Skip to content
Royalty Clerk

Texas gas well

Producing

SALLY RIDE

Sally Ride is a gas well in San Augustine County, Texas, operated by Adamas Energy LLC in the Carthage (Haynesville Shale) field.

1 well

786,611mcf gas, last 12 months−33% vs prior year
RRC lease
06-293537

Is your check right?

Check my statement

Where it sits

This county

San Augustine CountySan AugustineNacogdochesShelbySabineAngelinaSan Augustine County
San Augustine County
Gas in Jul 2026
53,287 mcf
Reporting since
Nov 2022

Checks stopped on this lease?

  • Operator

    Operator changed: Adamas Energy LLC took over from Aethon Energy Operating LLC in Mar 2026.

SourceRailroad Commission production, P-5 and P-4 records, data through Jul 2026.

See why checks stop on this lease

Production by month

Gas output fell 33% over the last 12 months

  • Gas (bars)
  • Last 12 months
Gas output fell 33% over the last 12 monthsMonthly gas production for SALLY RIDE, Aug 2023 to Jul 2026. Gas output fell 33% over the last 12 months. 786,611 mcf in the 12 months through Jul 2026, against 1,182,341 mcf in the 12 months before.Last 12 months: 786,611 mcfmcf per month0100k200k300k400kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Gas output fell 33% over the last 12 monthsMonthly gas production for SALLY RIDE, Aug 2023 to Jul 2026. Gas output fell 33% over the last 12 months. 786,611 mcf in the 12 months through Jul 2026, against 1,182,341 mcf in the 12 months before.Last 12 monthsmcf per month0100k200k300k400kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

99% of the gas went to a transmission line in the last 12 months

  • Transmission line (2)
  • Lease fuel (1)
99% of the gas went to a transmission line in the last 12 monthsShare of SALLY RIDE gas by disposition code each month, Aug 2023 to Jul 2026. 99% of the gas went to a transmission line in the last 12 months.Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
99% of the gas went to a transmission line in the last 12 monthsShare of SALLY RIDE gas by disposition code each month, Aug 2023 to Jul 2026. 99% of the gas went to a transmission line in the last 12 months.Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Transmission line (2)

    99% · 782,359 mcf

  • Lease fuel (1)

    0.5% · 4,252 mcf

Who has run this lease

The operator changed once, most recently in Mar 2026

Operators of this lease over timeAethon Energy Operating LLC, Nov 2022 to Feb 2026; Adamas Energy LLC, Mar 2026 to Jul 20262023202420252026Changed Mar 2026Aethon Energy Operating LLCNov 2022 to Feb 2026Adamas Energy LLCMar 2026 to now
Operators of this lease over timeAethon Energy Operating LLC, Nov 2022 to Feb 2026; Adamas Energy LLC, Mar 2026 to Jul 20262023202420252026Changed Mar 2026Aethon Energy Operating LLCNov 2022 to Feb 2026Adamas Energy LLCMar 2026 to now

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

1 well on this lease

Wells on SALLY RIDE
API numberWell no.Status
42-405-307473HActive

SourceTexas Railroad Commission Wellbore Query.

1,090.58 acres on the newest permit

  • Worth asking

    A Rule 37 case is listed

    The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.

Check your decimal on this lease
Permits for Sally Ride
API numberWell no.Acreson the permit
42-405-307473H1,090.58

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for SALLY RIDE
MonthGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 2026Adamas Energy53,28753,2870$80.46$2.89
Jun 2026Adamas Energy53,17953,1790$84.81$3.15
May 2026Adamas Energy58,70158,7010$102.13$2.94
Apr 2026Adamas Energy60,15359,6460$100.32$2.77
Mar 2026Adamas Energy64,27563,7510$91.38$3.04
Feb 2026Aethon Energy60,31059,8360$64.51$3.62
Jan 2026Aethon Energy69,93969,4150$60.04$7.72
Dec 2025Aethon Energy74,77074,2460$57.97$4.26
Nov 2025Aethon Energy77,95077,4430$60.06$3.79
Oct 2025Aethon Energy89,64589,2050$60.89$3.19
Sep 2025Aethon Energy37,07736,8490$63.96$2.97
Aug 2025Aethon Energy87,32586,8010$64.86$2.91
Jul 2025Aethon Energy94,00793,4830$68.39$3.20
Jun 2025Aethon Energy95,85295,3530$68.17$3.02
May 2025Aethon Energy107,841107,3170$62.17$3.12
Apr 2025Aethon Energy113,873113,8730$63.54$3.42
Mar 2025Aethon Energy128,454128,4540$68.24$4.12
Feb 2025Aethon Energy121,208121,2080$71.53$4.19
Jan 2025Aethon Energy126,237126,2370$75.74$4.13
Dec 2024Aethon Energy126,170126,1700$70.12$3.01
Nov 2024Aethon Energy127,962127,9620$69.95$2.12
Oct 2024Aethon Energy120,196120,1960$71.99$2.20
Sep 2024Aethon Energy20,54120,5410$70.24$2.28
Aug 2024Aethon Energy000$76.68$1.99
Jul 2024Aethon Energy28,35828,3580$81.80$2.07
Jun 2024Aethon Energy155,140155,1400$79.77$2.54
May 2024Aethon Energy169,619169,6190$80.02$2.12
Apr 2024Aethon Energy178,439178,4390$85.35$1.60
Mar 2024Aethon Energy197,573197,5730$81.28$1.49
Feb 2024Aethon Energy203,172203,1720$77.25$1.72
Jan 2024Aethon Energy227,423227,4230$74.15$3.18
Dec 2023Aethon Energy245,977245,9770$71.90$2.52
Nov 2023Aethon Energy220,818220,8180$77.69$2.71
Oct 2023Aethon Energy266,866266,8660$85.64$2.98
Sep 2023Aethon Energy278,664278,6640$89.43$2.64
Aug 2023Aethon Energy305,677305,6770$81.39$2.58

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Adamas Energy LLC in San Augustine County

All Adamas Energy LLC leases →

Carthage (Haynesville Shale) field

All leases in this field →

Leases within 10 km

Drilling permits within 10 km