation167233000$68.24$4.12
Feb 2025Apache Corporation299281000$71.53$4.19
Jan 2025Apache Corporation32044010100$75.74$4.13
Dec 2024Apache Corporation75168324240$70.12$3.01
Nov 2024Apache Corporation81675643430$69.95$2.12
Oct 2024Apache Corporation64764324240$71.99$2.20
Sep 2024Apache Corporation77281284840$70.24$2.28
Aug 2024Apache Corporation7947593063060$76.68$1.99
Jul 2024Callon Petroleum7067786956950$81.80$2.07
Jun 2024Callon Petroleum9208369149140$79.77$2.54
May 2024Callon Petroleum8618679339330$80.02$2.12
Apr 2024Callon Petroleum5835195205200$85.35$1.60
Mar 2024Callon Petroleum6085952552550$81.28$1.49
Feb 2024Callon Petroleum9001,0419329320$77.25$1.72
Jan 2024Callon Petroleum9927801,1311,11516$74.15$3.18
Dec 2023Callon Petroleum1,1539079129120$71.90$2.52
Nov 2023Callon Petroleum1,1311,0281,2221,2220$77.69$2.71
Oct 2023Callon Petroleum1,2471,1431,2491,2490$85.64$2.98
Sep 2023Callon Petroleum9611,0758798790$89.43$2.64
Aug 2023Callon Petroleum1,0161,5121,0951,0950$81.39$2.58

Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Sep 28, 2026.

How to check your stub against this lease

Do your checks match this lease?

Nearby

Leases within 10 km

Drilling permits within 10 km