Skip to content

Texas gas well · RRC district 01 · Lease 270641

Producing

RYAN

Ryan is a gas well in McMullen County, Texas, operated by BPX Operating Company in the Hawkville (Eagleford Shale) field. The Railroad Commission shows 48,384 mcf of gas in the 12 months through Jul 2026.

Gas well dossier · 1 well

48,384mcf gas, last 12 months−18% vs prior year
RRC lease
01-270641

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

McMullen CountyMcMullenLA SalleAtascosaKarnesFrioLive OakMcMullen County
McMullen County · RRC district 01Open McMullen County →
Oil, last 12 months
72 bbl
Gas in Jul 2026
3,495 mcf
Reporting to the state
since Jan 2020
Wells
1

Production

Month by month, from the state record

What the Railroad Commission says this gas well produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Gas output fell 18% over the last 12 months

48,384 mcf in the 12 months through Jul 2026, against 59,295 mcf in the 12 months before.

  • Gas (bars, left axis)
  • Oil (line, right axis)
  • Last 12 months
Gas output fell 18% over the last 12 monthsMonthly gas production and oil for RYAN, Aug 2023 to Jul 2026. Gas output fell 18% over the last 12 months. 48,384 mcf in the 12 months through Jul 2026, against 59,295 mcf in the 12 months before.Last 12 months: 48,384 mcfmcf per monthbbl per month002,500205,000407,5006010k80Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Gas output fell 18% over the last 12 monthsMonthly gas production and oil for RYAN, Aug 2023 to Jul 2026. Gas output fell 18% over the last 12 months. 48,384 mcf in the 12 months through Jul 2026, against 59,295 mcf in the 12 months before.Last 12 monthsmcf per monthbbl per month002,500205,000407,5006010k80Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas well 270641, district 01. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

Over 99% of the gas went to a processing plant in the last 12 months

Each bar is one month. Colors are the disposition codes the operator reported.

  • Processing plant (3)
  • Lease fuel (1)
  • Flared (4)
Over 99% of the gas went to a processing plant in the last 12 monthsShare of RYAN gas by disposition code each month, Aug 2023 to Jul 2026. Over 99% of the gas went to a processing plant in the last 12 months. Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Over 99% of the gas went to a processing plant in the last 12 monthsShare of RYAN gas by disposition code each month, Aug 2023 to Jul 2026. Over 99% of the gas went to a processing plant in the last 12 months. Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 270641, district 01. Reported through Jul 2026.

Processing plant (3)

Sent to a gas plant that pulls out natural gas liquids. Your statement should show plant products, and may show processing fees.

Lease fuel (1)

Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.

Flared (4)

Burned off or vented, not sold. It pays no royalty. More than 3% in a month is worth watching.

Over the last 12 months, 0.1% of the gas was flared. No month went above 3%.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

BPX Operating Company has reported this lease for the whole period

No change of operator in the months we hold.

Operators of this lease over timeBPX Operating Company, Jan 2020 to Jul 20262020202120222023202420252026BPX Operating CompanyJan 2020 to nowthrough Jul 2026
Operators of this lease over timeBPX Operating Company, Jan 2020 to Jul 20262020202120222023202420252026BPX Operating CompanyJan 2020 to nowthrough Jul 2026

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to gas well 270641 in district 01. The API number is the state’s ID for a well.
Wells on RYAN
API numberWell no.Status
42-311-351344HActive

SourceTexas Railroad Commission Wellbore Query, district 01, lease 270641.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Condensate

    Bp Products North America Inc. gathers it.

    100% of it, on the list since Aug 1, 2019

  • Gas from gas wells

    Bp Energy Co. buys it; Bpx Eagleford Jv Holdings LLC gathers it.

    Bp Energy Co. buys it: 100% of it, on the list since Aug 1, 2019 · Bpx Eagleford Jv Holdings LLC gathers it: 100% of it, on the list since Jan 1, 2026

Companies that used to be listed: Bpx (Eagle Ford) Gathering LLC (gathers it, until Jan 1, 2026); Eastex Crude Company (gathers it, until Aug 1, 2019); Shell Trading (Us) Company (gathers it, until Aug 1, 2019); Bhp Billiton Pet (Tx Gath), LLC (gathers it, until Aug 1, 2019); Bhp Billiton Pet(Txla Op) CO (buys it, until Aug 1, 2019).

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

11,259.58 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
1
First completion
Nov 27, 2012
Latest permit
Oct 2, 2012
Wells and acres on the permits for Ryan
API numberWell no.Acreson the permit
42-311-351344H11,259.58

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says RYAN sold each month.

For example 0.00097656, or a fraction like 1/1024.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Gas sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for RYAN
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026BPX Operating003,4953,48411$80.46$2.89
Jun 2026BPX Operating2403,5613,5610$84.81$3.15
May 2026BPX Operating3404,1284,1280$102.13$2.94
Apr 2026BPX Operating003,6893,6890$100.32$2.77
Mar 2026BPX Operating003,6993,6990$91.38$3.04
Feb 2026BPX Operating002,5822,53547$64.51$3.62
Jan 2026BPX Operating004,0264,0260$60.04$7.72
Dec 2025BPX Operating004,4504,4500$57.97$4.26
Nov 2025BPX Operating004,3814,3810$60.06$3.79
Oct 2025BPX Operating004,7454,7450$60.89$3.19
Sep 2025BPX Operating1404,6724,6720$63.96$2.97
Aug 2025BPX Operating004,9564,9479$64.86$2.91
Jul 2025BPX Operating005,8865,8010$68.39$3.20
Jun 2025BPX Operating005,4465,35314$68.17$3.02
May 2025BPX Operating005,0144,9360$62.17$3.12
Apr 2025BPX Operating003,6233,5600$63.54$3.42
Mar 2025BPX Operating005,5865,47316$68.24$4.12
Feb 2025BPX Operating004,3914,3150$71.53$4.19
Jan 2025BPX Operating0525,4215,3310$75.74$4.13
Dec 2024BPX Operating1705,4905,3990$70.12$3.01
Nov 2024BPX Operating2706,7016,5940$69.95$2.12
Oct 2024BPX Operating007,3697,2490$71.99$2.20
Sep 2024BPX Operating0443,9743,9130$70.24$2.28
Aug 2024BPX Operating2303943880$76.68$1.99
Jul 2024BPX Operating006536440$81.80$2.07
Jun 2024BPX Operating006206120$79.77$2.54
May 2024BPX Operating402,0101,9810$80.02$2.12
Apr 2024BPX Operating52284,5344,4680$85.35$1.60
Mar 2024BPX Operating003,6163,5660$81.28$1.49
Feb 2024BPX Operating64438,5538,53221$77.25$1.72
Jan 2024BPX Operating006206200$74.15$3.18
Dec 2023BPX Operating42327267260$71.90$2.52
Nov 2023BPX Operating003,4713,4710$77.69$2.71
Oct 2023BPX Operating1302,4722,4720$85.64$2.98
Sep 2023BPX Operating3104394390$89.43$2.64
Aug 2023BPX Operating47472,4562,40056$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for RYAN. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask BPX Operating Company.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

BPX Operating Company in McMullen County

All BPX Operating Company leases →

Hawkville (Eagleford Shale) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

  • RYAN

    18,375 mcf last 12 months · 0.1 km away

  • RYAN ISLAND

    2,520,902 mcf last 12 months · 1 km away

  • RYAN ISLAND

    2,691,567 mcf last 12 months · 1 km away

  • RYAN ISLAND

    1,088,114 mcf last 12 months · 1 km away

  • RYAN ISLAND

    1,592,404 mcf last 12 months · 1 km away

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Gas sold” volume for the month the check covers and multiply it by your decimal. The answer should match the mcf on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, gas well 270641, district 01, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.